[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-691-6":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":721},{"id":5,"name":6,"category":7,"favorite":8},691,"投资建设项目组织","建筑工程",0,6,50,349,[13,38,53,68,83,98,112,127,141,156,170,185,198,212,226,240,255,269,282,296,310,324,338,353,367,381,395,410,424,439,450,460,473,487,500,514,528,542,556,570,584,598,609,623,637,651,665,679,693,707],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":36,"analysis":37},953732,2,"多选题","薪酬管理策略，应当在( )原则下达到现实性的平衡。",[19,23,26,30,33],{"key":20,"text":21,"correct":22},"A","公平性",true,{"key":24,"text":25,"correct":22},"B","竞争性",{"key":27,"text":28,"correct":29},"C","稳定性",false,{"key":31,"text":32,"correct":22},"D","激励性",{"key":34,"text":35,"correct":22},"E","经济性","ABDE","",{"id":39,"libraryId":5,"type":15,"typeLabel":16,"stem":40,"options":41,"answer":52,"analysis":37},953733,"项目利益的直接相关人包括( )。",[42,44,46,48,50],{"key":20,"text":43,"correct":22},"承包商",{"key":24,"text":45,"correct":29},"政府相关部门",{"key":27,"text":47,"correct":22},"项目经理",{"key":31,"text":49,"correct":22},"项目组织上的高层管理者",{"key":34,"text":51,"correct":22},"项目投资人","ACDE",{"id":54,"libraryId":5,"type":15,"typeLabel":16,"stem":55,"options":56,"answer":67,"analysis":37},953734,"建设项目人力资源管理与一般组织人力资源管理的区别在于在有限的项目建设周期中，在明确的项目目标指引下，它更加突出地强调团队合作精神，可归纳为( )。",[57,59,61,63,65],{"key":20,"text":58,"correct":22},"项目的组织规划",{"key":24,"text":60,"correct":22},"项目的人员获取和任用",{"key":27,"text":62,"correct":22},"团队能力建设",{"key":31,"text":64,"correct":22},"薪酬管理",{"key":34,"text":66,"correct":29},"绩效评价","ABCD",{"id":69,"libraryId":5,"type":15,"typeLabel":16,"stem":70,"options":71,"answer":82,"analysis":37},953735,"与职能部门负责人(或职能经理)相比，项目经理的职位特点表现在( )。",[72,74,76,78,80],{"key":20,"text":73,"correct":22},"任职时间的阶段性特点",{"key":24,"text":75,"correct":29},"任职时间的持久性特点",{"key":27,"text":77,"correct":22},"能力和工作的综合性特点",{"key":31,"text":79,"correct":22},"组织职能部门间的横向协调特点",{"key":34,"text":81,"correct":29},"组织职能部门间的纵向领导特点","ACD",{"id":84,"libraryId":5,"type":15,"typeLabel":16,"stem":85,"options":86,"answer":97,"analysis":37},953736,"职位分析需要收集和整理的信息中，属于建设项目管理的内部和外部的环境信息的有( )。",[87,89,91,93,95],{"key":20,"text":88,"correct":29},"工作性质、工作流程",{"key":24,"text":90,"correct":22},"经济和文化环境",{"key":27,"text":92,"correct":22},"建设项目参与方",{"key":31,"text":94,"correct":22},"社会政治",{"key":34,"text":96,"correct":22},"建设项目的目标和任务，建设项目管理组织结构","BCDE",{"id":99,"libraryId":5,"type":15,"typeLabel":16,"stem":100,"options":101,"answer":67,"analysis":37},953737,"建设项目负责人除了在对建设项目的组织、计划、控制方面发挥领导作用外，还应具备一系列的能力，来激励他人取得成功，赢得客户的信赖，这些能力应包括( )。",[102,104,106,108,110],{"key":20,"text":103,"correct":22},"应付和解决冲突的能力",{"key":24,"text":105,"correct":22},"领导和管理的能力",{"key":27,"text":107,"correct":22},"项目团队组织和建设能力",{"key":31,"text":109,"correct":22},"谈判、沟通和人际交往和沟通的能力",{"key":34,"text":111,"correct":29},"有丰富的工作经验和广泛的人脉关系，便于工作的开展",{"id":113,"libraryId":5,"type":15,"typeLabel":16,"stem":114,"options":115,"answer":126,"analysis":37},953738,"团队能力建设的依据有( )。",[116,118,120,122,124],{"key":20,"text":117,"correct":22},"人员管理计划",{"key":24,"text":119,"correct":22},"外部反馈信息",{"key":27,"text":121,"correct":22},"建设项目的目标",{"key":31,"text":123,"correct":29},"人力资源培训与开发结果",{"key":34,"text":125,"correct":22},"工作绩效报告","ABCE",{"id":128,"libraryId":5,"type":15,"typeLabel":16,"stem":129,"options":130,"answer":67,"analysis":37},953739,"信息管理的原则包括( )。",[131,133,135,137,139],{"key":20,"text":132,"correct":22},"标准化原则",{"key":24,"text":134,"correct":22},"时效性原则",{"key":27,"text":136,"correct":22},"有效性原则",{"key":31,"text":138,"correct":22},"高效处理原则",{"key":34,"text":140,"correct":29},"减量化原则",{"id":142,"libraryId":5,"type":15,"typeLabel":16,"stem":143,"options":144,"answer":155,"analysis":37},953740,"建设项目管理信息系统的基本功能构成应包括( )三个子系统。",[145,147,149,151,153],{"key":20,"text":146,"correct":22},"进度控制",{"key":24,"text":148,"correct":29},"质量控制",{"key":27,"text":150,"correct":29},"安全管理",{"key":31,"text":152,"correct":22},"合同管理",{"key":34,"text":154,"correct":22},"投资控制(业主方)或成本控制(施工方)","ADE",{"id":157,"libraryId":5,"type":15,"typeLabel":16,"stem":158,"options":159,"answer":126,"analysis":37},953741,"与人们一般意义上理解的消息不同，信息在产生、传递和处理过程中的特性有( )。",[160,162,164,166,168],{"key":20,"text":161,"correct":22},"信息的准确性",{"key":24,"text":163,"correct":22},"信息的时效性",{"key":27,"text":165,"correct":22},"信息的有序性",{"key":31,"text":167,"correct":29},"信息的一致性",{"key":34,"text":169,"correct":22},"信息的共享性",{"id":171,"libraryId":5,"type":15,"typeLabel":16,"stem":172,"options":173,"answer":184,"analysis":37},953742,"信息资源组织与管理的工作流程对整个项目管理的顺利实施有重要意义，其内容有( )。",[174,176,178,180,182],{"key":20,"text":175,"correct":22},"工程档案管理的工作流程",{"key":24,"text":177,"correct":22},"信息管理手册编制和修订的工作流程",{"key":27,"text":179,"correct":29},"建立建设项目信息中心",{"key":31,"text":181,"correct":29},"建立建设项目信息组织与管理的处理平台",{"key":34,"text":183,"correct":22},"为形成各类报表和报告，收集信息、录入信息、审核信息、加工信息、信息传输和发布的工作流程","ABE",{"id":186,"libraryId":5,"type":15,"typeLabel":16,"stem":187,"options":188,"answer":52,"analysis":37},953743,"信息管理的任务包括( )。",[189,191,193,195,196],{"key":20,"text":190,"correct":22},"编制建设项目信息管理手册",{"key":24,"text":192,"correct":29},"负责工程档案管理",{"key":27,"text":194,"correct":22},"明确建设项目管理班子中信息管理部门的任务",{"key":31,"text":181,"correct":22},{"key":34,"text":197,"correct":22},"编制和确定完成信息资源组织与管理任务的工作流程",{"id":199,"libraryId":5,"type":15,"typeLabel":16,"stem":200,"options":201,"answer":126,"analysis":37},953744,"项目管理信息系统的合同管理子系统的基本功能包括( )。",[202,204,206,208,210],{"key":20,"text":203,"correct":22},"提供各种合同管理报表",{"key":24,"text":205,"correct":22},"经济法规库(国内外经济法规)的查询",{"key":27,"text":207,"correct":22},"涉外合同的外汇折算",{"key":31,"text":209,"correct":29},"建设项目结算与预算、合同价的对比分析",{"key":34,"text":211,"correct":22},"合同执行情况的跟踪和处理过程的管理",{"id":213,"libraryId":5,"type":15,"typeLabel":16,"stem":214,"options":215,"answer":52,"analysis":37},953745,"与传统的信息处理技术和工具相比，国际上普遍认为成熟的BIM需具备的标准包括( )。",[216,218,220,222,224],{"key":20,"text":217,"correct":22},"模型是三维的，可以更好表达复杂的建设情景",{"key":24,"text":219,"correct":29},"模型中的信息可以用于项目的主要阶段阶段",{"key":27,"text":221,"correct":22},"构件中内含的信息可以表达构件的属性和行为，支持数字化分析工作",{"key":31,"text":223,"correct":22},"项目中的不同参与方可通过协同工作来获得所需的数据",{"key":34,"text":225,"correct":22},"采用智能化(计算机可以识别的)与数字化的方式来表示建筑构件，模型中的数据需是定量的、可计量维度的、可查询的",{"id":227,"libraryId":5,"type":15,"typeLabel":16,"stem":228,"options":229,"answer":52,"analysis":37},953746,"未来工程建设的信息资源的组织和管理具有的特征包括( )。",[230,232,234,236,238],{"key":20,"text":231,"correct":22},"对信息的产生、保存及传播进行有效管理",{"key":24,"text":233,"correct":29},"在工程建设各阶段，只有方都能随时随地获得所需要的各种项目信息",{"key":27,"text":235,"correct":22},"减少距离的影响，使项目团队成员相互进行信息交流和沟通时有同处一地的感觉",{"key":31,"text":237,"correct":22},"用基于虚拟现实的、逼真的工程项目模型指导工程建设的设计与施工全过程",{"key":34,"text":239,"correct":22},"避免工程项目各组成部分之间，工程建设实施各阶段之间以及在参与建设的各方之间的分离现象",{"id":241,"libraryId":5,"type":15,"typeLabel":16,"stem":242,"options":243,"answer":254,"analysis":37},953747,"建设单位档案管理的职责包括( )。",[244,246,248,250,252],{"key":20,"text":245,"correct":29},"监督检查工程文件的真实性、完整性和准确性",{"key":24,"text":247,"correct":22},"编制基建文件的套数不得少于地方城建档案部门要求",{"key":27,"text":249,"correct":22},"负责在工程建设过程中对工程档案进行检查并签署意见",{"key":31,"text":251,"correct":29},"接收建设单位的委托进行工程档案的组织编制工作",{"key":34,"text":253,"correct":22},"应加强对基建文件的管理工作，并设专人负责基建文件的收集、整理和归档工作","BCE",{"id":256,"libraryId":5,"type":15,"typeLabel":16,"stem":257,"options":258,"answer":36,"analysis":37},953748,"项目管理信息系统的投资控制子系统的基本功能包括( )。",[259,261,263,265,267],{"key":20,"text":260,"correct":22},"编制投资估算",{"key":24,"text":262,"correct":22},"建设项目概算与预算的对比分析",{"key":27,"text":264,"correct":29},"提供和选择标准的合同文本",{"key":31,"text":266,"correct":22},"合同价与投资估算、概算、预算的对比分析",{"key":34,"text":268,"correct":22},"实际投资与概算、预算、合同价的对比分析",{"id":270,"libraryId":5,"type":15,"typeLabel":16,"stem":271,"options":272,"answer":36,"analysis":37},953749,"投资建设项目管理班子中各个工作部门的管理工作都与信息处理有关，而信息管理部门的主要工作任务是( )。",[273,274,276,278,280],{"key":20,"text":192,"correct":22},{"key":24,"text":275,"correct":22},"负责信息处理工作平台的建立和运行维护",{"key":27,"text":277,"correct":29},"负责制定信息管理的保密制度",{"key":31,"text":279,"correct":22},"负责协调和组织项目管理班子中各个工作部门的信息处理工作",{"key":34,"text":281,"correct":22},"与其他工作部门协同组织收集信息、处理信息和形成各种反映项目进展和项目目标控制的报表和报告",{"id":283,"libraryId":5,"type":15,"typeLabel":16,"stem":284,"options":285,"answer":52,"analysis":37},953750,"对投资建设项目的信息进行分类必须遵循的基本原则包括( )。",[286,288,290,292,294],{"key":20,"text":287,"correct":22},"稳定性原则",{"key":24,"text":289,"correct":29},"可预见性原则",{"key":27,"text":291,"correct":22},"兼容性原则",{"key":31,"text":293,"correct":22},"逻辑性原则",{"key":34,"text":295,"correct":22},"可扩展性原则",{"id":297,"libraryId":5,"type":15,"typeLabel":16,"stem":298,"options":299,"answer":67,"analysis":37},953751,"建立健全的信息管理制度应包括的内容有( )。",[300,302,304,306,308],{"key":20,"text":301,"correct":22},"建立统一的建设项目信息编码体系",{"key":24,"text":303,"correct":22},"对信息系统的输入\u002F输出报表进行规范和统一",{"key":27,"text":305,"correct":22},"建立完善的建设项目信息流程",{"key":31,"text":307,"correct":22},"注重基础数据的收集和传递",{"key":34,"text":309,"correct":29},"开发和引进建设项目管理信息系统软件",{"id":311,"libraryId":5,"type":15,"typeLabel":16,"stem":312,"options":313,"answer":36,"analysis":37},953752,"为确保工程档案的质量，( )必须进行签字或盖章。",[314,316,318,320,322],{"key":20,"text":315,"correct":22},"编制单位",{"key":24,"text":317,"correct":22},"制图人",{"key":27,"text":319,"correct":29},"审核人",{"key":31,"text":321,"correct":22},"技术负责人",{"key":34,"text":323,"correct":22},"监理工程师",{"id":325,"libraryId":5,"type":15,"typeLabel":16,"stem":326,"options":327,"answer":67,"analysis":37},953753,"建设项目信息管理手册主要内容包括( )。",[328,330,332,334,336],{"key":20,"text":329,"correct":22},"信息流程图",{"key":24,"text":331,"correct":22},"工程档案管理制度",{"key":27,"text":333,"correct":22},"信息管理的保密制度",{"key":31,"text":335,"correct":22},"各项信息管理工作的工作流程图",{"key":34,"text":337,"correct":29},"信息管理的任务分工表和工程进度报表",{"id":339,"libraryId":5,"type":15,"typeLabel":16,"stem":340,"options":341,"answer":352,"analysis":37},953754,"PIP产品的核心功能是一致的，主要核心功能是( )。",[342,344,346,348,350],{"key":20,"text":343,"correct":29},"统一编码",{"key":24,"text":345,"correct":29},"变更提醒",{"key":27,"text":347,"correct":22},"文档管理",{"key":31,"text":349,"correct":22},"项目信息交流",{"key":34,"text":351,"correct":22},"协同工作","CDE",{"id":354,"libraryId":5,"type":15,"typeLabel":16,"stem":355,"options":356,"answer":36,"analysis":37},953755,"建设项目的投资项编码并不是概预算定额确定的分部分项工程的编码，它应综合考虑( )等因素，建立统一的编码，以服务于项目投资目标的动态控制。",[357,359,361,363,365],{"key":20,"text":358,"correct":22},"标底",{"key":24,"text":360,"correct":22},"概算、预算",{"key":27,"text":362,"correct":29},"决算",{"key":31,"text":364,"correct":22},"合同价",{"key":34,"text":366,"correct":22},"工程款的支付",{"id":368,"libraryId":5,"type":15,"typeLabel":16,"stem":369,"options":370,"answer":67,"analysis":37},953756,"工程施工单位档案管理的职责包括( )。",[371,373,375,377,379],{"key":20,"text":372,"correct":22},"接受建设单位的委托进行工程档案的组织编制工作",{"key":24,"text":374,"correct":22},"负责编制的施工文件的套数不得少于地方城建档案部门要求",{"key":27,"text":376,"correct":22},"总承包单位负责汇总整理各分包单位编制的全部施工文件",{"key":31,"text":378,"correct":22},"按要求在竣工前将施工文件整理汇总完毕并移交建设单位进行工程竣工验收",{"key":34,"text":380,"correct":29},"负责接收和保管所辖范围应当永久和长期保存的工程档案和有关资料",{"id":382,"libraryId":5,"type":15,"typeLabel":16,"stem":383,"options":384,"answer":126,"analysis":37},953757,"在进行项目信息分类时，按信息的内容属性不同，项目信息可分为( )。",[385,387,389,391,393],{"key":20,"text":386,"correct":22},"组织类信息",{"key":24,"text":388,"correct":22},"经济类信息",{"key":27,"text":390,"correct":22},"技术类信息",{"key":31,"text":392,"correct":29},"教育类信息",{"key":34,"text":394,"correct":22},"法规类信息",{"id":396,"libraryId":5,"type":15,"typeLabel":16,"stem":397,"options":398,"answer":409,"analysis":37},953758,"在进行项目信息分类时，按项目管理工作的任务不同项目信息可分为( )。",[399,401,403,405,407],{"key":20,"text":400,"correct":22},"投资控制信息",{"key":24,"text":402,"correct":22},"进度控制信息",{"key":27,"text":404,"correct":22},"质量控制信息",{"key":31,"text":406,"correct":29},"招标投标信息",{"key":34,"text":408,"correct":29},"设计准备信息","ABC",{"id":411,"libraryId":5,"type":15,"typeLabel":16,"stem":412,"options":413,"answer":52,"analysis":37},953759,"项目管理信息系统的进度控制子系统的基本功能包括( )。",[414,416,418,420,422],{"key":20,"text":415,"correct":22},"绘制网络图",{"key":24,"text":417,"correct":29},"投资估算与项目概算的对比分析",{"key":27,"text":419,"correct":22},"实际进度与计划进度的动态比较",{"key":31,"text":421,"correct":22},"提供多种(不同管理平面)工程进度报表",{"key":34,"text":423,"correct":22},"编制双代号网络计划(CPM)和单代号搭接网络计划(MPM)",{"id":425,"libraryId":5,"type":15,"typeLabel":16,"stem":426,"options":427,"answer":438,"analysis":37},953760,"项目的管理信息包括项目( )等各方面信息。",[428,430,432,434,436],{"key":20,"text":429,"correct":22},"投资管理",{"key":24,"text":431,"correct":22},"进度管理",{"key":27,"text":433,"correct":29},"施工技术方案",{"key":31,"text":435,"correct":22},"风险管理和安全管理",{"key":34,"text":437,"correct":29},"资金使用计划","ABD",{"id":440,"libraryId":5,"type":15,"typeLabel":16,"stem":441,"options":442,"answer":352,"analysis":37},953761,"地方城建档案部门职责包括( )。",[443,444,445,446,448],{"key":20,"text":249,"correct":29},{"key":24,"text":378,"correct":29},{"key":27,"text":380,"correct":22},{"key":31,"text":447,"correct":22},"负责对城建档案工作进行业务指导，监督和检查有关城建档案法规的实施",{"key":34,"text":449,"correct":22},"列入向本部门报送工程档案范围的建设项目，其竣工验收应有本部门参加并负责对移交的工程档案进行验收",{"id":451,"libraryId":5,"type":15,"typeLabel":16,"stem":452,"options":453,"answer":97,"analysis":37},953762,"建设工程项目的信息包括在项目决策过程、实施过程和运行过程中产生的信息，以及其他与项目建设有关的信息，它包括项目的( )。",[454,455,456,457,459],{"key":20,"text":392,"correct":29},{"key":24,"text":386,"correct":22},{"key":27,"text":388,"correct":22},{"key":31,"text":458,"correct":22},"管理类信息",{"key":34,"text":390,"correct":22},{"id":461,"libraryId":5,"type":15,"typeLabel":16,"stem":462,"options":463,"answer":97,"analysis":37},953763,"工程监理单位档案管理职责包括( )。",[464,466,468,470,471],{"key":20,"text":465,"correct":29},"建设项目的施工文件应设专人负责收集和整理",{"key":24,"text":467,"correct":22},"编制的监理文件的套数不得少于地方城建档案部门要求",{"key":27,"text":469,"correct":22},"监理档案在归档前必须由项目总监理工程师审核",{"key":31,"text":245,"correct":22},{"key":34,"text":472,"correct":22},"应加强监理资料的管理工作，并设专人负责监理文件的收集、整理和归档工作",{"id":474,"libraryId":5,"type":15,"typeLabel":16,"stem":475,"options":476,"answer":184,"analysis":37},953764,"项目的经济类信息包括( )。",[477,479,481,483,485],{"key":20,"text":478,"correct":22},"工程款支付信息",{"key":24,"text":480,"correct":22},"建设项目材料信息",{"key":27,"text":482,"correct":29},"施工技术方案信息",{"key":31,"text":484,"correct":29},"材料设备技术指标",{"key":34,"text":486,"correct":22},"设备、人工市场价格信息",{"id":488,"libraryId":5,"type":15,"typeLabel":16,"stem":489,"options":490,"answer":499,"analysis":37},953765,"技术类信息包括国家或地区的技术规范标准、( )等信息。",[491,493,494,496,498],{"key":20,"text":492,"correct":29},"建设程序法规要求",{"key":24,"text":433,"correct":22},{"key":27,"text":495,"correct":29},"合同管理信息",{"key":31,"text":497,"correct":22},"项目设计图纸",{"key":34,"text":484,"correct":22},"BDE",{"id":501,"libraryId":5,"type":15,"typeLabel":16,"stem":502,"options":503,"answer":97,"analysis":37},953766,"我国一般将建设项目划分为( )。",[504,506,508,510,512],{"key":20,"text":505,"correct":29},"复杂工程",{"key":24,"text":507,"correct":22},"单项工程",{"key":27,"text":509,"correct":22},"分部工程",{"key":31,"text":511,"correct":22},"单位工程",{"key":34,"text":513,"correct":22},"分项工程",{"id":515,"libraryId":5,"type":15,"typeLabel":16,"stem":516,"options":517,"answer":52,"analysis":37},953767,"人本原理包括的主要内容有( )。",[518,520,522,524,526],{"key":20,"text":519,"correct":22},"人是组织的主体",{"key":24,"text":521,"correct":29},"职责界限要清楚",{"key":27,"text":523,"correct":22},"服务于人是管理的根本目的",{"key":31,"text":525,"correct":22},"组织成员的参与是有效管理的关键",{"key":34,"text":527,"correct":22},"使人性得到最完美的发展是现代管理的核心",{"id":529,"libraryId":5,"type":15,"typeLabel":16,"stem":530,"options":531,"answer":409,"analysis":37},953768,"下列各方的项目管理目标中，( )的项目管理目标是项目实施期中某个阶段的目标或是某个单体项目的目标。",[532,534,536,538,540],{"key":20,"text":533,"correct":22},"设计方",{"key":24,"text":535,"correct":22},"施工方",{"key":27,"text":537,"correct":22},"供货方",{"key":31,"text":539,"correct":29},"业主方",{"key":34,"text":541,"correct":29},"金融机构",{"id":543,"libraryId":5,"type":15,"typeLabel":16,"stem":544,"options":545,"answer":555,"analysis":37},953769,"确定管理职责应该注意的方面包括( )。",[546,547,549,551,553],{"key":20,"text":521,"correct":22},{"key":24,"text":548,"correct":29},"具体职责横向分配",{"key":27,"text":550,"correct":22},"职责中要包括横向联系的内容",{"key":31,"text":552,"correct":29},"平均分配每一个人的职责",{"key":34,"text":554,"correct":22},"职责一定要落实到每个人，只有这样，才能做到事事有人负责","ACE",{"id":557,"libraryId":5,"type":15,"typeLabel":16,"stem":558,"options":559,"answer":52,"analysis":37},953770,"由外部专家组成价值工程研究小组具有的优点包括( )。",[560,562,564,566,568],{"key":20,"text":561,"correct":22},"邀请外部专家参与，有助于提出新的解决方案",{"key":24,"text":563,"correct":29},"邀请外部专家参与，有利于节约开支",{"key":27,"text":565,"correct":22},"外部的专家和设计人员也可能具有各种优势或不足，原设计人员的不足可能正好被外部专家的优势以及开展价值工程的努力所弥补",{"key":31,"text":567,"correct":22},"原设计人员很难自始至终参与价值工程研究活动的全过程",{"key":34,"text":569,"correct":22},"原设计方案可能存在缺陷或存在潜在的问题，由原设计人员审核或参与价值工程研究很难发现其中的问题",{"id":571,"libraryId":5,"type":15,"typeLabel":16,"stem":572,"options":573,"answer":36,"analysis":37},953771,"工程咨询服务机构包括( )。",[574,576,578,580,582],{"key":20,"text":575,"correct":22},"工程咨询单位",{"key":24,"text":577,"correct":22},"造价咨询单位",{"key":27,"text":579,"correct":29},"工程设计单位",{"key":31,"text":581,"correct":22},"招标代理单位",{"key":34,"text":583,"correct":22},"工程监理单位",{"id":585,"libraryId":5,"type":15,"typeLabel":16,"stem":586,"options":587,"answer":97,"analysis":37},953772,"按建设项目不同参与方的工作性质和组织特征划分，项目管理的类型主要有( )。",[588,590,592,594,596],{"key":20,"text":589,"correct":29},"政府的项目管理",{"key":24,"text":591,"correct":22},"设计方的项目管理",{"key":27,"text":593,"correct":22},"施工方的项目管理",{"key":31,"text":595,"correct":22},"业主方的项目管理",{"key":34,"text":597,"correct":22},"供货方的项目管理",{"id":599,"libraryId":5,"type":15,"typeLabel":16,"stem":600,"options":601,"answer":608,"analysis":37},953773,"建设项目实施过程中可能涉及的相关单位或部门中，可称为项目相关方的包括( )。",[602,603,605,606,607],{"key":20,"text":533,"correct":29},{"key":24,"text":604,"correct":22},"政府及社会有关管理部门",{"key":27,"text":535,"correct":29},{"key":31,"text":541,"correct":22},{"key":34,"text":537,"correct":29},"BD",{"id":610,"libraryId":5,"type":15,"typeLabel":16,"stem":611,"options":612,"answer":438,"analysis":37},953774,"建设项目总承包方项目管理的目标为( )。",[613,615,617,619,621],{"key":20,"text":614,"correct":22},"质量目标，即项目的质量目标",{"key":24,"text":616,"correct":22},"进度目标，即项目的进度目标",{"key":27,"text":618,"correct":29},"进度目标，即工程设计工作的进度目标和建设项目的进度目标",{"key":31,"text":620,"correct":22},"费用目标，包括项目的总投资目标和建设项目总承包方的成本目标",{"key":34,"text":622,"correct":29},"投资目标，包括工程设计工作的成本目标和建设项目的投资目标",{"id":624,"libraryId":5,"type":15,"typeLabel":16,"stem":625,"options":626,"answer":409,"analysis":37},953775,"建设项目界面管理中，横向界面的协商合作准则具体地可表现为( )。",[627,629,631,633,635],{"key":20,"text":628,"correct":22},"跨职能整合",{"key":24,"text":630,"correct":22},"充分沟通",{"key":27,"text":632,"correct":22},"充实等级",{"key":31,"text":634,"correct":29},"立完善的管理协调机制",{"key":34,"text":636,"correct":29},"选择合格的项目经理人员",{"id":638,"libraryId":5,"type":15,"typeLabel":16,"stem":639,"options":640,"answer":352,"analysis":37},953776,"利用项目参与各方自己的力量进行价值工程研究活动的优点在于( )。",[641,643,645,647,649],{"key":20,"text":642,"correct":29},"有助于提出新的解决方案",{"key":24,"text":644,"correct":29},"有助于提出新的问题",{"key":27,"text":646,"correct":22},"对设计改进建议的反对意见和抵触情绪可以减少甚至消除",{"key":31,"text":648,"correct":22},"由项目实施各方内部人员参与价值工程研究活动，有助于加强彼此的沟通和交流",{"key":34,"text":650,"correct":22},"由项目实施各方内部人员参与价值工程研究活动，可以降低价值工程研究活动的成本",{"id":652,"libraryId":5,"type":15,"typeLabel":16,"stem":653,"options":654,"answer":36,"analysis":37},953777,"投资建设项目的特点包括( )。",[655,657,659,661,663],{"key":20,"text":656,"correct":22},"具有明确的建设任务",{"key":24,"text":658,"correct":22},"具有明确的质量、进度和投资目标",{"key":27,"text":660,"correct":29},"建设项目具有易变性特点",{"key":31,"text":662,"correct":22},"建设产品具有整体性的特点",{"key":34,"text":664,"correct":22},"建设项目的投资巨大，价值高昂",{"id":666,"libraryId":5,"type":15,"typeLabel":16,"stem":667,"options":668,"answer":67,"analysis":37},953778,"\"项目策划\"是指目标控制前的一系列策划和准备工作，应该包括项目决策策划和项目实施策划，在项目管理内涵中指的是项目实施的策划，包括( )。",[669,671,673,675,677],{"key":20,"text":670,"correct":22},"项目目标的分析",{"key":24,"text":672,"correct":22},"项目目标的再论证",{"key":27,"text":674,"correct":22},"组织策划",{"key":31,"text":676,"correct":22},"合同策划",{"key":34,"text":678,"correct":29},"领导分析",{"id":680,"libraryId":5,"type":15,"typeLabel":16,"stem":681,"options":682,"answer":155,"analysis":37},953779,"控制的特征体现在( )。",[683,685,687,689,691],{"key":20,"text":684,"correct":22},"控制是一个过程",{"key":24,"text":686,"correct":29},"控制必须有分工与协作",{"key":27,"text":688,"correct":29},"控制要有不同层次的权力与责任制度",{"key":31,"text":690,"correct":22},"控制是通过监督和纠偏两个环节来实现的",{"key":34,"text":692,"correct":22},"控制有很强的目的性，控制是为了保证组织中的各项活动按计划进行",{"id":694,"libraryId":5,"type":15,"typeLabel":16,"stem":695,"options":696,"answer":97,"analysis":37},953780,"为实施工程进度目标的动态控制，项目管理人员的工作包括的主要方面有( )。",[697,699,701,703,705],{"key":20,"text":698,"correct":29},"投资目标计划值与实际值的比较",{"key":24,"text":700,"correct":22},"协调进度计划执行过程中的问题",{"key":27,"text":702,"correct":22},"采集、汇总和分析实际进度数据",{"key":31,"text":704,"correct":22},"定期进行进度计划值和实际值的比较",{"key":34,"text":706,"correct":22},"如发现偏差，采取进度调整措施或调整进度计划",{"id":708,"libraryId":5,"type":15,"typeLabel":16,"stem":709,"options":710,"answer":97,"analysis":37},953781,"在建设项目价值工程研究准备阶段应该完成的工作有( )。",[711,713,715,717,719],{"key":20,"text":712,"correct":29},"收集信息和进行功能分析",{"key":24,"text":714,"correct":22},"召开动员会",{"key":27,"text":716,"correct":22},"确定价值工程研究的地点和环境条件",{"key":31,"text":718,"correct":22},"成本或费用的分析，准备有关的模型和数据",{"key":34,"text":720,"correct":22},"选择参与价值工程研究的人员，组建价值工程研究小组",[722,726,729,732,735,738],{"id":723,"name":724,"category":7,"favorite":725},1,"领导干部任职前廉政法规知识测试题",92,{"id":727,"name":728,"category":7,"favorite":723},595,"建筑结构与设备",{"id":730,"name":731,"category":7,"favorite":723},715,"招标采购专业知识与法律法规",{"id":733,"name":734,"category":7,"favorite":723},848,"市政方向-通用基础",{"id":736,"name":737,"category":7,"favorite":8},534,"BIM工程师",{"id":739,"name":737,"category":7,"favorite":8},535]