[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-957556":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":19,"analysis":25},957556,693,1,"单选题","根据《水利水电工程地质勘察规范》(GB50487-2008)，初步设计阶段水库岩溶渗漏勘察的要求应为( )。",[11,15,18,22],{"key":12,"text":13,"correct":14},"A","进行1／50000～1／25000岩溶水文地质测绘，测绘范围应包括分水岭和邻谷",false,{"key":16,"text":17,"correct":14},"B","进行1／50000～1／10000岩溶水文地质测绘，测绘范围包括邻谷、河间地块和坝下游地段，对产生渗漏地区可采用钻探和物探了解岩溶及地下水位等，并进行长期观测，观测时间不应少于1个水文年",{"key":19,"text":20,"correct":21},"C","严重渗漏地段采用1／10000～1／2000岩溶水文地质测绘，测绘范围包括可能渗漏通道及进出15地段，进行洞穴追索，利用各种物探手段了解岩溶和强透水带的空间位置。对可能渗漏的含水层不应少于2个钻孔了解地下水位，进行连通试验，了解洞穴的连通性和地下水的流向，也可进行大降深抽水和堵水试验，进行钻孔地下水位、岩溶泉、暗河的动态观测等",true,{"key":23,"text":24,"correct":14},"D","进行专门性补充勘察和地下水长期观测","参见《水利水电工程地质勘察规范》(GB50287-2008)第5.2.4条规定。",{"id":6,"name":27,"category":28,"favorite":29},"专业案例（水利水电）","建筑工程",0]