[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-957223":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":16,"analysis":25},957223,693,1,"单选题","“中国地震动峰值加速度区划图”和“中国地震动反应谱特征周期区划图”适用的场地条件为平坦稳定的一般( )场地。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","坚硬",false,{"key":16,"text":17,"correct":18},"B","中硬",true,{"key":20,"text":21,"correct":14},"C","中软",{"key":23,"text":24,"correct":14},"D","软弱","中国地震动峰值加速度区划图和中国地震动反应谱特征周期区划图的比例尺为1：400万，设防水准为50年超越概率10％，场地条件为平坦稳定的一般(中硬)场地，两图均不应放大使用。",{"id":6,"name":27,"category":28,"favorite":29},"专业案例（水利水电）","建筑工程",0]