[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-957171":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":19,"analysis":25},957171,693,1,"单选题","在水利水电工程地质勘察工作中，地下水长期观测的周期除一些特殊重要地段，如可能产生水库严重渗漏、严重浸没、坝基或坝肩严重渗漏等地段，需要较长观测时间，甚至延续到工程运行以后一段时间外，多数情况下地下水长期观测都规定观测期为( )。",[11,15,18,22],{"key":12,"text":13,"correct":14},"A","初步设计阶段勘察结束",false,{"key":16,"text":17,"correct":14},"B","半年",{"key":19,"text":20,"correct":21},"C","一个水文年",true,{"key":23,"text":24,"correct":14},"D","两个水文年","根据《水利水电工程地质勘察规范》(GB50487—2008)规定，可行性研究阶段对水库区可能发生严重渗漏或浸没的地段，宜埋设长期观测装置，进行地下水动态观测，观测时间不少于一个水文年成一个丰水、枯水季。",{"id":6,"name":27,"category":28,"favorite":29},"专业案例（水利水电）","建筑工程",0]