[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-956857":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":16,"analysis":25},956857,693,1,"单选题","地下洞室超前预报是施工阶段施工地质的一项重要内容，应在地下洞室地质勘察的基础上，选用合适的方法实施适时的地质超前预报，施工地质的超前预报可分为( )两大类方法。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","地质雷达与红外探水",false,{"key":16,"text":17,"correct":18},"B","直接预报和间接预报",true,{"key":20,"text":21,"correct":14},"C","物探和钻探",{"key":23,"text":24,"correct":14},"D","地质利物探","直接预报方法可根据施工开挖情况，对照前期勘察预测的成果，预报隧洞掌子面前方的地质情况。间接预报方法主要是采用多种类型的物探手段探测前方地质情况。",{"id":6,"name":27,"category":28,"favorite":29},"专业案例（水利水电）","建筑工程",0]