[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-957090":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":22,"analysis":25},957090,693,1,"单选题","对平原区松散地层进行地下水动态观测宜布设观测线，观测点的布设要求为( )。",[11,15,18,21],{"key":12,"text":13,"correct":14},"A","观测点距在100～500m，主要观测线上的观测点不宜少于5个",false,{"key":16,"text":17,"correct":14},"B","观测点距在500～1000m，主要观测线上的观测点不宜少于5个",{"key":19,"text":20,"correct":14},"C","观测点距在100～500m，主要观测线上的观测点不宜少于3个",{"key":22,"text":23,"correct":24},"D","观测点距在500～1000m，主要观测线上的观测点不宜少于3个",true,"根据《水利水电工程地质观测规程》(SL245—1999)规定，平原区松散地层中地下水宜布设观测线，进行动态观测。观测点距可控制在500～1000m，主要观测线上的观测点不宜少于3个。",{"id":6,"name":27,"category":28,"favorite":29},"专业案例（水利水电）","建筑工程",0]