[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-957121":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":22,"analysis":25},957121,693,1,"单选题","工程地质测绘地质点应( )布置。",[11,15,18,21],{"key":12,"text":13,"correct":14},"A","均匀等距",false,{"key":16,"text":17,"correct":14},"B","在地质构造复杂处",{"key":19,"text":20,"correct":14},"C","在基岩露头",{"key":22,"text":23,"correct":24},"D","地质界线和其他有意义的地质现象上",true,"工程地质测绘地质点应布置在地质界线和其他有意义的地质现象上，地质线路宜穿越或追索地质界线布置。",{"id":6,"name":27,"category":28,"favorite":29},"专业案例（水利水电）","建筑工程",0]