[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-957202":3},{"question":4,"library":25},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":12,"analysis":9},957202,693,1,"单选题","",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","应进行专门的地震危险性分析",true,{"key":16,"text":17,"correct":18},"B","应进行地震基本烈度复核",false,{"key":20,"text":21,"correct":18},"C","应进行合成基岩地震动时程确定式",{"key":23,"text":24,"correct":18},"D","可按现行《中国地震区划图》(GB18306—2001)确定地震基本烈度",{"id":6,"name":26,"category":27,"favorite":28},"专业案例（水利水电）","建筑工程",0]