[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-957028":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":19,"analysis":25},957028,693,1,"单选题","为查明渠道和渠系建筑物地基岩土层可能存在渗透、基坑涌水问题，在初步设计阶段应布置( )工作。",[11,15,18,22],{"key":12,"text":13,"correct":14},"A","对于强透(含)水层，抽(注)水试验不应少于2段",false,{"key":16,"text":17,"correct":14},"B","对于强透(含)水层，抽(注)水试验不应少于5段",{"key":19,"text":20,"correct":21},"C","渠道底部和建筑物岩石地基应进行压水试验",true,{"key":23,"text":24,"correct":14},"D","渠道底部和建筑物岩石地基应进行抽水试验","根据《水利水电工程地质勘察规范》(GB50487—2008)，可能存在渗漏、基坑涌水问题的渠段，应进行抽(注)水试验。对于强透(含)水层，抽(注)水试验不应少于3段，渠道底部和建筑物岩石地基应进行钻孔压水试验，根据需要可布置地下水动态观测。",{"id":6,"name":27,"category":28,"favorite":29},"专业案例（水利水电）","建筑工程",0]