[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-956828":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":19,"analysis":25},956828,693,1,"单选题","",[11,15,18,22],{"key":12,"text":13,"correct":14},"A","图(a)、图(b)",false,{"key":16,"text":17,"correct":14},"B","图(b)、图(c)",{"key":19,"text":20,"correct":21},"C","图(a)、图(c)",true,{"key":23,"text":24,"correct":14},"D","全都合理","图(a)所示的排水廊道应设置在含水层出露点最低处，有利于地下水的充分排出；图(c)所示的抗滑桩应设置在滑坡体的下端；有利于发挥抗滑桩的作用。",{"id":6,"name":27,"category":28,"favorite":29},"专业案例（水利水电）","建筑工程",0]