[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-958265":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":12,"analysis":25},958265,695,1,"单选题","( )阶段的目的和任务是了解河流或河段的区域地质条件和各梯级的工程地质条件，以便选出水库、坝或引水线路的最适宜地段。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","规划",true,{"key":16,"text":17,"correct":18},"B","可行性研究",false,{"key":20,"text":21,"correct":18},"C","初步设计",{"key":23,"text":24,"correct":18},"D","技施设计","规划阶段工程地质勘察的主要任务是为河流(或河段)规划、进行开发方案的比选提供所需的地质资料；对近期开发的梯级库区和坝段的关键性工程地质问题进行初步的踏勘与论证。",{"id":6,"name":27,"category":28,"favorite":29},"专业知识（水利水电）","建筑工程",0]