[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-956947":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":16,"analysis":25},956947,693,1,"单选题","可行性研究阶段坝址应初步查明坝址区地形地貌特征，平原区河流坝址应初步查明( )等的分布、埋藏情况、规模及形态特征。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","古风化壳",false,{"key":16,"text":17,"correct":18},"B","牛轭湖、决扫口门、沙丘、古河道",true,{"key":20,"text":21,"correct":14},"C","河漫滩、阶地",{"key":23,"text":24,"correct":14},"D","洪积扇、坡积裙","可行性研究阶段坝址区勘察，平原区河流应调查牛轭湖、决口口门、沙丘等的分布和埋藏情况；当基岩埋深较浅时，应调查基岩面的倾斜和起伏情况。",{"id":6,"name":27,"category":28,"favorite":29},"专业案例（水利水电）","建筑工程",0]