[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-957103":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":16,"analysis":25},957103,693,1,"单选题","根据《水利水电工程钻孔压水试验规程》(SL31—2003)规定，试验流量观测一般每隔2min进行一次，当流量无持续增大趋势，且( )时，观测工作即可结束。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","2次流量观测读数中最大值与最小值之差小于最终值的10％",false,{"key":16,"text":17,"correct":18},"B","5次流量观测读数中最大值与最小值之差小于最终值的10％，或最大值与最小值之差小于11\u002Fmin",true,{"key":20,"text":21,"correct":14},"C","5次流量观测读数中最大值与最小值之差小于最终值的5％，或最大值与最小值之差小于11\u002Fmin",{"key":23,"text":24,"correct":14},"D","5次流量观测读数中最大值与最小值之差小于101\u002Fmin","根据《水利水电工程钻孔压水试验规程》(SL31—2003)规定，试验流量观测一般每隔2min进行一次，当流量无持续增大趋势，且5次流量观测读数中最大值与最小值之差小于最终值的10％，或最大值与最小值之差小于11\u002Fmin时，观测工作即可结束。取最终值作为计算值。",{"id":6,"name":27,"category":28,"favorite":29},"专业案例（水利水电）","建筑工程",0]