[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-956997":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":22,"analysis":25},956997,693,1,"单选题","可行性研究阶段工程地质勘察，对于盘山和傍山渠道应以工程地质测绘为主，测绘应选用比例尺为( )。",[11,15,18,21],{"key":12,"text":13,"correct":14},"A","1：1000～1：500",false,{"key":16,"text":17,"correct":14},"B","1：5000～1：1000",{"key":19,"text":20,"correct":14},"C","1：10000～1：5000",{"key":22,"text":23,"correct":24},"D","1：25000～1：5000",true,"对渠系可行性研究阶段，工程地质勘察工作的要求是：①对于盘山和傍山渠道应以工程地质测绘为主，测绘精度应选用1：25000～1：5000比例尺；②对于平原渠道应沿渠线布置勘探线；③勘探点的数量应根据通过地段的地貌和工程地质分段布置拟定；④勘探孔深宜钻至拟定渠底高程下5～10m，或钻至隔水层顶面；⑤对渠道的进出口和主要建筑地段，应布置专门的钻探工作，必要时取样进行试验分析。",{"id":6,"name":27,"category":28,"favorite":29},"专业案例（水利水电）","建筑工程",0]