[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-957248":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":22,"analysis":25},957248,693,1,"单选题","规划阶段的区域地质和地震工作应在收集和分析已有的各类最新区域地质志和区域地质图的基础上，编绘规划河流或河段的区域综合地质图。当河流或河段缺乏区域性资料时，应进行( )解译和路线地质调查，编制区域综合地质图。",[11,15,18,21],{"key":12,"text":13,"correct":14},"A","卫星照片",false,{"key":16,"text":17,"correct":14},"B","卫星图片",{"key":19,"text":20,"correct":14},"C","航空图片",{"key":22,"text":23,"correct":24},"D","卫片或航片",true,"根据《水利水电工程地质勘察规范》(GB50487—2008)规定，区域地质勘察工作应在收集和分析各类最新区域地质资料的基础上，利用卫片、航片解译编绘区域综合地质图，并应根据需要进行地质量复合。",{"id":6,"name":27,"category":28,"favorite":29},"专业案例（水利水电）","建筑工程",0]