[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-956949":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":12,"analysis":25},956949,693,1,"单选题","可行性研究阶段的勘探点布置时，各比较坝址应布置( )条勘探剖面。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","1～3",true,{"key":16,"text":17,"correct":18},"B","3～5",false,{"key":20,"text":21,"correct":18},"C","5～7",{"key":23,"text":24,"correct":18},"D","7～9","可行性研究阶段勘探点布置时，在各比较坝址布置1～3勘探剖面线，主勘探剖面上勘探点间距一般不大于100m。",{"id":6,"name":27,"category":28,"favorite":29},"专业案例（水利水电）","建筑工程",0]