[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-693-4":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":589},{"id":5,"name":6,"category":7,"favorite":8},693,"专业案例（水利水电）","建筑工程",0,4,50,822,[13,34,46,58,70,82,94,106,118,130,142,154,166,178,190,202,214,226,238,250,262,274,286,298,310,322,334,346,355,365,373,385,397,405,417,429,441,453,465,474,485,497,509,521,533,542,553,561,573,581],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":27,"analysis":33},956930,1,"单选题","围岩稳定的分析方法一般有以下几种，下列分类正桷的是( )。",[19,23,26,30],{"key":20,"text":21,"correct":22},"A","有限元法、地质分析法、工程类比法",false,{"key":24,"text":25,"correct":22},"B","计算法、分析法、类比法",{"key":27,"text":28,"correct":29},"C","地质分析法、工程类比法、岩体结构分析法",true,{"key":31,"text":32,"correct":22},"D","图解法、计算法、查表法","",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":24,"analysis":33},956931,"围岩稳定分析的目的是了解围岩的稳定状况，假若围岩有可能失去稳定，则应进一步了解其破坏形态和因此而形成的岩石荷载大小，下述关于稳定分析的一般步骤不正确的是( )。",[38,40,42,44],{"key":20,"text":39,"correct":22},"根据初选的洞室位置、洞型、开挖方法、地质资料和岩体力学参数，用各种方法计算应力，了解各种应力的分量的大小及其分布",{"key":24,"text":41,"correct":29},"确定压应力区的部位和范围，一般认为岩体不能承担压应力，因此压应力区被认为是不稳定区；把压应力值与岩体强度进行比较，若出现应力超限，按弹塑性等理论确定塑性区的范围",{"key":27,"text":43,"correct":22},"对可能在洞室周边出露的大块“危石”的稳定性作出估计，采用赤平投影、实体比例投影等方法确定其具体位置后，按块体平衡的方法进行分析",{"key":31,"text":45,"correct":22},"围岩稳定分析的成果必要时应通过模拟试验，这对复杂洞群尤为重要，应进行现场量测，以检验分析成果、改进计算方法、改进支护设计和指导施工",{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":27,"analysis":33},956932,"围岩中岩体结构特征对围岩应力起控制作用，节理面的产状与洞体受力方向的不同，将产生不同的结果，下列叙述不正确的是( )。",[50,52,54,56],{"key":20,"text":51,"correct":22},"节理面与洞体受力方向的夹角大于60°或垂直时，涧壁与节理面垂直相交的部位产生最大切向应力",{"key":24,"text":53,"correct":22},"节理面与洞体受力方向的夹角小千30°或平行时，洞壁与节理面相切的部位产生最大切向应力",{"key":27,"text":55,"correct":29},"当节理面的走向与洞体受力方向平行时，洞壁的切向应力成为最大主应力而径向应力变得弯斜",{"key":31,"text":57,"correct":22},"节理面与洞体受力方向斜交成45°时，洞壁与节理面相切及垂直的部位产生相等的最大切向应力",{"id":59,"libraryId":5,"type":15,"typeLabel":16,"stem":60,"options":61,"answer":31,"analysis":33},956933,"下列( )不是初步设计阶段在地下洞室勘察中应完成的工作。",[62,64,66,68],{"key":20,"text":63,"correct":22},"查明压力管道地段上覆岩体厚度和岩体应力状态，高水头压力管道地段尚应调查上覆山体的稳定性、岩体的地质结构特征利高压渗透性",{"key":24,"text":65,"correct":22},"查明深埋洞室岩体应力情况",{"key":27,"text":67,"correct":22},"调查深埋洞室的地温情况",{"key":31,"text":69,"correct":29},"了解地下厂房地段的岩体应力、地温、有害气体和放射性矿物情况",{"id":71,"libraryId":5,"type":15,"typeLabel":16,"stem":72,"options":73,"answer":31,"analysis":33},956934,"下列( )不是在引水隧洞线路勘察中可行性研究阶段勘察报告应编写的内容。",[74,76,78,80],{"key":20,"text":75,"correct":22},"区域地质、各比较线路工程地质条件",{"key":24,"text":77,"correct":22},"主要的工程地质问题与方案选择",{"key":27,"text":79,"correct":22},"推荐线路的工程地质条件分段说明",{"key":31,"text":81,"correct":29},"查明主要工程地质问题并进行评价，提出处理意见",{"id":83,"libraryId":5,"type":15,"typeLabel":16,"stem":84,"options":85,"answer":31,"analysis":33},956935,"下列不是地下洞室支护加固常用方法的是( )。",[86,88,90,92],{"key":20,"text":87,"correct":22},"喷锚支护",{"key":24,"text":89,"correct":22},"钢拱架和搁栅钢拱架支护",{"key":27,"text":91,"correct":22},"管棚支护",{"key":31,"text":93,"correct":29},"土钉墙",{"id":95,"libraryId":5,"type":15,"typeLabel":16,"stem":96,"options":97,"answer":24,"analysis":33},956936,"下列对地应力的叙述，表达不正确的是( )。",[98,100,102,104],{"key":20,"text":99,"correct":22},"地应力一般是指地壳岩体天然状态下所具有的内应力，或称为初始应力",{"key":24,"text":101,"correct":29},"地应力是在构造运动作用下形成的应力，有时包括在岩体的物理变化、化学变化及岩浆侵入等作用下形成的应力",{"key":27,"text":103,"correct":22},"地应力是在漫长的地质历史时期形成的",{"key":31,"text":105,"correct":22},"地下洞室开挖，使岩(土)体中原来的应力平衡状怼发生了变化，可能导致洞室围岩的变形破坏，因此地应力及地下洞室围岩应力的分布特征与地下洞室稳定关系很大",{"id":107,"libraryId":5,"type":15,"typeLabel":16,"stem":108,"options":109,"answer":20,"analysis":33},956937,"下列关于抽水蓄能电站地下岔管段应力和内水压力的说法正确的是( )。",[110,112,114,116],{"key":20,"text":111,"correct":29},"抽水蓄能电站地下岔管段要求最小主应力要大于岔管处的内水压力至少1～2倍，满足最小主应力理论",{"key":24,"text":113,"correct":22},"抽水蓄能电站地下岔管段要求最大主应力要大于岔管处的内水压力至少1～2倍，满足最大主应力理论",{"key":27,"text":115,"correct":22},"抽水蓄能电站地下岔管段要求最小主应力要小于岔管处的内水压力至少1～2倍，满足最小主应力理论",{"key":31,"text":117,"correct":22},"抽水蓄能电站地下岔管段要求最大主应力要小于岔管处的内水压力至少1～2倍，满足最大主应力理论",{"id":119,"libraryId":5,"type":15,"typeLabel":16,"stem":120,"options":121,"answer":31,"analysis":33},956938,"下列关于围岩分类方法的有关说法，不正确的是( )。",[122,124,126,128],{"key":20,"text":123,"correct":22},"在水利水电工作中，主要使用《水利水电工程地质勘察规范》(GB50487—2008)规定的围岩分类方法，其他方法则根据实际情况有选择地加以运用，并作为一种补充和验证",{"key":24,"text":125,"correct":22},"中国科学院地质所提出的分类是将岩体按结构类型划分大类和亚类，并给出相应界限值的定量指标",{"key":27,"text":127,"correct":22},"国外常用的围岩分类方法有挪威的Q系统分类法、地质力学分类法及新奥法等",{"key":31,"text":129,"correct":29},"在水利水电工作中，围岩分类在坝基岩体分类中经常采用",{"id":131,"libraryId":5,"type":15,"typeLabel":16,"stem":132,"options":133,"answer":31,"analysis":33},956939,"下列关于围岩各种分类方法的一些基本原理和方法，不正确的是( )。",[134,136,138,140],{"key":20,"text":135,"correct":22},"挪威的Q系统分类法包括6个基本参数，由参数取值表查出并计算Q值，Q值的范围为0.001～1000，从极差到极好分为9个等级",{"key":24,"text":137,"correct":22},"地质力学分类法又称RMR或CSIR分类法，包括5个基本参数，分别为岩石材料的单轴抗压强度、RQ节理间距、节理状况和地下水状况",{"key":27,"text":139,"correct":22},"中国科学院地质所谷德振提出的分类是将岩体按结构类型分为整体块状结构、层状结构、裂隙结构和散体结构四大类和八亚类",{"key":31,"text":141,"correct":29},"新奥法被认为是近代隧洞工程技术中一种比较落后的方法，因为它在概念上把围岩看做地下洞室承载结构的一部分，支护只是给围岩承载力不足部分的补充和强化",{"id":143,"libraryId":5,"type":15,"typeLabel":16,"stem":144,"options":145,"answer":24,"analysis":33},956940,"下列关于围岩强度应力比的有关说法，其中不准确的是( )。",[146,148,150,152],{"key":20,"text":147,"correct":22},"围岩强度应力是反映围岩应力大小与围岩强度相对关系的定量指标",{"key":24,"text":149,"correct":29},"围岩强度应力比为岩石天然单轴抗压强度和岩体完整性系数之积与围岩最大主应力之比",{"key":27,"text":151,"correct":22},"围岩的最大主应力在无实测资料时可用岩体的自重应力代替",{"key":31,"text":153,"correct":22},"围岩强度应力比为《水利水电工程地质勘察规范》(GB50487—2008)推荐的分类方法中围岩分类的限定判据",{"id":155,"libraryId":5,"type":15,"typeLabel":16,"stem":156,"options":157,"answer":31,"analysis":33},956941,"下列是洞室边墙与倾斜结构面相交的几种情况，说法不正确的是( )。",[158,160,162,164],{"key":20,"text":159,"correct":22},"若结构面的倾角大于结构面的摩擦角，顺倾向临空一侧洞壁可能失稳，必须采取加固措施，另一侧的洞壁虽然也会因剪切而破坏，但坍塌的威胁要小些",{"key":24,"text":161,"correct":22},"对于拱座部位，结构面与拱座的切线相切部位剪切破坏范围很大，工程中遇有这样的部位几乎都要失稳",{"key":27,"text":163,"correct":22},"结构面与拱座切线较为正交的一侧，剪切破坏区很小，只要其下部边墙没有滑移破坏，则这一部位一般较稳定",{"key":31,"text":165,"correct":29},"对于倾斜产状的节理体系，浅埋洞室比中等埋深洞室的破坏范围小，因此浅埋洞室比中等埋深洞室的开挖要困难",{"id":167,"libraryId":5,"type":15,"typeLabel":16,"stem":168,"options":169,"answer":27,"analysis":33},956942,"下面关于对地应力场的分布和变化规律的叙述中，表达不正确的是( )。",[170,172,174,176],{"key":20,"text":171,"correct":22},"垂直应力有随深度线性增加的变化关系",{"key":24,"text":173,"correct":22},"水平应力随深度的变化关系比较复杂，一般在地壳浅部，特别是构造活动区，大多数情况水平应力大于垂直应力，这种现象随深度而变化，当达到一定深度后，水平应力开始小于垂直应力。这个转变点的深度称为临界深度，不同地区临界深度不同",{"key":27,"text":175,"correct":29},"在地壳深部水平应力与垂直应力也不会趋于一致",{"key":31,"text":177,"correct":22},"在深切河谷区的河床底部往往有很大的水平应力，分为应力释放区、应力集中区和应力平衡区",{"id":179,"libraryId":5,"type":15,"typeLabel":16,"stem":180,"options":181,"answer":31,"analysis":33},956943,"岩爆一般发生在高应力地区的坚硬、脆性岩体中，其形成条件大致可归纳为以下几点，其中不正确的是( )。",[182,184,186,188],{"key":20,"text":183,"correct":22},"近代构造活动使山体内地应力较高，岩体储存着很大的应变能，应变能随着洞室开挖而释放；新鲜完整围岩，裂隙极少或仅有隐裂隙，属坚硬脆性介质，能够储存能量，而其变形特性属于脆性破坏类型，易发生岩爆",{"key":24,"text":185,"correct":22},"岩体干燥，无地下水，并具有足够的上覆岩体厚度，易发生岩爆",{"key":27,"text":187,"correct":22},"开挖断面形状不规则，造成局部应力集中点，易发生岩爆",{"key":31,"text":189,"correct":29},"当围岩的强度应力比小于4时，出现应力超限，易发生岩爆",{"id":191,"libraryId":5,"type":15,"typeLabel":16,"stem":192,"options":193,"answer":27,"analysis":33},956944,"查明渠道沿线和建筑物场地的地质和水文地质条件，基岩和第四纪地层的分布，重点查明强透水、易溶的岩土层、湿陷性黄土、膨胀土和喀斯特的分布及其对渗漏和稳走的影响，应是( )阶段的勘察任务。",[194,196,198,200],{"key":20,"text":195,"correct":22},"可行性研究",{"key":24,"text":197,"correct":22},"预可行性研究",{"key":27,"text":199,"correct":29},"初步设计",{"key":31,"text":201,"correct":22},"技施设计",{"id":203,"libraryId":5,"type":15,"typeLabel":16,"stem":204,"options":205,"answer":27,"analysis":33},956945,"可行性研究阶段坝址的主要勘探剖面线上勘探点的间距为( )。",[206,208,210,212],{"key":20,"text":207,"correct":22},"不大于30m",{"key":24,"text":209,"correct":22},"不大于50m",{"key":27,"text":211,"correct":29},"不大于100m",{"key":31,"text":213,"correct":22},"不大于150m",{"id":215,"libraryId":5,"type":15,"typeLabel":16,"stem":216,"options":217,"answer":27,"analysis":33},956946,"可行性研究阶段坝址区勘察应包括的内容是( )。",[218,220,222,224],{"key":20,"text":219,"correct":22},"查明各类水利水电工程建筑物区的工程地质条件，对存在的工程地质问题进行分析评价，为建筑物设计和地基处理方案提供地质资料和建议",{"key":24,"text":221,"correct":22},"了解梯级坝址的工程地质条件和主要工程地质问题",{"key":27,"text":223,"correct":29},"初步查明工程区及建筑物的工程地质条件、存在的主要工程地质问题，并作出初步评价",{"key":31,"text":225,"correct":22},"优化设计所需的专门性工程地质勘察",{"id":227,"libraryId":5,"type":15,"typeLabel":16,"stem":228,"options":229,"answer":24,"analysis":33},956947,"可行性研究阶段坝址应初步查明坝址区地形地貌特征，平原区河流坝址应初步查明( )等的分布、埋藏情况、规模及形态特征。",[230,232,234,236],{"key":20,"text":231,"correct":22},"古风化壳",{"key":24,"text":233,"correct":29},"牛轭湖、决扫口门、沙丘、古河道",{"key":27,"text":235,"correct":22},"河漫滩、阶地",{"key":31,"text":237,"correct":22},"洪积扇、坡积裙",{"id":239,"libraryId":5,"type":15,"typeLabel":16,"stem":240,"options":241,"answer":31,"analysis":33},956948,"可行性研究阶段坝址应初步查明基岩的岩性、岩相特征，进行详细分层，特别是( )等的分布和厚度，分析其对坝基或边坡岩体稳定的可能影响。",[242,244,246,248],{"key":20,"text":243,"correct":22},"强透水岩层",{"key":24,"text":245,"correct":22},"沉积岩",{"key":27,"text":247,"correct":22},"构造岩",{"key":31,"text":249,"correct":29},"软岩、易溶岩、膨胀性岩层和软弱夹层",{"id":251,"libraryId":5,"type":15,"typeLabel":16,"stem":252,"options":253,"answer":20,"analysis":33},956949,"可行性研究阶段的勘探点布置时，各比较坝址应布置( )条勘探剖面。",[254,256,258,260],{"key":20,"text":255,"correct":29},"1～3",{"key":24,"text":257,"correct":22},"3～5",{"key":27,"text":259,"correct":22},"5～7",{"key":31,"text":261,"correct":22},"7～9",{"id":263,"libraryId":5,"type":15,"typeLabel":16,"stem":264,"options":265,"answer":31,"analysis":33},956950,"可行性研究阶段对水库区可能存在渗漏地段应( )布置水文地质勘探剖面线。",[266,268,270,272],{"key":20,"text":267,"correct":22},"平行山坡",{"key":24,"text":269,"correct":22},"垂直山坡",{"key":27,"text":271,"correct":22},"垂直地下水流向或平行渗漏带",{"key":31,"text":273,"correct":29},"平行地下水流向或垂直渗漏带",{"id":275,"libraryId":5,"type":15,"typeLabel":16,"stem":276,"options":277,"answer":27,"analysis":33},956951,"可行性研究阶段对水库区可能发生严重渗漏或浸没的地段，宜埋设长期观测装置，进行地下水动态观测，观测时间( )。",[278,280,282,284],{"key":20,"text":279,"correct":22},"不少于一个月",{"key":24,"text":281,"correct":22},"不少于半年",{"key":27,"text":283,"correct":29},"不少于一个水文年",{"key":31,"text":285,"correct":22},"不少于两个水文年",{"id":287,"libraryId":5,"type":15,"typeLabel":16,"stem":288,"options":289,"answer":27,"analysis":33},956952,"可行性研究阶段对峡谷河流坝址进行勘探，当坝高大于70m、覆盖层厚度小于40m时，河床钻孔深度应为( )。",[290,292,294,296],{"key":20,"text":291,"correct":22},"30～50m",{"key":24,"text":293,"correct":22},"大于50m",{"key":27,"text":295,"correct":29},"0.5～1倍坝高",{"key":31,"text":297,"correct":22},"应达到相对隔水层",{"id":299,"libraryId":5,"type":15,"typeLabel":16,"stem":300,"options":301,"answer":24,"analysis":33},956953,"可行性研究阶段工程地质勘察，对渠道的进出口和主要建筑物地段，应布置( )工作。",[302,304,306,308],{"key":20,"text":303,"correct":22},"坑探",{"key":24,"text":305,"correct":29},"钻探",{"key":27,"text":307,"correct":22},"工程物探",{"key":31,"text":309,"correct":22},"水文地质试验",{"id":311,"libraryId":5,"type":15,"typeLabel":16,"stem":312,"options":313,"answer":27,"analysis":33},956954,"新建堤防工程勘察可分为( )阶段。",[314,316,318,320],{"key":20,"text":315,"correct":22},"规划、项目建议书、可行性研究、初步设计",{"key":24,"text":317,"correct":22},"项目建议书、可行性研究、初步设计、招标设计",{"key":27,"text":319,"correct":29},"规划、可行性研究、初步设计",{"key":31,"text":321,"correct":22},"规划、项目建议书、可行性研究、初步设计、招标设计和施工图设计",{"id":323,"libraryId":5,"type":15,"typeLabel":16,"stem":324,"options":325,"answer":24,"analysis":33},956955,"溢洪道的工程地质勘察工作重点应放在初步设计阶段进行，工程地质测绘采用的比例尺一般为( )。",[326,328,330,332],{"key":20,"text":327,"correct":22},"1：500～1：1000",{"key":24,"text":329,"correct":29},"1：1000～1：2000",{"key":27,"text":331,"correct":22},"1：2000～1：5000",{"key":31,"text":333,"correct":22},"1：5000～1：10000",{"id":335,"libraryId":5,"type":15,"typeLabel":16,"stem":336,"options":337,"answer":24,"analysis":33},956956,"在地形和岩性条件适合的情况下，规划阶段坝址勘察时物探剖面可布置( )，近期开发工程应适当增加。",[338,340,342,344],{"key":20,"text":339,"correct":22},"1条顺河和1条横河",{"key":24,"text":341,"correct":29},"1条顺河和1～3条横河",{"key":27,"text":343,"correct":22},"1～3条顺河和1条横河",{"key":31,"text":345,"correct":22},"1～3条顺河和1～3条横河",{"id":347,"libraryId":5,"type":15,"typeLabel":16,"stem":348,"options":349,"answer":27,"analysis":33},956957,"在分析坝基地质构造、岩体结构、岩体应力、风化特征、岩体强度和变形性质的基础上进行坝基岩体工程地质分类，提出各类岩体的物理力学性质参数，并对坝基工程地质条件作出评价，应在( )阶段完成。",[350,351,352,353],{"key":20,"text":195,"correct":22},{"key":24,"text":197,"correct":22},{"key":27,"text":199,"correct":29},{"key":31,"text":354,"correct":22},"施工详图设计",{"id":356,"libraryId":5,"type":15,"typeLabel":16,"stem":357,"options":358,"answer":20,"analysis":33},956958,"在某流域河段上了解各梯级坝的工程地质条件，分析是否有建坝的可能性，应在( )阶段进行。",[359,361,363,364],{"key":20,"text":360,"correct":29},"规划",{"key":24,"text":362,"correct":22},"项目建议书",{"key":27,"text":195,"correct":22},{"key":31,"text":199,"correct":22},{"id":366,"libraryId":5,"type":15,"typeLabel":16,"stem":367,"options":368,"answer":27,"analysis":33},956959,"针对水库存在的工程地质问题，开展专门性工程地质勘察工作应在( )阶剧进行。",[369,370,371,372],{"key":20,"text":195,"correct":22},{"key":24,"text":197,"correct":22},{"key":27,"text":199,"correct":29},{"key":31,"text":354,"correct":22},{"id":374,"libraryId":5,"type":15,"typeLabel":16,"stem":375,"options":376,"answer":27,"analysis":33},956960,"抽水蓄能电站工程地质勘察应分为( )阶段。",[377,379,381,383],{"key":20,"text":378,"correct":22},"规划、可行性研究、初步设计和施工详图设计",{"key":24,"text":380,"correct":22},"规划、项目建议书、可行性研究、初步设计和施工图设计",{"key":27,"text":382,"correct":29},"规划、预可行性研究、可行性研究、招标设计和施工详图设计",{"key":31,"text":384,"correct":22},"规划、项目建议书、预可行性研究、可行性研究、招标设计和施工图设计",{"id":386,"libraryId":5,"type":15,"typeLabel":16,"stem":387,"options":388,"answer":24,"analysis":33},956961,"抽水蓄能电站预可行性研究阶段工程勘察的主要任务是( )。",[389,391,393,395],{"key":20,"text":390,"correct":22},"对选择站址代表性方案的水库及各主要建筑物场地进行工程地质论证",{"key":24,"text":392,"correct":29},"初步查明站址代表性枢纽方案的水库及主要建筑物的工程地质条件，对影响方案成立的主要工程地质问题作出初步评价",{"key":27,"text":394,"correct":22},"查明水库及建筑物区的工程地质条件，为选定坝址、坝型、坝线、输水线路和发电厂房位置及其轴线方向提供地质依据",{"key":31,"text":396,"correct":22},"补充和完善上一阶段选定方案的工程地质勘察成果，对前期勘察未涉及的建筑物进行地质勘察",{"id":398,"libraryId":5,"type":15,"typeLabel":16,"stem":399,"options":400,"answer":24,"analysis":33},956962,"初步查明坝址区内主要断层、破碎带，特别是顺河断层和缓倾角断层的性质、产状、规模、延伸情况、充填和胶结情况，进行节理裂隙统计，分析各类结构面的组合对坝基、边坡岩体稳定和渗漏的影响，应是( )阶段勘察的内容。",[401,402,403,404],{"key":20,"text":360,"correct":22},{"key":24,"text":195,"correct":29},{"key":27,"text":199,"correct":22},{"key":31,"text":354,"correct":22},{"id":406,"libraryId":5,"type":15,"typeLabel":16,"stem":407,"options":408,"answer":27,"analysis":33},956963,"初步查明库岸稳定条件、预测水库坍岸情况和水库浸没范围等属于( )内容。",[409,411,413,415],{"key":20,"text":410,"correct":22},"水库库岸稳定勘察",{"key":24,"text":412,"correct":22},"水库渗漏勘察",{"key":27,"text":414,"correct":29},"水库区工程地质勘察",{"key":31,"text":416,"correct":22},"水库浸没勘察",{"id":418,"libraryId":5,"type":15,"typeLabel":16,"stem":419,"options":420,"answer":31,"analysis":33},956964,"初步设计阶段对水库区可能存在严重渗漏地段进行水文地质测绘，测绘比例尺一般选用( )。",[421,423,425,427],{"key":20,"text":422,"correct":22},"1：1000～1：500",{"key":24,"text":424,"correct":22},"1：2000～1：1000",{"key":27,"text":426,"correct":22},"1：5000～1：1000",{"key":31,"text":428,"correct":29},"1：10000～1：2000",{"id":430,"libraryId":5,"type":15,"typeLabel":16,"stem":431,"options":432,"answer":27,"analysis":33},956965,"初步设计阶段对水库区可能发生浸没的地段应进行土的物理性质和化学成分试验，每个浸没区主要土层试验组数累计应( )。",[433,435,437,439],{"key":20,"text":434,"correct":22},"不少于3组",{"key":24,"text":436,"correct":22},"不少于5组",{"key":27,"text":438,"correct":29},"不少于6组",{"key":31,"text":440,"correct":22},"不少于10组",{"id":442,"libraryId":5,"type":15,"typeLabel":16,"stem":443,"options":444,"answer":31,"analysis":33},956966,"初步设计阶段对主要坍岸区应进行详细勘察，其勘察的主要内容不包括( )。",[445,447,449,451],{"key":20,"text":446,"correct":22},"岸坡的自然稳定坡角",{"key":24,"text":448,"correct":22},"浪击带稳定坡角",{"key":27,"text":450,"correct":22},"土的水下浅滩坡角",{"key":31,"text":452,"correct":29},"土的渗透系数",{"id":454,"libraryId":5,"type":15,"typeLabel":16,"stem":455,"options":456,"answer":24,"analysis":33},956967,"初步设计阶段拱坝坝肩及抗力岩体部位宜按( )布置平硐。",[457,459,461,463],{"key":20,"text":458,"correct":22},"每隔10～30m高差",{"key":24,"text":460,"correct":29},"每隔30～50m高差",{"key":27,"text":462,"correct":22},"每隔50～80m高差",{"key":31,"text":464,"correct":22},"每隔不超过100m高差",{"id":466,"libraryId":5,"type":15,"typeLabel":16,"stem":467,"options":468,"answer":24,"analysis":33},956968,"初步设计阶段混凝土坝坝址区的工程地质测绘应采用的比例尺为( )。",[469,470,471,472],{"key":20,"text":422,"correct":22},{"key":24,"text":424,"correct":29},{"key":27,"text":426,"correct":22},{"key":31,"text":473,"correct":22},"1：10000～1：5000",{"id":475,"libraryId":5,"type":15,"typeLabel":16,"stem":476,"options":477,"answer":24,"analysis":33},956969,"初步设计阶段混凝土坝坝轴线勘探剖面线上勘探点的间距可采用( )。",[478,480,482,484],{"key":20,"text":479,"correct":22},"不大于20m",{"key":24,"text":481,"correct":29},"20～50m",{"key":27,"text":483,"correct":22},"50～70m",{"key":31,"text":211,"correct":22},{"id":486,"libraryId":5,"type":15,"typeLabel":16,"stem":487,"options":488,"answer":31,"analysis":33},956970,"初步设计阶段混凝土坝帷幕线钻孔深度应为( )。",[489,491,493,495],{"key":20,"text":490,"correct":22},"进入拟定的建基面高程以下不少于10m",{"key":24,"text":492,"correct":22},"进入拟定的建基面高程以下不少于5m",{"key":27,"text":494,"correct":22},"1倍坝高或进入相对隔水层不少于5m",{"key":31,"text":496,"correct":29},"1倍坝高或进入相对隔水层不少于10m",{"id":498,"libraryId":5,"type":15,"typeLabel":16,"stem":499,"options":500,"answer":24,"analysis":33},956971,"初步设计阶段水库区勘察应包括( )。",[501,503,505,507],{"key":20,"text":502,"correct":22},"了解梯级水库的工程地质条件和主要工程地质问题",{"key":24,"text":504,"correct":29},"查明水库区水文地质、工程地质条件，评价存在的工程地质问题，预测蓄水后的变化，提出工程处理措施建议",{"key":27,"text":506,"correct":22},"复核水库区的工程地质条件、存在的主要工程地质问题，查明前一设计阶段遗留的工程地质问题",{"key":31,"text":508,"correct":22},"初步查明水库区的工程地质条件、存在的主要工程地质问题，并作出初步评价",{"id":510,"libraryId":5,"type":15,"typeLabel":16,"stem":511,"options":512,"answer":27,"analysis":33},956972,"初步设计阶段水利水电工程天然建筑材料勘察应( )。",[513,515,517,519],{"key":20,"text":514,"correct":22},"进行天然建筑材料初查",{"key":24,"text":516,"correct":22},"了解工程天然建筑材料赋存情况",{"key":27,"text":518,"correct":29},"进行天然建筑材料详查",{"key":31,"text":520,"correct":22},"复核前期工程天然建筑材料赋存情况",{"id":522,"libraryId":5,"type":15,"typeLabel":16,"stem":523,"options":524,"answer":27,"analysis":33},956973,"初步设计阶段土石坝坝基岩土层的物理力学性质试验应符合以下哪些规定？( )",[525,527,529,531],{"key":20,"text":526,"correct":22},"主要岩石和土层各不少于5组",{"key":24,"text":528,"correct":22},"主要岩石和土层各不少于6组",{"key":27,"text":530,"correct":29},"坝基细粒土应进行标准贯入试验和触探试验",{"key":31,"text":532,"correct":22},"主要土层累计不少于10组",{"id":534,"libraryId":5,"type":15,"typeLabel":16,"stem":535,"options":536,"answer":31,"analysis":33},956974,"初步设计阶段土石坝坝轴线上勘探点的间距宜采用( )。",[537,538,539,540],{"key":20,"text":479,"correct":22},{"key":24,"text":481,"correct":22},{"key":27,"text":483,"correct":22},{"key":31,"text":541,"correct":29},"50～100m",{"id":543,"libraryId":5,"type":15,"typeLabel":16,"stem":544,"options":545,"answer":31,"analysis":33},956975,"初步设计阶段土石坝勘探钻孔深度应符合的要求不包括( )。",[546,548,550,552],{"key":20,"text":547,"correct":22},"覆盖层地基钻孔，基岩埋深小于坝高时，宜进入基岩以下10m",{"key":24,"text":549,"correct":22},"基岩地基钻孔为坝高的13～12",{"key":27,"text":551,"correct":22},"防渗线上钻孔应深入相对隔水层不少于10m或不小于1倍坝高",{"key":31,"text":295,"correct":29},{"id":554,"libraryId":5,"type":15,"typeLabel":16,"stem":555,"options":556,"answer":24,"analysis":33},956976,"初步研究并预测水库诱发地震的可能性、发震位置及强度应在( )阶段进行。",[557,558,559,560],{"key":20,"text":360,"correct":22},{"key":24,"text":195,"correct":29},{"key":27,"text":199,"correct":22},{"key":31,"text":354,"correct":22},{"id":562,"libraryId":5,"type":15,"typeLabel":16,"stem":563,"options":564,"answer":24,"analysis":33},956977,"大型水利水电工程初步设计阶段水库区工程地质勘察主要应对水库地质条件及( )等工程地质问题分析评价。",[565,567,569,571],{"key":20,"text":566,"correct":22},"水库渗漏、水库浸没、水库淤积",{"key":24,"text":568,"correct":29},"水库渗漏、水库浸没、库岸稳定、水库诱发地震",{"key":27,"text":570,"correct":22},"水库渗漏、水库浸没、水库坍岸、水库淤积",{"key":31,"text":572,"correct":22},"水库渗漏、水库浸没、水库坍岸、水库淹没",{"id":574,"libraryId":5,"type":15,"typeLabel":16,"stem":575,"options":576,"answer":31,"analysis":33},956978,"调查拟加固堤段堤基险情隐患类型、分布位置，出险和抢险隋况，临时加固措施及效果，初步分析险情产生的原因，应是( )勘察设计阶段进行的工作。",[577,578,579,580],{"key":20,"text":362,"correct":22},{"key":24,"text":195,"correct":22},{"key":27,"text":199,"correct":22},{"key":31,"text":201,"correct":29},{"id":582,"libraryId":5,"type":15,"typeLabel":16,"stem":583,"options":584,"answer":20,"analysis":33},956979,"对选择近期开发的梯级坝址进行工程地质勘察和工程地质论证，应是( )设计阶段完成的内容。",[585,586,587,588],{"key":20,"text":360,"correct":29},{"key":24,"text":362,"correct":22},{"key":27,"text":195,"correct":22},{"key":31,"text":199,"correct":22},[590,593,596,599,602,605],{"id":15,"name":591,"category":7,"favorite":592},"领导干部任职前廉政法规知识测试题",92,{"id":594,"name":595,"category":7,"favorite":15},595,"建筑结构与设备",{"id":597,"name":598,"category":7,"favorite":15},715,"招标采购专业知识与法律法规",{"id":600,"name":601,"category":7,"favorite":15},848,"市政方向-通用基础",{"id":603,"name":604,"category":7,"favorite":8},534,"BIM工程师",{"id":606,"name":604,"category":7,"favorite":8},535]