[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-956996":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":22,"analysis":25},956996,693,1,"单选题","检验、核定前期勘察的地质资料与结论，补充论证专门性工程地质问题，进行施工地质工作，为工程设计及优化设计等提供工程地质资料，应是( )阶段完成的基本任务。",[11,15,18,21],{"key":12,"text":13,"correct":14},"A","项目建议书",false,{"key":16,"text":17,"correct":14},"B","可行性研究",{"key":19,"text":20,"correct":14},"C","初步设计",{"key":22,"text":23,"correct":24},"D","技施设计",true,"技施设计阶段工程地质勘察的基本任务是：在初步设计阶段选定的水库及枢纽建筑物场地上，检验前期勘察的地质资料与结论，补充论证专门性工程地质问题，并提供优化设计所需的工程地质资料。",{"id":6,"name":27,"category":28,"favorite":29},"专业案例（水利水电）","建筑工程",0]