[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-957148":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":19,"analysis":25},957148,693,1,"单选题","压水试验一般采用( )级压力。",[11,15,18,22],{"key":12,"text":13,"correct":14},"A","一",false,{"key":16,"text":17,"correct":14},"B","二",{"key":19,"text":20,"correct":21},"C","三",true,{"key":23,"text":24,"correct":14},"D","四","钻孔压水试验方法是用止水栓塞把一定长度(一般为5m)的孔段隔开，然后用不同的压力向试段内送水，测定其相应的流量值。一般情况下，都需要进行三个压力、五个阶段的试验，并采用最大压力阶段的压力值和相应的流量值计算得出透水率；以五个阶段的p、Q值绘制P～Q曲线，判断其类型。",{"id":6,"name":27,"category":28,"favorite":29},"专业案例（水利水电）","建筑工程",0]