[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-958263":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":22,"analysis":25},958263,695,1,"单选题","下列( )不是水利水电工程规划阶段地质勘察的任务和内容。",[11,15,18,21],{"key":12,"text":13,"correct":14},"A","了解各梯级水库的地质条件和主要工程地质问题，分析建库的可能性",false,{"key":16,"text":17,"correct":14},"B","调查水库区主要工程地质问题，并给出初步评价",{"key":19,"text":20,"correct":14},"C","进行天然建材的普查",{"key":22,"text":23,"correct":24},"D","进行地下水动态观测和岩土体位移监测",true,"规划阶段勘察工作方法是通过现场踏勘、工程地质测绘和必要的勘探，查明河流或河段的区域地质构造特征、地层岩性、河床地质结构以及可能出现的主要工程地质问题，普查天然建筑材料的分布及储量，不进行地下水的检测。",{"id":6,"name":27,"category":28,"favorite":29},"专业知识（水利水电）","建筑工程",0]