[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-957784":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":22,"analysis":25},957784,694,1,"单选题","相关分析的参证资料应满足条件不包括( )。",[11,15,18,21],{"key":12,"text":13,"correct":14},"A","与设计变量在成因上有密切联系",false,{"key":16,"text":17,"correct":14},"B","与设计变量有较长的平行观测资料",{"key":19,"text":20,"correct":14},"C","有足够长的实测系列",{"key":22,"text":23,"correct":24},"D","必须是径流系列",true,"相关分析的参证资料一般应满足条件：①参证变最要与没计变量在成因上有密切联系，这样才能保证使设计变量与参证变量的时序变化具有同步性，从而使插补展延成果具有可靠性；②参证变量与设计变量要有相当长的平行观测资料，以便建立可靠的相关关系；③参证变量必须具有足够长的实测系列，除用以建立相关关系的同期观测资料以外，还要用来插补延长设计变量缺测年份的资料。",{"id":6,"name":27,"category":28,"favorite":29},"专业基础知识（水利水电）","建筑工程",0]