[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-957114":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":19,"analysis":25},957114,693,1,"单选题","根据水利水电工程涉及的中强透水层的深度范围及实际的可能用于抽水试验的设备能力，一般在均质含水层厚度( )时，试验孔宜采用完整孔结构。",[11,15,18,22],{"key":12,"text":13,"correct":14},"A","小于10m",false,{"key":16,"text":17,"correct":14},"B","大于10m",{"key":19,"text":20,"correct":21},"C","小于15m",true,{"key":23,"text":24,"correct":14},"D","大于15m","根据水利水电工程涉及的中强透水层的深度范围及实际的可能用于抽水试验的设备能力，一般在均质含水层厚度小于15m时，试验孔宜采用完整孔结构；大于15m时，可采用非完整孔结构。",{"id":6,"name":27,"category":28,"favorite":29},"专业案例（水利水电）","建筑工程",0]