[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-957030":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":12,"analysis":25},957030,693,1,"单选题","为查明溢洪道工程地质问题，勘探钻孔布置原则不包括( )。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","钻孔深度宜进入设计建基面高程以下10～20m",true,{"key":16,"text":17,"correct":18},"B","钻孔深度宜进入设计建基面高程以下20～30m",false,{"key":20,"text":21,"correct":18},"C","布置在泄洪闸基，钻孔深度应满足防渗要求",{"key":23,"text":24,"correct":18},"D","钻孔宜布置在泄洪闸、泄槽及消能等主要建筑物部位","根据《水利水电工程地质勘察规范》(GB50487—2008)第5.6.2条，溢洪道的勘察方法应符合下列规定：①工程地质测绘比例尺可选用1：5000～1：2000。当溢洪道与坝址邻近时，可与坝址一并测绘成图。②勘探剖面应沿设计溢洪道中心线和消能设施等主要建筑物布置，钻孔深度宜进入设计建基面高程以下20～30m，泄洪闸基钻孔深度应满足防渗要求。③泄洪闸基岩钻孔应进行压水试验。④主要岩土层室内试验累计有效组数不应少于6组。",{"id":6,"name":27,"category":28,"favorite":29},"专业案例（水利水电）","建筑工程",0]