[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-958074":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":24,"analysis":25},958074,695,2,"多选题","《水土保持前期工作暂行规定》将水土保持前期工作划分为( )。",[11,15,18,21],{"key":12,"text":13,"correct":14},"A","规划阶段",true,{"key":16,"text":17,"correct":14},"B","项目建议书阶段",{"key":19,"text":20,"correct":14},"C","可行性研究阶段",{"key":22,"text":23,"correct":14},"D","初步设计阶段","ABCD","水土保持前期工作划分为规划、项目建议书、可行性研究、初步设计四个阶段。",{"id":6,"name":27,"category":28,"favorite":29},"专业知识（水利水电）","建筑工程",0]