[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-956951":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":19,"analysis":25},956951,693,1,"单选题","可行性研究阶段对水库区可能发生严重渗漏或浸没的地段，宜埋设长期观测装置，进行地下水动态观测，观测时间( )。",[11,15,18,22],{"key":12,"text":13,"correct":14},"A","不少于一个月",false,{"key":16,"text":17,"correct":14},"B","不少于半年",{"key":19,"text":20,"correct":21},"C","不少于一个水文年",true,{"key":23,"text":24,"correct":14},"D","不少于两个水文年","根据《水利水电工程地质勘察规范》(GB50487—2008)，对可能影响建库和方案成立的主要工程地质问题应布置勘探剖面，并应符合规定：钻孔在蓄水位以下孔段应进行水文地质试验，并保留适量钻孔和其他水文地质点，一起进行不少于一个水文年成一个丰水、枯水季的水文地质观测。",{"id":6,"name":27,"category":28,"favorite":29},"专业案例（水利水电）","建筑工程",0]