[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-956933":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":22,"analysis":25},956933,693,1,"单选题","下列( )不是初步设计阶段在地下洞室勘察中应完成的工作。",[11,15,18,21],{"key":12,"text":13,"correct":14},"A","查明压力管道地段上覆岩体厚度和岩体应力状态，高水头压力管道地段尚应调查上覆山体的稳定性、岩体的地质结构特征利高压渗透性",false,{"key":16,"text":17,"correct":14},"B","查明深埋洞室岩体应力情况",{"key":19,"text":20,"correct":14},"C","调查深埋洞室的地温情况",{"key":22,"text":23,"correct":24},"D","了解地下厂房地段的岩体应力、地温、有害气体和放射性矿物情况",true,"D项，了解地下厂房地段的岩体应力、地温、有害气体和放射性矿物情况是对地下厂房的可行性研究阶段的工作。",{"id":6,"name":27,"category":28,"favorite":29},"专业案例（水利水电）","建筑工程",0]