[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-956977":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":16,"analysis":25},956977,693,1,"单选题","大型水利水电工程初步设计阶段水库区工程地质勘察主要应对水库地质条件及( )等工程地质问题分析评价。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","水库渗漏、水库浸没、水库淤积",false,{"key":16,"text":17,"correct":18},"B","水库渗漏、水库浸没、库岸稳定、水库诱发地震",true,{"key":20,"text":21,"correct":14},"C","水库渗漏、水库浸没、水库坍岸、水库淤积",{"key":23,"text":24,"correct":14},"D","水库渗漏、水库浸没、水库坍岸、水库淹没","水库蓄水后，由于拦蓄水位升高，库周边及其邻近地区水文地质、工程地质条件和地质环境的变化，可能会产生或引发各种工程地质问题(如水库渗漏、水库浸没、水库塌岸或边坡失稳及水库诱发地震等)，影响水库安全、有效运行。水库区工程地质勘察应在全面调查水库区水文地质、工程地质条件的基础上，对可能存在问题的库段及主要工程地质问题(如水库渗漏、浸没、库岸稳定、滑坡等)进行重点勘察。",{"id":6,"name":27,"category":28,"favorite":29},"专业案例（水利水电）","建筑工程",0]