[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-957249":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":16,"analysis":25},957249,693,1,"单选题","规划阶段对规划河流或河段内的区域构造应了解主要构造单元、褶皱和断裂的类型、产状、规模和( )，历史地震情况和地震烈度等。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","地震活动史",false,{"key":16,"text":17,"correct":18},"B","构造活动史",true,{"key":20,"text":21,"correct":14},"C","地震记录",{"key":23,"text":24,"correct":14},"D","构造运动","根据《水利水电工程地质勘察规范》(GB50487—2008)规定，区域地质和地震的勘察应包括区域内的主要构造单元，褶皱和断裂的类型、产状、规模和构造发展史，历史和现今地震情况基地震动参数等。",{"id":6,"name":27,"category":28,"favorite":29},"专业案例（水利水电）","建筑工程",0]