[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-691-7":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":702},{"id":5,"name":6,"category":7,"favorite":8},691,"投资建设项目组织","建筑工程",0,7,50,349,[13,38,53,68,83,97,112,124,139,153,166,181,193,208,222,234,248,262,277,292,306,320,334,348,362,376,390,404,418,432,446,460,474,488,501,515,529,542,556,570,584,597,611,625,639,653,667,678,692],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":36,"analysis":37},953782,2,"多选题","建设项目界面管理中，纵向界面的管理方法包括( )。",[19,23,27,30,33],{"key":20,"text":21,"correct":22},"A","跨职能整合",false,{"key":24,"text":25,"correct":26},"B","立完善的管理协调机制",true,{"key":28,"text":29,"correct":26},"C","运用目标管理方法",{"key":31,"text":32,"correct":22},"D","充分沟通",{"key":34,"text":35,"correct":26},"E","选择合格的项目经理人员","BCE","",{"id":39,"libraryId":5,"type":15,"typeLabel":16,"stem":40,"options":41,"answer":52,"analysis":37},953783,"对一个具体的项目而言，项目三大目标共同构成了项目的整体目标，其中，三大目标是指( )。",[42,44,46,48,50],{"key":20,"text":43,"correct":26},"进度目标",{"key":24,"text":45,"correct":26},"质量目标",{"key":28,"text":47,"correct":22},"安全目标",{"key":31,"text":49,"correct":22},"信誉目标",{"key":34,"text":51,"correct":26},"投资(成本)目标","ABE",{"id":54,"libraryId":5,"type":15,"typeLabel":16,"stem":55,"options":56,"answer":67,"analysis":37},953784,"在项目采购和施工阶段，投资目标计划值和实际值的比较主要包括( )。",[57,59,61,63,65],{"key":20,"text":58,"correct":26},"竣工决算价和设计概算的比较",{"key":24,"text":60,"correct":26},"工程结算价和施工合同价的比较",{"key":28,"text":62,"correct":22},"修正概算和设计概算的比较",{"key":31,"text":64,"correct":26},"工程结算价和资金使用计划(月\u002F季\u002F年或资金分块)的比较",{"key":34,"text":66,"correct":26},"资金使用计划(月\u002F季\u002F年或资金分块)和设计概算的比较","ABDE",{"id":69,"libraryId":5,"type":15,"typeLabel":16,"stem":70,"options":71,"answer":82,"analysis":37},953785,"从管理职能、项目目标和约束等角度综合分析和归纳，业主方项目管理的任务包括( )、信息管理、组织和协调。",[72,74,76,78,80],{"key":20,"text":73,"correct":22},"设计管理",{"key":24,"text":75,"correct":26},"质量控制",{"key":28,"text":77,"correct":26},"投资控制",{"key":31,"text":79,"correct":26},"进度控制",{"key":34,"text":81,"correct":26},"合同管理","BCDE",{"id":84,"libraryId":5,"type":15,"typeLabel":16,"stem":85,"options":86,"answer":82,"analysis":37},953786,"建设项目管理实施的主体包括( )。",[87,89,91,93,95],{"key":20,"text":88,"correct":22},"企业自身",{"key":24,"text":90,"correct":26},"业主方",{"key":28,"text":92,"correct":26},"设计方",{"key":31,"text":94,"correct":26},"施工方",{"key":34,"text":96,"correct":26},"供货方和咨询方",{"id":98,"libraryId":5,"type":15,"typeLabel":16,"stem":99,"options":100,"answer":111,"analysis":37},953787,"运用目标管理方法对纵向界面进行管理主要把握的方面包括( )。",[101,103,105,107,109],{"key":20,"text":102,"correct":26},"建立目标管理体系",{"key":24,"text":104,"correct":26},"强调责、权、利三者的统一",{"key":28,"text":106,"correct":22},"强调责、权、利相互分离",{"key":31,"text":108,"correct":26},"重视调动人的主动性和积极性",{"key":34,"text":110,"correct":22},"要淡化传统意义中严格的岗位职责","ABD",{"id":113,"libraryId":5,"type":15,"typeLabel":16,"stem":114,"options":115,"answer":123,"analysis":37},953788,"建设项目的主要参建单位包括( )。",[116,117,118,119,121],{"key":20,"text":92,"correct":22},{"key":24,"text":92,"correct":26},{"key":28,"text":94,"correct":26},{"key":31,"text":120,"correct":26},"供货方",{"key":34,"text":122,"correct":22},"监理方","BCD",{"id":125,"libraryId":5,"type":15,"typeLabel":16,"stem":126,"options":127,"answer":138,"analysis":37},953789,"建设项目周期，也称为建设项目全寿命周期，是指从建设意图产生到项目对象废除的全过程，通常分为( )。",[128,130,132,134,136],{"key":20,"text":129,"correct":22},"规划期",{"key":24,"text":131,"correct":22},"保修期",{"key":28,"text":133,"correct":26},"决策期",{"key":31,"text":135,"correct":26},"实施期",{"key":34,"text":137,"correct":26},"生产运营期","CDE",{"id":140,"libraryId":5,"type":15,"typeLabel":16,"stem":141,"options":142,"answer":138,"analysis":37},953790,"在初步设计阶段，项目投资控制的主要任务是运用( )等，以可行性研究报告中被批准的投资估算为投资控制计划值，对初步设计工作进行控制。",[143,145,147,149,151],{"key":20,"text":144,"correct":22},"工程计量",{"key":24,"text":146,"correct":22},"工程变更控制",{"key":28,"text":148,"correct":26},"限额设计方法",{"key":31,"text":150,"correct":26},"价值工程方法",{"key":34,"text":152,"correct":26},"设计标准与标准设计",{"id":154,"libraryId":5,"type":15,"typeLabel":16,"stem":155,"options":156,"answer":165,"analysis":37},953791,"对投资建设项目来说，组织中常见的作业控制主要包括( )。",[157,159,160,161,163],{"key":20,"text":158,"correct":26},"投资(成本)控制",{"key":24,"text":79,"correct":26},{"key":28,"text":75,"correct":26},{"key":31,"text":162,"correct":26},"安全控制",{"key":34,"text":164,"correct":22},"信息控制","ABCD",{"id":167,"libraryId":5,"type":15,"typeLabel":16,"stem":168,"options":169,"answer":180,"analysis":37},953792,"项目具有的基本特点包括( )。",[170,172,174,176,178],{"key":20,"text":171,"correct":26},"具有确定的目标",{"key":24,"text":173,"correct":26},"面临许多约束条件",{"key":28,"text":175,"correct":26},"具有独特性",{"key":31,"text":177,"correct":22},"是循环性的过程",{"key":34,"text":179,"correct":26},"存在许多不确定性因素","ABCE",{"id":182,"libraryId":5,"type":15,"typeLabel":16,"stem":183,"options":184,"answer":192,"analysis":37},953793,"在施工图设计阶段，项目投资控制的主要任务是以被批准的设计概算为控制目标，应用( )等方法，以设计概算控制施工图设计工作的进行。",[185,187,189,190,191],{"key":20,"text":186,"correct":26},"限额设计",{"key":24,"text":188,"correct":26},"价值工程",{"key":28,"text":144,"correct":22},{"key":31,"text":146,"correct":22},{"key":34,"text":152,"correct":22},"AB",{"id":194,"libraryId":5,"type":15,"typeLabel":16,"stem":195,"options":196,"answer":207,"analysis":37},953794,"在项目前期和设计阶段，质量目标计划值和实际值的比较主要包括( )。",[197,199,201,203,205],{"key":20,"text":198,"correct":26},"技术设计和初步设计的比较",{"key":24,"text":200,"correct":22},"设备质量和设计要求的比较",{"key":28,"text":202,"correct":22},"材料质量和施工图设计要求的比较",{"key":31,"text":204,"correct":26},"初步设计和可行性研究报告、设计规范的比较",{"key":34,"text":206,"correct":26},"施工图设计和技术设计或初步设计、设计规范的比较","ADE",{"id":209,"libraryId":5,"type":15,"typeLabel":16,"stem":210,"options":211,"answer":82,"analysis":37},953795,"管理的职能中，控制的对象有( )。",[212,214,216,218,220],{"key":20,"text":213,"correct":22},"对物的控制",{"key":24,"text":215,"correct":26},"对财务的控制",{"key":28,"text":217,"correct":26},"对作业的控制",{"key":31,"text":219,"correct":26},"对信息的控制",{"key":34,"text":221,"correct":26},"对人员的控制",{"id":223,"libraryId":5,"type":15,"typeLabel":16,"stem":224,"options":225,"answer":82,"analysis":37},953796,"建设项目实施和管理的参与单位主要包括( )。",[226,228,230,231,232],{"key":20,"text":227,"correct":22},"金融机构",{"key":24,"text":229,"correct":26},"工程咨询服务机构",{"key":28,"text":120,"correct":26},{"key":31,"text":94,"correct":26},{"key":34,"text":233,"correct":26},"项目总承包方",{"id":235,"libraryId":5,"type":15,"typeLabel":16,"stem":236,"options":237,"answer":165,"analysis":37},953797,"管理的经济方法中，经济手段主要包括( )及经济合同等。",[238,240,242,244,246],{"key":20,"text":239,"correct":26},"价格、税收",{"key":24,"text":241,"correct":26},"信贷",{"key":28,"text":243,"correct":26},"工资、罚款",{"key":31,"text":245,"correct":26},"奖金、利润",{"key":34,"text":247,"correct":22},"开除",{"id":249,"libraryId":5,"type":15,"typeLabel":16,"stem":250,"options":251,"answer":165,"analysis":37},953798,"管理方法一般可以分为( )和管理的技术方法，它们构成了一个完整的管理方法体系。",[252,254,256,258,260],{"key":20,"text":253,"correct":26},"管理的法律方法",{"key":24,"text":255,"correct":26},"管理的行政方法",{"key":28,"text":257,"correct":26},"管理的经济方法",{"key":31,"text":259,"correct":26},"管理的教育方法",{"key":34,"text":261,"correct":22},"管理的道德方法",{"id":263,"libraryId":5,"type":15,"typeLabel":16,"stem":264,"options":265,"answer":276,"analysis":37},953799,"施工方项目管理的目标为( )。",[266,268,270,272,274],{"key":20,"text":267,"correct":26},"工程施工的成本目标",{"key":24,"text":269,"correct":26},"工程施工的进度目标",{"key":28,"text":271,"correct":26},"工程施工的质量目标",{"key":31,"text":273,"correct":22},"供货的进度目标",{"key":34,"text":275,"correct":22},"供货方的成本目标","ABC",{"id":278,"libraryId":5,"type":15,"typeLabel":16,"stem":279,"options":280,"answer":291,"analysis":37},953800,"行政方法的特点包括( )。",[281,283,285,287,289],{"key":20,"text":282,"correct":26},"权威性",{"key":24,"text":284,"correct":22},"有偿性",{"key":28,"text":286,"correct":26},"强制性",{"key":31,"text":288,"correct":26},"具体性",{"key":34,"text":290,"correct":26},"垂直性","ACDE",{"id":293,"libraryId":5,"type":15,"typeLabel":16,"stem":294,"options":295,"answer":180,"analysis":37},953801,"在建设项目价值工程正式研究阶段，按照通常的价值工程研究活动计划，可分为( )、收集信息等步骤。",[296,298,300,302,304],{"key":20,"text":297,"correct":26},"方案创造",{"key":24,"text":299,"correct":26},"方案分析",{"key":28,"text":301,"correct":26},"方案发展与评价",{"key":31,"text":303,"correct":22},"建立费用模型",{"key":34,"text":305,"correct":26},"最终提案",{"id":307,"libraryId":5,"type":15,"typeLabel":16,"stem":308,"options":309,"answer":165,"analysis":37},953802,"建设项目的实施阶段可以划分为( )和保修阶段。",[310,312,314,316,318],{"key":20,"text":311,"correct":26},"设计准备阶段",{"key":24,"text":313,"correct":26},"设计阶段",{"key":28,"text":315,"correct":26},"施工阶段",{"key":31,"text":317,"correct":26},"动用前准备阶段",{"key":34,"text":319,"correct":22},"决策阶段",{"id":321,"libraryId":5,"type":15,"typeLabel":16,"stem":322,"options":323,"answer":207,"analysis":37},953803,"建设项目界面管理的共同模式和方法可归纳为( )。",[324,326,328,330,332],{"key":20,"text":325,"correct":26},"保持静界面的清楚界限",{"key":24,"text":327,"correct":22},"保持动界面的清楚界限",{"key":28,"text":329,"correct":22},"管理的注意力应放在跨越界面时的检查、监督和整体效益上",{"key":31,"text":331,"correct":26},"协调与处理具有相互依存关系的动界面，对于每个主要的界面进行特殊管理",{"key":34,"text":333,"correct":26},"划分建设项目的子系统，识别主导子系统的界面并能成功地处理其相互作用，应注意区分静界面和动界面，以便重点控制",{"id":335,"libraryId":5,"type":15,"typeLabel":16,"stem":336,"options":337,"answer":291,"analysis":37},953804,"工业类建设项目的组成和划分，按照工程的性质和作用，还可分为( )。",[338,340,342,344,346],{"key":20,"text":339,"correct":26},"主要生产系统",{"key":24,"text":341,"correct":22},"技术改革系统",{"key":28,"text":343,"correct":26},"行政办公系统",{"key":31,"text":345,"correct":26},"生活设施系统",{"key":34,"text":347,"correct":26},"附属和辅助生产系统",{"id":349,"libraryId":5,"type":15,"typeLabel":16,"stem":350,"options":351,"answer":165,"analysis":37},953805,"造成建设项目价值不高的原因有很多，主要包括( )。",[352,354,356,358,360],{"key":20,"text":353,"correct":26},"进度要求紧迫",{"key":24,"text":355,"correct":26},"习惯性思维的影响",{"key":28,"text":357,"correct":26},"沟通不够",{"key":31,"text":359,"correct":26},"设计者和用户间缺乏协调",{"key":34,"text":361,"correct":22},"采用新的标准和规范",{"id":363,"libraryId":5,"type":15,"typeLabel":16,"stem":364,"options":365,"answer":165,"analysis":37},953806,"政府及社会有关管理部门包括( )。",[366,368,370,372,374],{"key":20,"text":367,"correct":26},"政府投资主管部门",{"key":24,"text":369,"correct":26},"环保主管部门",{"key":28,"text":371,"correct":26},"国土资源主管部门",{"key":31,"text":373,"correct":26},"政府建设主管部门",{"key":34,"text":375,"correct":22},"工程咨询服务部门",{"id":377,"libraryId":5,"type":15,"typeLabel":16,"stem":378,"options":379,"answer":180,"analysis":37},953807,"建设项目管理与企业管理同属于管理活动的范畴，但从建设项目管理的内涵可以看出，两者有着明显的区别，其区别包括( )。",[380,382,384,386,388],{"key":20,"text":381,"correct":26},"管理对象不同",{"key":24,"text":383,"correct":26},"管理目标不同",{"key":28,"text":385,"correct":26},"运行规律不同",{"key":31,"text":387,"correct":22},"管理性质不同",{"key":34,"text":389,"correct":26},"实施的主体不同",{"id":391,"libraryId":5,"type":15,"typeLabel":16,"stem":392,"options":393,"answer":291,"analysis":37},953808,"按照动态控制原理，在每一个投资动态控制过程中，项目管理人员的主要工作包括( )。",[394,396,398,400,402],{"key":20,"text":395,"correct":26},"对投资目标计划值的分析和论证",{"key":24,"text":397,"correct":22},"编制相关质量控制报告",{"key":28,"text":399,"correct":26},"投资目标计划值与实际值的比较",{"key":31,"text":401,"correct":26},"项目投资偏差的分析",{"key":34,"text":403,"correct":26},"项目投资偏差纠正措施的采取",{"id":405,"libraryId":5,"type":15,"typeLabel":16,"stem":406,"options":407,"answer":67,"analysis":37},953809,"管理的基本原理主要包括( )。",[408,410,412,414,416],{"key":20,"text":409,"correct":26},"管理的整体性原理",{"key":24,"text":411,"correct":26},"管理的开放性原理",{"key":28,"text":413,"correct":22},"管理的经济性原理",{"key":31,"text":415,"correct":26},"管理的环境适应性原理",{"key":34,"text":417,"correct":26},"管理的人本原理",{"id":419,"libraryId":5,"type":15,"typeLabel":16,"stem":420,"options":421,"answer":82,"analysis":37},953810,"建设项目管理的工作内容包括项目策划和项目控制，从管理主体的角度，建设项目管理分为( )，不同管理主体的项目管理的目标和任务是不同的。",[422,424,426,428,430],{"key":20,"text":423,"correct":22},"监理方项目管理",{"key":24,"text":425,"correct":26},"设计方项目管理",{"key":28,"text":427,"correct":26},"施工方项目管理",{"key":31,"text":429,"correct":26},"供货方项目管理",{"key":34,"text":431,"correct":26},"业主方项目管理",{"id":433,"libraryId":5,"type":15,"typeLabel":16,"stem":434,"options":435,"answer":82,"analysis":37},953811,"在建设工程的实施过程中，实行实施组织虚拟化有许多种形式，采用( )，以及采用施工联合体、施工合作体承包等都是典型的虚拟组织形式。",[436,438,440,442,444],{"key":20,"text":437,"correct":22},"主体结构分包",{"key":24,"text":439,"correct":26},"专业分包",{"key":28,"text":441,"correct":26},"劳务分包",{"key":31,"text":443,"correct":26},"实行管理和服务外包",{"key":34,"text":445,"correct":26},"工程项目总承包模式(D+B模式或EPC模式)",{"id":447,"libraryId":5,"type":15,"typeLabel":16,"stem":448,"options":449,"answer":52,"analysis":37},953812,"组织是为了实现某一特定目标，经由分丁与合作及不同层次的权力和责任制度而构成的人群集合系统。这个说法有的含义包括( )。",[450,452,454,456,458],{"key":20,"text":451,"correct":26},"组织必须具有目标",{"key":24,"text":453,"correct":26},"组织必须有分工与协作",{"key":28,"text":455,"correct":22},"组织必须能使经济效益最大化",{"key":31,"text":457,"correct":22},"组织决策必须准确无误",{"key":34,"text":459,"correct":26},"组织要有不同层次的权力与责任制度",{"id":461,"libraryId":5,"type":15,"typeLabel":16,"stem":462,"options":463,"answer":82,"analysis":37},953813,"建设项目质量目标可以分解为( )。",[464,466,468,470,472],{"key":20,"text":465,"correct":22},"组织质量",{"key":24,"text":467,"correct":26},"设计质量",{"key":28,"text":469,"correct":26},"施工质量",{"key":31,"text":471,"correct":26},"材料质量",{"key":34,"text":473,"correct":26},"设备质量",{"id":475,"libraryId":5,"type":15,"typeLabel":16,"stem":476,"options":477,"answer":82,"analysis":37},953814,"管理的职责应该在任务的数量、质量、时间和效益等方面进行严格规定，其表达形式主要有( )。",[478,480,482,484,486],{"key":20,"text":479,"correct":22},"控制",{"key":24,"text":481,"correct":26},"条例",{"key":28,"text":483,"correct":26},"范围",{"key":31,"text":485,"correct":26},"目标",{"key":34,"text":487,"correct":26},"计划",{"id":489,"libraryId":5,"type":15,"typeLabel":16,"stem":490,"options":491,"answer":276,"analysis":37},953815,"一定的人对所管的一定的工作能否做到完全负责，基本上取决于的因素是( )。",[492,494,496,498,499],{"key":20,"text":493,"correct":26},"权限",{"key":24,"text":495,"correct":26},"利益",{"key":28,"text":497,"correct":26},"能力",{"key":31,"text":487,"correct":22},{"key":34,"text":500,"correct":22},"领导",{"id":502,"libraryId":5,"type":15,"typeLabel":16,"stem":503,"options":504,"answer":291,"analysis":37},953816,"计划的作用主要体现在( )。",[505,507,509,511,513],{"key":20,"text":506,"correct":26},"进行目标控制的必要条件",{"key":24,"text":508,"correct":22},"节省经济开支",{"key":28,"text":510,"correct":26},"减少重复和浪费性的活动",{"key":31,"text":512,"correct":26},"为组织成员指明方向，协调组织活动",{"key":34,"text":514,"correct":26},"预测组织未来可能面临的变化，减少冲击",{"id":516,"libraryId":5,"type":15,"typeLabel":16,"stem":517,"options":518,"answer":291,"analysis":37},953817,"担任组织中指挥工作的领导人应做到是( )。",[519,521,523,525,527],{"key":20,"text":520,"correct":26},"率先做出榜样",{"key":24,"text":522,"correct":22},"对组织每天进行至少一次检查",{"key":28,"text":524,"correct":26},"对自己的员工要有深入的了解",{"key":31,"text":526,"correct":26},"能够很好地协调企业与员工之间的关系",{"key":34,"text":528,"correct":26},"在员工中保持团结、积极、创新和效忠的精神",{"id":530,"libraryId":5,"type":15,"typeLabel":16,"stem":531,"options":532,"answer":123,"analysis":37},953818,"设计方项目管理的目标为( )。",[533,534,536,538,540],{"key":20,"text":275,"correct":22},{"key":24,"text":535,"correct":26},"投资目标，包括工程设计工作的成本目标和建设项目的投资目标",{"key":28,"text":537,"correct":26},"进度目标，即工程设计工作的进度目标和建设项目的进度目标",{"key":31,"text":539,"correct":26},"质量目标，即工程设计工作的质量目标和建设项目的质量目标",{"key":34,"text":541,"correct":22},"费用目标，包括项目的总投资目标和建设项目总承包方的成本目标",{"id":543,"libraryId":5,"type":15,"typeLabel":16,"stem":544,"options":545,"answer":67,"analysis":37},953819,"投资建设项目的含义包括( )。",[546,548,550,552,554],{"key":20,"text":547,"correct":26},"\"一次性事业\"即一次性任务，表示项目的一次性特征",{"key":24,"text":549,"correct":26},"对一个投资建设项目范围的认定标准，是具有一个总体设计或初步设计",{"key":28,"text":551,"correct":22},"如国家进行建设项目统计时，对投资金额很小的项目也单独作为一个建设项目计算",{"key":31,"text":553,"correct":26},"\"经济上实行统一核算，行政上实行统一管理\"，表示项目是在一定的组织机构内进行，项目一般由一个组织或几个组织联合完成",{"key":34,"text":555,"correct":26},"投资建设项目是一种既有投资行为又有建设行为的项目，表现为其商业属性和工程技术属性，其目标是形成固定资产",{"id":557,"libraryId":5,"type":15,"typeLabel":16,"stem":558,"options":559,"answer":180,"analysis":37},953820,"管理的基本方法中，行政方法的强制性是由一系列的行政措施如( )等处分甚至开除等作为保证来执行的。",[560,562,564,566,568],{"key":20,"text":561,"correct":26},"表扬、奖励",{"key":24,"text":563,"correct":26},"晋升、任务分配",{"key":28,"text":565,"correct":26},"工作调动及批评",{"key":31,"text":567,"correct":22},"工资、利润",{"key":34,"text":569,"correct":26},"记过、降级、撤职",{"id":571,"libraryId":5,"type":15,"typeLabel":16,"stem":572,"options":573,"answer":165,"analysis":37},953821,"施工方项目管理的任务包括( )。",[574,576,578,580,582],{"key":20,"text":575,"correct":26},"工程施工安全管理",{"key":24,"text":577,"correct":26},"工程施工成本控制",{"key":28,"text":579,"correct":26},"工程施工合同管理",{"key":31,"text":581,"correct":26},"工程施工信息管理",{"key":34,"text":583,"correct":22},"与供货有关的组织与协调",{"id":585,"libraryId":5,"type":15,"typeLabel":16,"stem":586,"options":587,"answer":52,"analysis":37},953822,"在项目前期和设计阶段，投资目标计划值和实际值的比较主要包括( )。",[588,590,591,593,595],{"key":20,"text":589,"correct":26},"设计概算和投资估算的比较",{"key":24,"text":62,"correct":26},{"key":28,"text":592,"correct":22},"施工合同价和设计概算的比较",{"key":31,"text":594,"correct":22},"招标标底或招标控制价和设计概算的比较",{"key":34,"text":596,"correct":26},"施工图预算和修正概算或设计概算的比较",{"id":598,"libraryId":5,"type":15,"typeLabel":16,"stem":599,"options":600,"answer":276,"analysis":37},953823,"子系统的相互依存关系类型大约有( )。",[601,603,605,607,609],{"key":20,"text":602,"correct":26},"汇合型",{"key":24,"text":604,"correct":26},"程序型",{"key":28,"text":606,"correct":26},"往复型",{"key":31,"text":608,"correct":22},"密集型",{"key":34,"text":610,"correct":22},"分散型",{"id":612,"libraryId":5,"type":15,"typeLabel":16,"stem":613,"options":614,"answer":291,"analysis":37},953824,"关于管理行政方法的正确运用，需要注意和把握事项的表述，正确的有( )。",[615,617,619,621,623],{"key":20,"text":616,"correct":26},"管理者必须充分认识行政方法的本质是服务",{"key":24,"text":618,"correct":22},"行政方法的管理效果为领导者的水平所制约，只取决于领导者的指挥艺术和心理素质",{"key":28,"text":620,"correct":26},"行政方法的管理效果为领导者的水平所制约，取决于领导者和执行者的知识和能力",{"key":31,"text":622,"correct":26},"信息在运用行政方法过程中是至关重要的，行政方法要求有一个灵敏、有效的信息管理系统",{"key":34,"text":624,"correct":26},"不可单独依靠行政方法，要把行政方法和其他管理方法特别是经济方法有机地结合起来",{"id":626,"libraryId":5,"type":15,"typeLabel":16,"stem":627,"options":628,"answer":192,"analysis":37},953825,"企业管理是一种稳定持续活动，其管理的规律是以( )为基础。",[629,631,633,635,637],{"key":20,"text":630,"correct":26},"现代企业制度",{"key":24,"text":632,"correct":26},"企业经济活动内在规律",{"key":28,"text":634,"correct":22},"项目周期",{"key":31,"text":636,"correct":22},"企业经济活动外在规律",{"key":34,"text":638,"correct":22},"项目内在规律",{"id":640,"libraryId":5,"type":15,"typeLabel":16,"stem":641,"options":642,"answer":67,"analysis":37},953826,"设计方项目管理的任务包括( )。",[643,645,647,649,651],{"key":20,"text":644,"correct":26},"与设计工作有关的安全管理",{"key":24,"text":646,"correct":26},"工程设计工作进度控制",{"key":28,"text":648,"correct":22},"与工程施工有关的组织与协调",{"key":31,"text":650,"correct":26},"工程设计质量控制",{"key":34,"text":652,"correct":26},"工程设计工作成本控制和与工程设计有关的建设项目工程造价控制",{"id":654,"libraryId":5,"type":15,"typeLabel":16,"stem":655,"options":656,"answer":138,"analysis":37},953827,"建设项目法人或建设项目业主(简称业主方)对建设项目的管理活动，存在于建设项目全寿命周期，内容包括行政管理和专业管理两部分。其中，行政管理包括( )等事务性工作。",[657,659,661,663,665],{"key":20,"text":658,"correct":22},"开发管理",{"key":24,"text":660,"correct":22},"设施管理",{"key":28,"text":662,"correct":26},"办理各种审批手续",{"key":31,"text":664,"correct":26},"人事管理",{"key":34,"text":666,"correct":26},"财务管理",{"id":668,"libraryId":5,"type":15,"typeLabel":16,"stem":669,"options":670,"answer":67,"analysis":37},953828,"人类的管理活动最基本的职能有( )。",[671,672,674,676,677],{"key":20,"text":487,"correct":26},{"key":24,"text":673,"correct":26},"组织",{"key":28,"text":675,"correct":22},"审核",{"key":31,"text":500,"correct":26},{"key":34,"text":479,"correct":26},{"id":679,"libraryId":5,"type":15,"typeLabel":16,"stem":680,"options":681,"answer":67,"analysis":37},953829,"建设项目界面产生的原因包括( )。",[682,684,686,688,690],{"key":20,"text":683,"correct":26},"建设项目的复杂化",{"key":24,"text":685,"correct":26},"信息黏滞",{"key":28,"text":687,"correct":22},"经济冲突",{"key":31,"text":689,"correct":26},"专业化分工",{"key":34,"text":691,"correct":26},"目标差异",{"id":693,"libraryId":5,"type":15,"typeLabel":16,"stem":694,"options":695,"answer":52,"analysis":37},953830,"在项目采购和施工阶段，质量目标计划值和实际值的比较主要包括( )。",[696,697,698,699,700],{"key":20,"text":200,"correct":26},{"key":24,"text":202,"correct":26},{"key":28,"text":198,"correct":22},{"key":31,"text":204,"correct":22},{"key":34,"text":701,"correct":26},"施工质量和施工图设计、施工合同中的质量要求、施工规程及质量标准的比较",[703,707,710,713,716,719],{"id":704,"name":705,"category":7,"favorite":706},1,"领导干部任职前廉政法规知识测试题",92,{"id":708,"name":709,"category":7,"favorite":704},595,"建筑结构与设备",{"id":711,"name":712,"category":7,"favorite":704},715,"招标采购专业知识与法律法规",{"id":714,"name":715,"category":7,"favorite":704},848,"市政方向-通用基础",{"id":717,"name":718,"category":7,"favorite":8},534,"BIM工程师",{"id":720,"name":718,"category":7,"favorite":8},535]