[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-957505":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":19,"analysis":25},957505,693,1,"单选题","天然建筑材料初步设计阶段勘察应采用( )地彤图作为底图，进行料场地质测绘及勘探布置。",[11,15,18,22],{"key":12,"text":13,"correct":14},"A","1\u002F10000～1\u002F5000",false,{"key":16,"text":17,"correct":14},"B","1\u002F50013～1\u002F2000",{"key":19,"text":20,"correct":21},"C","1\u002F2000～1\u002F1000",true,{"key":23,"text":24,"correct":14},"D","1\u002F1000～1\u002F500","天然建筑材料勘察的初步设计阶段，基本勘察要求采用1\u002F2000～1\u002F1000地形图作底图，进行料场地质测绘和勘探布置。",{"id":6,"name":27,"category":28,"favorite":29},"专业案例（水利水电）","建筑工程",0]