[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-957104":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":22,"analysis":25},957104,693,1,"单选题","根据《水利水电工程钻孔压水试验规程》(SL31-2003)规定，压水试验前应进行地下水位观测，观测每5min进行一次，当水位( )时，观测工作即可结束。",[11,15,18,21],{"key":12,"text":13,"correct":14},"A","达到静止",false,{"key":16,"text":17,"correct":14},"B","下降速度连续2次均小于1cm／min",{"key":19,"text":20,"correct":14},"C","连续2次值之差小于5cm",{"key":22,"text":23,"correct":24},"D","下降速度连续2次均小于5cm／min",true,"根据《水利水电工程钻孔压水试验规程》(SL31-2003)规定，水位观测一般每隔5min进行一次。当水位下降速度连续两次均小于5cm／min时，观测工作即可结束。用最后的观测结果确定压力计算零线。",{"id":6,"name":27,"category":28,"favorite":29},"专业案例（水利水电）","建筑工程",0]