[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-957101":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":19,"analysis":25},957101,693,1,"单选题","根据《水利水电工程钻孔压水试验规程》(SL31-2003)规定，当地下水位在试段以内时，压力计算零线为( )。",[11,15,18,22],{"key":12,"text":13,"correct":14},"A","通过试段中点的水平线",false,{"key":16,"text":17,"correct":14},"B","稳定地下水水位线",{"key":19,"text":20,"correct":21},"C","通过地下水水位以上试段中点的水平线",true,{"key":23,"text":24,"correct":14},"D","通过试段中心的水平线","压力计算零线的确定方法为：①当地下水位在试段以下时，压力计算零线为通过试段中点的水平线；②当下水位在试段以内时，压力计算零线为通过地下水水位以上试段中点的水平线；③当地下水位在试段以上时，压力计算零线为地下水位线。",{"id":6,"name":27,"category":28,"favorite":29},"专业案例（水利水电）","建筑工程",0]