[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-958116":3},{"question":4,"library":27},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":25,"analysis":26},958116,695,2,"多选题","进行勘察、开采矿藏和各项建设工程，应当不占或者少占林地，必经占用或者征用林地的( )。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","经县级以上人民政府林业主管部门审核同意后，依法办理建设用地审批手续",true,{"key":16,"text":17,"correct":18},"B","经省级以上人民政府林业主管部门审核同意后，依法办理建设用地审批手续",false,{"key":20,"text":21,"correct":18},"C","由用地单位依照省级政府规定缴纳森林植被恢复费",{"key":23,"text":24,"correct":14},"D","由用地单位依照国务院规定缴纳森林植被恢复费","AD","《中华人民共和国森林法》第十八条进行勘查、开采矿藏和各项建设工程，应当不占或者少占林地；必须占用或者征用林地的，经县级以上人民政府林业主管部门审核同意后，依照有关土地管理的法律、行政法规办理建设用地审批手续，并由用地单位依照国务院有关规定缴纳森林植被恢复费。森林植被恢复费专款专用，由林业主管部门依照有关规定统一安排植树造林，恢复森林植被，植树造林面积不得少于因占用、征用林地而减少的森林植被面积。",{"id":6,"name":28,"category":29,"favorite":30},"专业知识（水利水电）","建筑工程",0]