[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-693-5":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":599},{"id":5,"name":6,"category":7,"favorite":8},693,"专业案例（水利水电）","建筑工程",0,5,50,822,[13,34,46,58,70,82,94,106,117,129,141,153,165,177,189,201,213,222,233,245,253,265,277,289,301,313,325,337,349,361,373,385,397,409,421,433,445,454,464,476,485,497,509,520,532,544,556,568,576,588],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":27,"analysis":33},956980,1,"单选题","各规划梯级坝区的工程地质勘察布置应以( )为主。",[19,23,26,30],{"key":20,"text":21,"correct":22},"A","工程地质钻探",false,{"key":24,"text":25,"correct":22},"B","工程地质钻探和工程物探",{"key":27,"text":28,"correct":29},"C","工程地质测绘和地面物探",true,{"key":31,"text":32,"correct":22},"D","工程地质测绘和工程地质试验","",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":24,"analysis":33},956981,"各规划梯级坝址的工程地质勘察应进行天然建筑材料( )。",[38,40,42,44],{"key":20,"text":39,"correct":22},"调查",{"key":24,"text":41,"correct":29},"普查",{"key":27,"text":43,"correct":22},"初查",{"key":31,"text":45,"correct":22},"详查",{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":24,"analysis":33},956982,"根据《堤防工程地质勘察规范》(SL188—2005)规定，对新建堤防下列哪项勘察工作应在初步设计阶段进行？( )",[50,52,54,56],{"key":20,"text":51,"correct":22},"对各堤线工程地质条件进行比较，对选定线路主要工程地质问题进行初步评价，并对堤线工程地质条件进行初步的分段评价",{"key":24,"text":53,"correct":29},"对地基的渗漏、渗透稳定、抗滑稳定、饱和砂土振动液化、振陷、沉陷变形等问题进行评价，并对堤线进行分段工程地质评价，提出处理措施的建议",{"key":27,"text":55,"correct":22},"基本查明基岩浅埋或出露区基岩的时代及岩性特征、岩层产状、风化程度、喀斯特发育特征、岩土接触面起伏变化情况等",{"key":31,"text":57,"correct":22},"对招标设计报告评审中要求补充论证的和施工中出现的工程地质问题进行勘察",{"id":59,"libraryId":5,"type":15,"typeLabel":16,"stem":60,"options":61,"answer":20,"analysis":33},956983,"根据《水利水电工程地质勘察规范》(GB50487—2008)规定，可行性研究阶段坝址区的工程地质测绘应采用的比例尺为( )。",[62,64,66,68],{"key":20,"text":63,"correct":29},"1：2000～1：10000",{"key":24,"text":65,"correct":22},"1：5000～1：2000",{"key":27,"text":67,"correct":22},"1：5000～1：10000",{"key":31,"text":69,"correct":22},"1：50000～1：100000",{"id":71,"libraryId":5,"type":15,"typeLabel":16,"stem":72,"options":73,"answer":27,"analysis":33},956984,"根据《水利水电工程地质勘察规范》(GB50487—2008)规定，可行性研究阶段峡谷河流坝址勘察时，各比选坝址应布置一条勘探剖面线，坝高( )m及以上的主要坝址，应在主要勘探剖面线上、下游增加辅助剖面线。",[74,76,78,80],{"key":20,"text":75,"correct":22},"30",{"key":24,"text":77,"correct":22},"50",{"key":27,"text":79,"correct":29},"70",{"key":31,"text":81,"correct":22},"100",{"id":83,"libraryId":5,"type":15,"typeLabel":16,"stem":84,"options":85,"answer":31,"analysis":33},956985,"根据《水利水电工程地质勘察规范》(GB50487-2008)规定，应在( )阶段查明各类水利水电工程建筑物区的工程地质条件，对存在的工程地质问题进行分析评价，为建筑物设计和地基处理方案提供地质资料和建议。",[86,88,90,92],{"key":20,"text":87,"correct":22},"规划",{"key":24,"text":89,"correct":22},"项目建议书",{"key":27,"text":91,"correct":22},"可行性研究",{"key":31,"text":93,"correct":29},"初步设计",{"id":95,"libraryId":5,"type":15,"typeLabel":16,"stem":96,"options":97,"answer":20,"analysis":33},956986,"根据《水利水电工程地质勘察规范》(GB50487—2008)要求，规划阶段水库区工程地质勘察的内容应包括( )。",[98,100,102,104],{"key":20,"text":99,"correct":29},"了解可能威胁水库安全的滑坡、潜在不稳定岸坡、泥石流等的分布范围，并分析其可能影响",{"key":24,"text":101,"correct":22},"调查库岸稳定条件，初步预测水库运行后的坍岸形式和范围",{"key":27,"text":103,"correct":22},"初步查明可能产生浸没地段的地质和水文地质条件，预测水库浸没范围和严重程度",{"key":31,"text":105,"correct":22},"提出施工期和运行期工程地质监测内容、布置方案和技术要求的建议",{"id":107,"libraryId":5,"type":15,"typeLabel":16,"stem":108,"options":109,"answer":24,"analysis":33},956987,"规划阶段坝址区的工程地质测绘峡谷区应采用( )的比例尺。",[110,111,113,115],{"key":20,"text":65,"correct":22},{"key":24,"text":112,"correct":29},"1：10000～1：5000",{"key":27,"text":114,"correct":22},"1：25000～1：10000",{"key":31,"text":116,"correct":22},"1：50000～1：10000",{"id":118,"libraryId":5,"type":15,"typeLabel":16,"stem":119,"options":120,"answer":27,"analysis":33},956988,"规划阶段坝址区的工程地质勘察在有重大工程地质问题段，以及近期开发工程的坝段可布置( )。",[121,123,125,127],{"key":20,"text":122,"correct":22},"工程物探",{"key":24,"text":124,"correct":22},"大量勘探工作",{"key":27,"text":126,"correct":29},"少量勘探工作",{"key":31,"text":128,"correct":22},"少量现场原位力学试验",{"id":130,"libraryId":5,"type":15,"typeLabel":16,"stem":131,"options":132,"answer":24,"analysis":33},956989,"规划阶段坝址区工程地质测绘，当比较坝址相距( )km以上时可分别单独进行地质测绘。",[133,135,137,139],{"key":20,"text":134,"correct":22},"1",{"key":24,"text":136,"correct":29},"2",{"key":27,"text":138,"correct":22},"3",{"key":31,"text":140,"correct":22},"4",{"id":142,"libraryId":5,"type":15,"typeLabel":16,"stem":143,"options":144,"answer":31,"analysis":33},956990,"规划阶段坝址区工程地质测绘的范围应包括( )。",[145,147,149,151],{"key":20,"text":146,"correct":22},"枢纽布置地段",{"key":24,"text":148,"correct":22},"永久建筑物和临时建筑物",{"key":27,"text":150,"correct":22},"施工场地及其枢纽布置地段",{"key":31,"text":152,"correct":29},"各可能比较坝址及其枢纽布置地段",{"id":154,"libraryId":5,"type":15,"typeLabel":16,"stem":155,"options":156,"answer":24,"analysis":33},956991,"规划阶段坝址轴线勘探剖面基岩钻孔应进行( )。",[157,159,161,163],{"key":20,"text":158,"correct":22},"取岩样试验",{"key":24,"text":160,"correct":29},"压水试验",{"key":27,"text":162,"correct":22},"孔内声波测试",{"key":31,"text":164,"correct":22},"孔内电视录像",{"id":166,"libraryId":5,"type":15,"typeLabel":16,"stem":167,"options":168,"answer":24,"analysis":33},956992,"规划阶段坝址轴线勘探剖面上可布置( )个钻孔，近期开发工程可适当增加。",[169,171,173,175],{"key":20,"text":170,"correct":22},"1～2",{"key":24,"text":172,"correct":29},"1～3",{"key":27,"text":174,"correct":22},"2～5",{"key":31,"text":176,"correct":22},"3～5",{"id":178,"libraryId":5,"type":15,"typeLabel":16,"stem":179,"options":180,"answer":27,"analysis":33},956993,"规划阶段堤防工程勘察的主要内容不包括( )。",[181,183,185,187],{"key":20,"text":182,"correct":22},"了解区域地质构造稳定性和历史地震",{"key":24,"text":184,"correct":22},"了解主要地层成因类型、分布概况、性质和存在的主要工程地质问题",{"key":27,"text":186,"correct":29},"基本查明物理地质现象的发育情况、形成原因及分布范围，并分析其对工程的影响",{"key":31,"text":188,"correct":22},"了解工程区附近天然建筑材料分布情况，并估算储量",{"id":190,"libraryId":5,"type":15,"typeLabel":16,"stem":191,"options":192,"answer":24,"analysis":33},956994,"规划阶段对于峡谷地区坝址两岸勘察宜布置( )。",[193,195,197,199],{"key":20,"text":194,"correct":22},"物探剖面",{"key":24,"text":196,"correct":29},"勘探平硐",{"key":27,"text":198,"correct":22},"坑槽探",{"key":31,"text":200,"correct":22},"钻探",{"id":202,"libraryId":5,"type":15,"typeLabel":16,"stem":203,"options":204,"answer":31,"analysis":33},956995,"规划阶段各梯级坝址勘察内容不包括( )。",[205,207,209,211],{"key":20,"text":206,"correct":22},"了解第四纪沉积的成因类型，两岸及河床覆盖层的厚度、层次和组成物质，特殊土的分布及土的渗透性",{"key":24,"text":208,"correct":22},"了解坝址的地质构造、大断层、缓倾角断层和第四纪断层的发育情况",{"key":27,"text":210,"correct":22},"了解透水层和隔水层的分布情况，地下水埋深及补给、径流、排泄条件",{"key":31,"text":212,"correct":29},"进行岩土体物理力学试验，初步选定各项岩土物理力学性质参数",{"id":214,"libraryId":5,"type":15,"typeLabel":16,"stem":215,"options":216,"answer":31,"analysis":33},956996,"检验、核定前期勘察的地质资料与结论，补充论证专门性工程地质问题，进行施工地质工作，为工程设计及优化设计等提供工程地质资料，应是( )阶段完成的基本任务。",[217,218,219,220],{"key":20,"text":89,"correct":22},{"key":24,"text":91,"correct":22},{"key":27,"text":93,"correct":22},{"key":31,"text":221,"correct":29},"技施设计",{"id":223,"libraryId":5,"type":15,"typeLabel":16,"stem":224,"options":225,"answer":31,"analysis":33},956997,"可行性研究阶段工程地质勘察，对于盘山和傍山渠道应以工程地质测绘为主，测绘应选用比例尺为( )。",[226,228,230,231],{"key":20,"text":227,"correct":22},"1：1000～1：500",{"key":24,"text":229,"correct":22},"1：5000～1：1000",{"key":27,"text":112,"correct":22},{"key":31,"text":232,"correct":29},"1：25000～1：5000",{"id":234,"libraryId":5,"type":15,"typeLabel":16,"stem":235,"options":236,"answer":27,"analysis":33},956998,"可行性研究阶段区域地质勘察的主要工作有( )。",[237,239,241,243],{"key":20,"text":238,"correct":22},"了解工程的区域地质和地震概况",{"key":24,"text":240,"correct":22},"复核或补充区域构造稳定性研究与评价",{"key":27,"text":242,"correct":29},"进行区域构造稳定性研究，确定场地地震动参数，并对工程场地的构造稳定性作出评价",{"key":31,"text":244,"correct":22},"了解工程的区域地质、水文地质和地震概况，并初步评价工程场地的构造稳定性",{"id":246,"libraryId":5,"type":15,"typeLabel":16,"stem":247,"options":248,"answer":27,"analysis":33},956999,"可行性研究阶段区域工程地质勘察工作的主要内容应包括( )。",[249,250,251,252],{"key":20,"text":238,"correct":22},{"key":24,"text":240,"correct":22},{"key":27,"text":242,"correct":29},{"key":31,"text":244,"correct":22},{"id":254,"libraryId":5,"type":15,"typeLabel":16,"stem":255,"options":256,"answer":27,"analysis":33},957000,"可行性研究阶段水库区工程地质勘察的主要内容为( )。",[257,259,261,263],{"key":20,"text":258,"correct":22},"了解可溶岩地区的喀斯特发育情况，含水层和隔水层的分布范围并对水库产生的渗漏的可能性进行分析",{"key":24,"text":260,"correct":22},"了解重要矿产和名胜古迹的分布情况",{"key":27,"text":262,"correct":29},"初步查明水库区的水文地质条件，确定可能的渗漏地段，估计可能的渗漏量",{"key":31,"text":264,"correct":22},"查明可溶岩地区主要漏水地段或主要通道的位置、形态和规模，估算渗漏量，并提出防渗处理范围和深度的建议",{"id":266,"libraryId":5,"type":15,"typeLabel":16,"stem":267,"options":268,"answer":24,"analysis":33},957001,"可行性研究阶段新建堤防建筑物区勘察的主要任务为( )。",[269,271,273,275],{"key":20,"text":270,"correct":22},"了解各堤线方案地区的区域地质背景、基本地质条件和主要工程地质问题",{"key":24,"text":272,"correct":29},"基本查明新建堤防各堤线的水文地质、工程地质条件及存在的主要工程地质问题，对各堤线进行比较，初步预测堤防挡水后可能出现的环境地质问题",{"key":27,"text":274,"correct":22},"验证前期勘察成果，预测、预报施工中可能出现的不良地质现象，并提出处理建议",{"key":31,"text":276,"correct":22},"查明各堤线的水文地质、工程地质条件及存在的主要工程地质问题；对各堤线进行比较，预测堤防挡水后可能出现的环境地质问题",{"id":278,"libraryId":5,"type":15,"typeLabel":16,"stem":279,"options":280,"answer":20,"analysis":33},957002,"可行性研究设计阶段水库库岸稳定勘察内容不包括( )。",[281,283,285,287],{"key":20,"text":282,"correct":29},"预测施工期和水库运行期不稳定岸坡失稳的可能性，并应对水工建筑物、城镇、居民点及主要交通线路的可能影响作出评价",{"key":24,"text":284,"correct":22},"调查水库区对工程建筑物、城镇和居民区环境随影响的滑坡、崩塌和其他潜在不稳定岸坡以及泥石流的分布、大致范围和体积，初步评价水库蓄水前和蓄水后的稳定性及危害程度",{"key":27,"text":286,"correct":22},"抽水蓄能电站的上、下库，应调查库水位频繁变动对岸坡稳定的影响",{"key":31,"text":288,"correct":22},"第四纪沉积物组成的库岸，应预测水库坍岸制的范围",{"id":290,"libraryId":5,"type":15,"typeLabel":16,"stem":291,"options":292,"answer":27,"analysis":33},957003,"某大型水电站坝址区不同性质的断层破碎带较发育，为初步评价其对坝基稳定性的影响，在可行性研究阶段应初步查明主要断层、破碎带，特别是( )的性质、产状、规模、延伸情况、充填和胶结情况。",[293,295,297,299],{"key":20,"text":294,"correct":22},"横河断层",{"key":24,"text":296,"correct":22},"压性断层",{"key":27,"text":298,"correct":29},"顺河断层和缓倾角断层",{"key":31,"text":300,"correct":22},"陡倾角断层",{"id":302,"libraryId":5,"type":15,"typeLabel":16,"stem":303,"options":304,"answer":24,"analysis":33},957004,"某水电站通过规划阶段地质调查，了解有一村屯位于正常蓄水位以上库岸附近，地形为向库内倾斜的缓坡，地表为较厚黏性土层，地下水位埋藏较浅并补给库内，当水库蓄水后可能存在( )工程地质问题。",[305,307,309,311],{"key":20,"text":306,"correct":22},"水库渗漏",{"key":24,"text":308,"correct":29},"水库浸没",{"key":27,"text":310,"correct":22},"水库坍剧",{"key":31,"text":312,"correct":22},"水库淹没",{"id":314,"libraryId":5,"type":15,"typeLabel":16,"stem":315,"options":316,"answer":24,"analysis":33},957005,"某水电站通过可行性研究阶段勘察，预测库周有一较大面积的农田区可能发生浸没。为查明该地段水文地质条件和工程地质条件，初步设计阶段按规定布置勘探剖面线，勘探剖面线上钻孔布置原则为( )。",[317,319,321,323],{"key":20,"text":318,"correct":22},"钻孔间距应为200～500m，每个地貌单元钻孔不应少于2个，水库正常蓄水位线附近应布置钻孔，孔深应达到相对隔水层以下1m",{"key":24,"text":320,"correct":29},"钻孔间距应为500～1000m，每个地貌单元钻孔不应少于2个，水库正常蓄水位线附近应布置钻孔，孔深应达到相对隔水层以下1m",{"key":27,"text":322,"correct":22},"钻孔间距应为200～500m，每个地貌单元钻孔不应少于1个，水库正常蓄水位线附近应布置钻孔，孔深应达到相对隔水层以下1m",{"key":31,"text":324,"correct":22},"钻孔间距应为500～1000m，每个地貌单元钻孔不应少于1个，水库正常蓄水位线附近应布置钻孔，孔深应达到相对隔水层以下1m",{"id":326,"libraryId":5,"type":15,"typeLabel":16,"stem":327,"options":328,"answer":31,"analysis":33},957006,"某水电站在可行性研究阶段勘察时发现水库近坝库岸存在滑坡体，预测滑坡体范围为200㎡，滑动带最大厚度约25m，为查明滑坡体的工程地质条件并预测其稳定性和变化趋势，沿滑坡可能滑移方向布置2条钻孔勘探线，勘探线上应按( )布置。",[329,331,333,335],{"key":20,"text":330,"correct":22},"每条勘探线布置钻孔2个，计4个孔，每孔设计深度为25m，每个钻孔进行物探测井并取1组滑动带试样",{"key":24,"text":332,"correct":22},"每条勘探线布置钻孔2个，计4个孔，每孔设计深度为35m，每个钻孔进行物探测井并取1组滑动带试样",{"key":27,"text":334,"correct":22},"每条勘探线布置钻孔3个，计6个孔，每孔设计深度为25m，每个钻孔进行物探测井并取1组滑动带试样",{"key":31,"text":336,"correct":29},"每条勘探线布置钻孔3个，计6个孔，每孔设计深度为35m，每个钻孔进行物探测井并取1组滑动带试样",{"id":338,"libraryId":5,"type":15,"typeLabel":16,"stem":339,"options":340,"answer":31,"analysis":33},957007,"某水库在库水位达到正常蓄水位高程时，库周围一县城将存在严重浸没问题，为查明水文地质条件，圈定可能浸没范围，评价其危害程度，初步设计阶段勘探工作应按( )布置。",[341,343,345,347],{"key":20,"text":342,"correct":22},"勘探剖面应平行库岸或垂直地下水流向，剖面间距应为200～500m",{"key":24,"text":344,"correct":22},"勘探剖面应平行库岸或垂直地下水流向，剖面间距应为500～1000m",{"key":27,"text":346,"correct":22},"勘探剖面应垂直库岸或平行地下水流向，剖面间距应为500～1000m",{"key":31,"text":348,"correct":29},"勘探剖面应垂直库岸或平行地下水流向，剖面间距应为200～500m",{"id":350,"libraryId":5,"type":15,"typeLabel":16,"stem":351,"options":352,"answer":20,"analysis":33},957008,"某引水发电工程地下厂房跨度30m、地下压力管道水头为400m、厂房最大埋深为360m，在初步设计阶段除查明主要软弱结构面的分布和组合情况外，还应查明的主要内容不包括( )。",[353,355,357,359],{"key":20,"text":354,"correct":29},"洞室地段基础岩体的承载力",{"key":24,"text":356,"correct":22},"洞室地段的地温情况",{"key":27,"text":358,"correct":22},"压力管道段岩体的高压渗透特性",{"key":31,"text":360,"correct":22},"洞室的岩体应力情况",{"id":362,"libraryId":5,"type":15,"typeLabel":16,"stem":363,"options":364,"answer":24,"analysis":33},957009,"某引水渠道工程进行初步设计阶段工程地质勘察，分别沿渠道中心线和不同工程地质单元布置纵、横勘探剖面线，其各勘探线上勘探点布置原则为( )。",[365,367,369,371],{"key":20,"text":366,"correct":22},"渠道中心线勘探点间距100～200m",{"key":24,"text":368,"correct":29},"渠道中心线勘探点间距200～500m",{"key":27,"text":370,"correct":22},"每条横剖面上勘探点数应为1～3个",{"key":31,"text":372,"correct":22},"每条横剖面上勘探点数不应少于3个",{"id":374,"libraryId":5,"type":15,"typeLabel":16,"stem":375,"options":376,"answer":31,"analysis":33},957010,"某引水渠道工程进行初步设计阶段工程地质勘察，根据《水利水电工程地质勘察规范》(GB50487-2008)规定，为查明渠道和渠系建筑物地基岩土层的物理力学性质而取原状样进行室内试验，取样要求为( )。",[377,379,381,383],{"key":20,"text":378,"correct":22},"主要岩土层累计试验组数不应少于5组",{"key":24,"text":380,"correct":22},"主要岩土层累计试验组数不应少于6组",{"key":27,"text":382,"correct":22},"主要岩土层累计试验组数不应少于10组",{"key":31,"text":384,"correct":29},"主要岩土层累计试验组数不应少于12组",{"id":386,"libraryId":5,"type":15,"typeLabel":16,"stem":387,"options":388,"answer":27,"analysis":33},957011,"某引水渠道工程进行可行性研究阶段工程地质勘擦，应沿渠道中心线布置勘探坑、孔，各勘探点间距为( )。",[389,391,393,395],{"key":20,"text":390,"correct":22},"小于100m",{"key":24,"text":392,"correct":22},"100～500m",{"key":27,"text":394,"correct":29},"500～1000m",{"key":31,"text":396,"correct":22},"1000～2000m",{"id":398,"libraryId":5,"type":15,"typeLabel":16,"stem":399,"options":400,"answer":31,"analysis":33},957012,"某引水渠系工程渡槽采用墩(桩)基方案设计，根据《水利水电工程地质勘察规范》(GB50487-2008)规定，在初步设计阶段勘探钻孔孔滦布置原则为( )。",[401,403,405,407],{"key":20,"text":402,"correct":22},"桩基钻孔深度应进入桩端以下3m",{"key":24,"text":404,"correct":22},"桩基钻孔深度应进入桩端以下10～20m",{"key":27,"text":406,"correct":22},"墩基钻孔深度宜进入墩基以下5m",{"key":31,"text":408,"correct":29},"墩基钻孔深度宜进入墩基以下10～20m",{"id":410,"libraryId":5,"type":15,"typeLabel":16,"stem":411,"options":412,"answer":31,"analysis":33},957013,"渠道的选线工作是渠道工程地质勘察工作的主要内容之一，渠道线路的确定主要考虑地质条件的优劣，在渠道选线时，一般应遵循的原则不包括( )。",[413,415,417,419],{"key":20,"text":414,"correct":22},"尽量避开深挖方、高填方及沟谷密集地段",{"key":24,"text":416,"correct":22},"尽量避开和减少通过物理地质现象不良地段",{"key":27,"text":418,"correct":22},"尽量避开不良岩土层分布地段",{"key":31,"text":420,"correct":29},"尽量避开地下水埋藏较浅的地段",{"id":422,"libraryId":5,"type":15,"typeLabel":16,"stem":423,"options":424,"answer":31,"analysis":33},957014,"水库通过与库外相通的、具有渗漏性的岩土体长期向水库下游、库外邻谷或洼地渗入而产生的渗漏称为( )。",[425,427,429,431],{"key":20,"text":426,"correct":22},"季节性渗漏",{"key":24,"text":428,"correct":22},"突发性渗漏",{"key":27,"text":430,"correct":22},"暂时性渗漏",{"key":31,"text":432,"correct":29},"永久性渗漏",{"id":434,"libraryId":5,"type":15,"typeLabel":16,"stem":435,"options":436,"answer":31,"analysis":33},957015,"水库蓄水后，库区周围地下水相应壅高而接近或高于地面，导致( )等，这种现象称为浸没。",[437,439,441,443],{"key":20,"text":438,"correct":22},"荒地盐碱化、沼泽化及建筑物地基条件恶化",{"key":24,"text":440,"correct":22},"农田根系及建筑物地基位于地下水位以下",{"key":27,"text":442,"correct":22},"土层毛细水上升高度接近农作物根系及建筑物地基",{"key":31,"text":444,"correct":29},"农田盐碱化、沼泽化及建筑物地基条件恶化、矿坑涌水",{"id":446,"libraryId":5,"type":15,"typeLabel":16,"stem":447,"options":448,"answer":27,"analysis":33},957016,"水库蓄水后，使库区周围地区地下水相应壅高而接近或高于地面，导致农田盐碱化、地表沼泽化、建筑物地基条件恶化以及矿坑涌水等现象称为( )。",[449,450,452,453],{"key":20,"text":306,"correct":22},{"key":24,"text":451,"correct":22},"水库淤积",{"key":27,"text":308,"correct":29},{"key":31,"text":312,"correct":22},{"id":455,"libraryId":5,"type":15,"typeLabel":16,"stem":456,"options":457,"answer":24,"analysis":33},957017,"水利水电工程初步设计阶段地下式电站厂址以及隧洞进出口、傍山浅埋段等地质条件复杂时，应进行专门性地质测绘，比例尺可选用( )。",[458,459,461,462],{"key":20,"text":229,"correct":22},{"key":24,"text":460,"correct":29},"1：2000～1：1000",{"key":27,"text":227,"correct":22},{"key":31,"text":463,"correct":22},"1：10000～1：1000",{"id":465,"libraryId":5,"type":15,"typeLabel":16,"stem":466,"options":467,"answer":27,"analysis":33},957018,"水利水电工程初步设计阶段工程地质勘察的基本任务是( )。",[468,470,472,474],{"key":20,"text":469,"correct":22},"选择工程的建设位置，对选定的坝址、场址、线路等和推荐的建筑物基本型式、代表性工程布置方案进行地质论证",{"key":24,"text":471,"correct":22},"为河流开发方案和水利水电近期开发工程选择进行工程地质论证",{"key":27,"text":473,"correct":29},"查明各类建筑物及水库区的工程地质条件，为选定建筑物型式、轴线、工程总布置提供地质依据，对选定的各类建筑物的主要工程地质问题进行评价",{"key":31,"text":475,"correct":22},"检验、核定前期勘察的地质资料与结论，补充论证专门性工程地质问题",{"id":477,"libraryId":5,"type":15,"typeLabel":16,"stem":478,"options":479,"answer":24,"analysis":33},957019,"水利水电工程地下洞室工程地质勘察主要是在( )阶段进行。",[480,481,482,483],{"key":20,"text":87,"correct":22},{"key":24,"text":91,"correct":29},{"key":27,"text":221,"correct":22},{"key":31,"text":484,"correct":22},"施工详图设计",{"id":486,"libraryId":5,"type":15,"typeLabel":16,"stem":487,"options":488,"answer":27,"analysis":33},957020,"水利水电工程地质勘察宜分为( )阶段。",[489,491,493,495],{"key":20,"text":490,"correct":22},"规划、项目建议书、可行性研究、初步设计和施工图设计",{"key":24,"text":492,"correct":22},"项目建议书、可行性研究、初步设计和招标设计",{"key":27,"text":494,"correct":29},"规划、可行性研究、初步设计和技施设计",{"key":31,"text":496,"correct":22},"规划、项目建议书、可行性研究、初步设计、招标设计和施工详图设计",{"id":498,"libraryId":5,"type":15,"typeLabel":16,"stem":499,"options":500,"answer":20,"analysis":33},957021,"水利水电工程可行性研究阶段地下洞室工程地质勘察的任务是( )。",[501,503,505,507],{"key":20,"text":502,"correct":29},"对洞线进行方案选择",{"key":24,"text":504,"correct":22},"查明地下工程的工程地质条件、主要工程地质问题",{"key":27,"text":506,"correct":22},"调查建筑区有无活动断层分布",{"key":31,"text":508,"correct":22},"了解区域地应力情况",{"id":510,"libraryId":5,"type":15,"typeLabel":16,"stem":511,"options":512,"answer":31,"analysis":33},957022,"水利水电工程可行性研究阶段工程地质勘察应是在( )的基础上选择坝址，对选定的方案进行工程地质论证，并提供相应的工程地质资料。",[513,515,517,518],{"key":20,"text":514,"correct":22},"工程地质勘探",{"key":24,"text":516,"correct":22},"地质调查",{"key":27,"text":89,"correct":22},{"key":31,"text":519,"correct":29},"河流(河段)规划选定方案",{"id":521,"libraryId":5,"type":15,"typeLabel":16,"stem":522,"options":523,"answer":24,"analysis":33},957023,"水利水电工程可行性研究阶段引水隧洞及地下水厂房勘探平硐不应布置在( )等地段。",[524,526,528,530],{"key":20,"text":525,"correct":22},"隧洞进出口",{"key":24,"text":527,"correct":29},"洞顶上覆岩体最厚洞段",{"key":27,"text":529,"correct":22},"压力管道",{"key":31,"text":531,"correct":22},"地下厂房区",{"id":533,"libraryId":5,"type":15,"typeLabel":16,"stem":534,"options":535,"answer":24,"analysis":33},957024,"水利水电工程可行性研究阶段引水隧洞线路工程地质测绘要求为( )。",[536,538,540,542],{"key":20,"text":537,"correct":22},"可选用比例尺1：5000～1：1000",{"key":24,"text":539,"correct":29},"可选用比例尺1：25000～1：5000",{"key":27,"text":541,"correct":22},"范围应为各比较线路及其两侧各300～500m",{"key":31,"text":543,"correct":22},"范围应为各比较线路及其两侧各100～500m",{"id":545,"libraryId":5,"type":15,"typeLabel":16,"stem":546,"options":547,"answer":24,"analysis":33},957025,"水利水电渠系工程常遇见的主要工程地质问题不包括( )。",[548,550,552,554],{"key":20,"text":549,"correct":22},"渠道渗漏问题",{"key":24,"text":551,"correct":29},"渠道基础抗滑稳定问题",{"key":27,"text":553,"correct":22},"边坡稳定问题",{"key":31,"text":555,"correct":22},"涵闸、渡槽等建筑物的地基稳定问题",{"id":557,"libraryId":5,"type":15,"typeLabel":16,"stem":558,"options":559,"answer":27,"analysis":33},957026,"水利水电中小型工程与大型工程在初步设计阶段工程地质勘察要求上的区别是( )。",[560,562,564,566],{"key":20,"text":561,"correct":22},"勘察的任务和内容有所不同，勘察工作量及工作深度和精度也不同",{"key":24,"text":563,"correct":22},"勘察的任务和内容有所不同，勘察工作量及工作深度和精度相同",{"key":27,"text":565,"correct":29},"勘察的任务和内容相同，勘察工作量及工作深度和精度有所不同",{"key":31,"text":567,"correct":22},"勘察的任务和内容相同，勘察工作量及工作深度和精度相同",{"id":569,"libraryId":5,"type":15,"typeLabel":16,"stem":570,"options":571,"answer":31,"analysis":33},957027,"提出坝基岩土体的渗透系数、允许渗透水力比降和各项物理力学参数，对地基的沉陷、湿陷、抗滑稳定、渗透变形、液化等问题作出评价，应是( )设计阶段土石坝坝址勘察的内容。",[572,573,574,575],{"key":20,"text":87,"correct":22},{"key":24,"text":89,"correct":22},{"key":27,"text":91,"correct":22},{"key":31,"text":93,"correct":29},{"id":577,"libraryId":5,"type":15,"typeLabel":16,"stem":578,"options":579,"answer":27,"analysis":33},957028,"为查明渠道和渠系建筑物地基岩土层可能存在渗透、基坑涌水问题，在初步设计阶段应布置( )工作。",[580,582,584,586],{"key":20,"text":581,"correct":22},"对于强透(含)水层，抽(注)水试验不应少于2段",{"key":24,"text":583,"correct":22},"对于强透(含)水层，抽(注)水试验不应少于5段",{"key":27,"text":585,"correct":29},"渠道底部和建筑物岩石地基应进行压水试验",{"key":31,"text":587,"correct":22},"渠道底部和建筑物岩石地基应进行抽水试验",{"id":589,"libraryId":5,"type":15,"typeLabel":16,"stem":590,"options":591,"answer":31,"analysis":33},957029,"为查明水库区渗漏问题，初步设计阶段对可能发生喀斯特库区严重渗漏的岩溶通道应进行( )。",[592,593,595,597],{"key":20,"text":160,"correct":22},{"key":24,"text":594,"correct":22},"抽水试验",{"key":27,"text":596,"correct":22},"注水试验",{"key":31,"text":598,"correct":29},"连通试验",[600,603,606,609,612,615],{"id":15,"name":601,"category":7,"favorite":602},"领导干部任职前廉政法规知识测试题",92,{"id":604,"name":605,"category":7,"favorite":15},595,"建筑结构与设备",{"id":607,"name":608,"category":7,"favorite":15},715,"招标采购专业知识与法律法规",{"id":610,"name":611,"category":7,"favorite":15},848,"市政方向-通用基础",{"id":613,"name":614,"category":7,"favorite":8},534,"BIM工程师",{"id":616,"name":614,"category":7,"favorite":8},535]