[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-957034":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":19,"analysis":25},957034,693,1,"单选题","为评价抽水蓄能电站水库区的渗漏条件，查明水库主要漏水地段或渗漏通道的位置、规模和估算水库渗漏量，应是( )阶段的勘察内容之一。",[11,15,18,22],{"key":12,"text":13,"correct":14},"A","规划",false,{"key":16,"text":17,"correct":14},"B","预可行性研究",{"key":19,"text":20,"correct":21},"C","可行性研究",true,{"key":23,"text":24,"correct":14},"D","招标设计","",{"id":6,"name":27,"category":28,"favorite":29},"专业案例（水利水电）","建筑工程",0]