[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-957191":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":16,"analysis":25},957191,693,1,"单选题","正式抽水试验前一般要进行试验抽水，通过试验抽水可检查水泵、动力、测试工具的运转情况和工作效果，并实测( )。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","含水层的透水强弱程度",false,{"key":16,"text":17,"correct":18},"B","可能达到的最大降深",true,{"key":20,"text":21,"correct":14},"C","含水层的涌水量",{"key":23,"text":24,"correct":14},"D","含水层的降落漏斗范围","试验抽水可与洗孔同时进行。通过试验抽水可检查水泵、动力、测试工具的运转情况和工作效果，并实测可能达到的最大降深。",{"id":6,"name":27,"category":28,"favorite":29},"专业案例（水利水电）","建筑工程",0]