[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-957111":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":19,"analysis":25},957111,693,1,"单选题","根据《水利水电工程钻孔压水试验规程》(SL31—2003)规定，钻孔压水试验一般情况下，都需要进行( )的试验。",[11,15,18,22],{"key":12,"text":13,"correct":14},"A","一个压力、一个阶段",false,{"key":16,"text":17,"correct":14},"B","三个压力、三个阶段",{"key":19,"text":20,"correct":21},"C","三个压力、五个阶段",true,{"key":23,"text":24,"correct":14},"D","五个压力、五个阶段","《水利水电工程钻孔压水试验规程》(SL31一2003)第3.2.1条规定，钻孔压水试验一般情况下都需要进行三个压力、五个阶段的试验。三个试验压力一般为P1=0.3MPa，P2=0.6MPa，P3=1.0MPa。五个压力阶段为P1-P2-P3-P4(=P2)-P5(=P1)。",{"id":6,"name":27,"category":28,"favorite":29},"专业案例（水利水电）","建筑工程",0]