[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-957063":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":22,"analysis":25},957063,693,1,"单选题","某抽水蓄能电站上水库库周存在一处相对单薄低矮分水岭，该处地表覆盖层为1.5m厚，下部为约20m厚的全强风化花岗岩，地下水位埋深大于40m，为查明全风化岩、强风化岩的渗透特性，评价该处渗漏问题，宜采用( )原位测试方法。",[11,15,18,21],{"key":12,"text":13,"correct":14},"A","试坑单环注水试验",false,{"key":16,"text":17,"correct":14},"B","试坑双环注水试验",{"key":19,"text":20,"correct":14},"C","钻孔压水试验",{"key":22,"text":23,"correct":24},"D","钻孔常水头注水试验",true,"钻孔常水头注水试验适用于渗透性较大的壤土、粉土、砂土和砂卵砾石层，或不能进行压水试验的风化、破碎岩体、断层破碎带等透水性较强的岩体。A项，试坑单环注水试验适用于水位以上的砂土、砂卵砾石等土层；B项，试坑双环注水试验适用于地下水位以上的粉土层和黏土层。",{"id":6,"name":27,"category":28,"favorite":29},"专业案例（水利水电）","建筑工程",0]