[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-691-4":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":703},{"id":5,"name":6,"category":7,"favorite":8},691,"投资建设项目组织","建筑工程",0,4,50,349,[13,34,46,58,70,82,94,106,118,130,142,154,166,184,199,214,229,244,258,271,285,300,314,326,340,354,368,381,396,410,424,438,452,466,480,494,508,522,536,550,565,579,593,607,621,635,648,660,674,689],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":24,"analysis":33},953632,1,"单选题","不随建设过程中的变化而变化，只表示子系统相互关系的那种界面称为( )。",[19,23,27,30],{"key":20,"text":21,"correct":22},"A","动界面",false,{"key":24,"text":25,"correct":26},"B","静界面",true,{"key":28,"text":29,"correct":22},"C","组织界面",{"key":31,"text":32,"correct":22},"D","人员界面","",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":28,"analysis":33},953633,"在施工总承包模式条件下，设计阶段，通常是( )组织进行价值工程研究，可以邀请原设计单位和原设计人员参加，也可以不邀请。",[38,40,42,44],{"key":20,"text":39,"correct":22},"施工总承包单位",{"key":24,"text":41,"correct":22},"施工分包单位",{"key":28,"text":43,"correct":26},"业主或项目管理公司",{"key":31,"text":45,"correct":22},"监理单位",{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":28,"analysis":33},953634,"价值工程的目的是( )。",[50,52,54,56],{"key":20,"text":51,"correct":22},"对价值工程研究对象的成本分析要进行全寿命成本分析",{"key":24,"text":53,"correct":22},"能够从多专业角度，多视角地观察和分析问题",{"key":28,"text":55,"correct":26},"为了提高研究对象的价值，价值与功能和成本有关，不同的研究对象，其价值的体现不同，提高价值的方法也不同",{"key":31,"text":57,"correct":22},"对研究对象进行功能分析，通过功能分析，找出并剔除不合理的功能要求和过剩的功能，从而降低成本，提高效益",{"id":59,"libraryId":5,"type":15,"typeLabel":16,"stem":60,"options":61,"answer":31,"analysis":33},953635,"采取落实加快工程施工进度所需的资金等措施属于目标控制纠偏措施中的( )。",[62,64,66,68],{"key":20,"text":63,"correct":22},"技术措施",{"key":24,"text":65,"correct":22},"管理措施",{"key":28,"text":67,"correct":22},"组织措施",{"key":31,"text":69,"correct":26},"经济措施",{"id":71,"libraryId":5,"type":15,"typeLabel":16,"stem":72,"options":73,"answer":28,"analysis":33},953636,"在工程施工阶段，项目投资控制的主要任务是以( )等为控制依据，通过工程计量、工程变更控制等方法，按照承包方实际完成的工程量，严格确定施工阶段实际发生的工程费用。",[74,76,78,80],{"key":20,"text":75,"correct":22},"投资估算、工程施工承包合同价",{"key":24,"text":77,"correct":22},"施工图预算、投资估算",{"key":28,"text":79,"correct":26},"施工图预算、工程施工承包合同价",{"key":31,"text":81,"correct":22},"投资估算、设计概算",{"id":83,"libraryId":5,"type":15,"typeLabel":16,"stem":84,"options":85,"answer":28,"analysis":33},953637,"主要在项目实施准备阶段进行，并延伸到项目实施阶段和投产竣工阶段的工作是( )。",[86,88,90,92],{"key":20,"text":87,"correct":22},"施工方项目管理",{"key":24,"text":89,"correct":22},"供货方项目管理",{"key":28,"text":91,"correct":26},"设计方项目管理",{"key":31,"text":93,"correct":22},"总承包方项目管理",{"id":95,"libraryId":5,"type":15,"typeLabel":16,"stem":96,"options":97,"answer":24,"analysis":33},953638,"根据统计和经验，( )开展价值工程研究活动可以节约造价的5%~10%，甚至更高，所以对投资大的项目进行研究，可以节约的资金就更多，效果就更明显，价值工程的效益就更高。",[98,100,102,104],{"key":20,"text":99,"correct":22},"复杂的项目",{"key":24,"text":101,"correct":26},"投资大的项目",{"key":28,"text":103,"correct":22},"重复生产的产品或项目",{"key":31,"text":105,"correct":22},"工程预算限制严的项目",{"id":107,"libraryId":5,"type":15,"typeLabel":16,"stem":108,"options":109,"answer":24,"analysis":33},953639,"下列各方的项目管理工作中，( )面向整个项目实施期。",[110,112,114,116],{"key":20,"text":111,"correct":22},"供货方的项目管理工作",{"key":24,"text":113,"correct":26},"建设项目总承包方项目管理工作",{"key":28,"text":115,"correct":22},"施工方的项目管理工作",{"key":31,"text":117,"correct":22},"设计方的项目管理工作",{"id":119,"libraryId":5,"type":15,"typeLabel":16,"stem":120,"options":121,"answer":24,"analysis":33},953640,"在竣工验收阶段，项目投资控制的主要任务是( )。",[122,124,126,128],{"key":20,"text":123,"correct":22},"以工程设计文件为依据，结合工程施工的具体情况，参与招标文件的制定",{"key":24,"text":125,"correct":26},"全面汇集在工程建设过程中实际花费的全部费用，编制竣工决算",{"key":28,"text":127,"correct":22},"以被批准的设计概算为控制目标，应用限额设计、价值工程等方法，以设计概算控制施工图设计工作的进行",{"key":31,"text":129,"correct":22},"以施工图预算、工程施工承包合同价等为控制依据，通过工程计量、工程变更控制等方法，按照承包方实际完成的工程量，严格确定施工阶段实际发生的工程费用",{"id":131,"libraryId":5,"type":15,"typeLabel":16,"stem":132,"options":133,"answer":28,"analysis":33},953641,"建设项目的投资控制目标是项目实际总投资不超过项目计划总投资，按我国的一般规定，即项目( )。",[134,136,138,140],{"key":20,"text":135,"correct":22},"设计概算不超过竣工决算价",{"key":24,"text":137,"correct":22},"竣工决算价不超过投资估算",{"key":28,"text":139,"correct":26},"竣工决算价不超过设计概算",{"key":31,"text":141,"correct":22},"投资估算不超过竣工决算价",{"id":143,"libraryId":5,"type":15,"typeLabel":16,"stem":144,"options":145,"answer":31,"analysis":33},953642,"在价值工程研究活动中，( )阶段的目标是筛选创造阶段的建议和设想，选择最好的想法来发展细化，形成提案。",[146,148,150,152],{"key":20,"text":147,"correct":22},"方案创造",{"key":24,"text":149,"correct":22},"功能分析",{"key":28,"text":151,"correct":22},"最终提案",{"key":31,"text":153,"correct":26},"方案评价",{"id":155,"libraryId":5,"type":15,"typeLabel":16,"stem":156,"options":157,"answer":20,"analysis":33},953643,"在建设项目决策期的专业管理是( )。",[158,160,162,164],{"key":20,"text":159,"correct":26},"开发管理",{"key":24,"text":161,"correct":22},"项目管理",{"key":28,"text":163,"correct":22},"设施管理",{"key":31,"text":165,"correct":22},"运营管理",{"id":167,"libraryId":5,"type":168,"typeLabel":169,"stem":170,"options":171,"answer":183,"analysis":33},953644,2,"多选题","常用的组织结构模式包括( )。",[172,174,176,178,180],{"key":20,"text":173,"correct":26},"职能组织结构",{"key":24,"text":175,"correct":26},"线性组织结构",{"key":28,"text":177,"correct":22},"伞形组织结构",{"key":31,"text":179,"correct":26},"矩阵组织结构",{"key":181,"text":182,"correct":22},"E","平行组织结构","ABD",{"id":185,"libraryId":5,"type":168,"typeLabel":169,"stem":186,"options":187,"answer":198,"analysis":33},953645,"建设项目组织设计主要包括的内容有( )。",[188,190,192,194,196],{"key":20,"text":189,"correct":26},"项目结构分解",{"key":24,"text":191,"correct":26},"项目管理组织结构",{"key":28,"text":193,"correct":26},"工作任务分工",{"key":31,"text":195,"correct":22},"施工进度计划",{"key":181,"text":197,"correct":26},"工作流程组织","ABCE",{"id":200,"libraryId":5,"type":168,"typeLabel":169,"stem":201,"options":202,"answer":213,"analysis":33},953646,"一个建设项目在( )的组织系统(相对于软件和硬件而言，组织系统也可称为组织件)不仅包括建设单位本身的组织系统，还包括各参与单位共同或分别建立的针对该工程项目的组织系统。",[203,205,207,209,211],{"key":20,"text":204,"correct":26},"决策阶段",{"key":24,"text":206,"correct":26},"实施阶段",{"key":28,"text":208,"correct":26},"运营阶段",{"key":31,"text":210,"correct":22},"分析评价阶段",{"key":181,"text":212,"correct":22},"准备阶段","ABC",{"id":215,"libraryId":5,"type":168,"typeLabel":169,"stem":216,"options":217,"answer":228,"analysis":33},953647,"一个施工企业，如采用矩阵组织结构模式，则纵向工作部门可以是( )和人事管理部门等。",[218,220,222,224,226],{"key":20,"text":219,"correct":26},"计划管理",{"key":24,"text":221,"correct":26},"技术管理",{"key":28,"text":223,"correct":26},"财务管理",{"key":31,"text":225,"correct":26},"合同管理",{"key":181,"text":227,"correct":22},"项目部","ABCD",{"id":230,"libraryId":5,"type":168,"typeLabel":169,"stem":231,"options":232,"answer":243,"analysis":33},953648,"一个大型建设项目如采用矩阵组织结构模式，则纵向工作部门可以是( )和物资管理等部门。",[233,235,237,239,241],{"key":20,"text":234,"correct":22},"各子项目的项目管理部",{"key":24,"text":236,"correct":26},"质量控制",{"key":28,"text":238,"correct":26},"投资控制、进度控制",{"key":31,"text":240,"correct":26},"人事管理、财务管理",{"key":181,"text":242,"correct":26},"合同管理、信息管理","BCDE",{"id":245,"libraryId":5,"type":168,"typeLabel":169,"stem":246,"options":247,"answer":228,"analysis":33},953649,"每一个建设项目应根据其特点，从多个可能的工作流程方案中确定( )等主要的工作流程组织。",[248,250,252,254,256],{"key":20,"text":249,"correct":26},"设计准备工作的流程",{"key":24,"text":251,"correct":26},"施工招标工作的流程",{"key":28,"text":253,"correct":26},"物资采购工作的流程",{"key":31,"text":255,"correct":26},"施工作业的流程",{"key":181,"text":257,"correct":22},"所有信息处理的流程",{"id":259,"libraryId":5,"type":168,"typeLabel":169,"stem":260,"options":261,"answer":243,"analysis":33},953650,"20世纪50年代，我国从当时的苏联引进了施工组织设计的管理技术，它的主要内容包括( )。",[262,264,265,267,269],{"key":20,"text":263,"correct":22},"合同结构",{"key":24,"text":195,"correct":26},{"key":28,"text":266,"correct":26},"施工平面图",{"key":31,"text":268,"correct":26},"施工安全",{"key":181,"text":270,"correct":26},"质量保证体系",{"id":272,"libraryId":5,"type":168,"typeLabel":169,"stem":273,"options":274,"answer":198,"analysis":33},953651,"在对一个项目的结构进行逐层分解，即将WBS元素划分到WBS层次中时，应遵循的原则包括( )。",[275,277,279,281,283],{"key":20,"text":276,"correct":26},"每个WBS元素应只从属于一个母层次的WBS元素",{"key":24,"text":278,"correct":26},"WBS的编制过程是一个不断反复修正的过程",{"key":28,"text":280,"correct":26},"在以文本形式表示WBS时，应使用元素编码系统来清楚地表示层次结构",{"key":31,"text":282,"correct":22},"需要将所有的工作包划分在相同的层次上",{"key":181,"text":284,"correct":26},"由一个母元素分解成的所有子元素应包括母元素中所涵盖的所有工作内容",{"id":286,"libraryId":5,"type":168,"typeLabel":169,"stem":287,"options":288,"answer":299,"analysis":33},953652,"项目结构分解并没有统一的模式，但应结合项目的特点和参考( )的原则进行。",[289,291,293,295,297],{"key":20,"text":290,"correct":26},"考虑项目的组成",{"key":24,"text":292,"correct":26},"有利于项目目标的控制",{"key":28,"text":294,"correct":22},"仅考虑项目进展的局部部署",{"key":31,"text":296,"correct":26},"结合项目管理的组织结构",{"key":181,"text":298,"correct":26},"有利于项目实施任务(设计、施工和物资采购)的发包和有利于项目实施任务的进行，并结合合同结构","ABDE",{"id":301,"libraryId":5,"type":168,"typeLabel":169,"stem":302,"options":303,"answer":243,"analysis":33},953653,"影响一个系统目标实现的主要因素除了组织因素以外，还有人的因素，其中人的因素包括( )。",[304,306,308,310,312],{"key":20,"text":305,"correct":22},"建设单位和所有参与单位的管理的方法与工具",{"key":24,"text":307,"correct":26},"该项目所有参与单位(设计、工程监理、施工、供货单位等)的生产人员的数量",{"key":28,"text":309,"correct":26},"该项目所有参与单位(设计、工程监理、施工、供货单位等)的生产人员的质量",{"key":31,"text":311,"correct":26},"建设单位和该项目所有参与单位(设计、工程监理、施工、供货单位等)的管理人员的数量",{"key":181,"text":313,"correct":26},"建设单位和该项目所有参与单位(设计、工程监理、施工、供货单位等)的管理人员的质量",{"id":315,"libraryId":5,"type":168,"typeLabel":169,"stem":316,"options":317,"answer":228,"analysis":33},953654,"WBS定义项目的所有工作内容，而且仅定义项目的工作内容，并澄清项目的范围。同时WBS也是其他项目管理过程的主要依据，如( )与信息管理等。",[318,320,322,323,324],{"key":20,"text":319,"correct":26},"投资控制",{"key":24,"text":321,"correct":26},"进度控制",{"key":28,"text":236,"correct":26},{"key":31,"text":225,"correct":26},{"key":181,"text":325,"correct":22},"安全管理",{"id":327,"libraryId":5,"type":168,"typeLabel":169,"stem":328,"options":329,"answer":198,"analysis":33},953655,"建设项目管理规划依据项目的特点，主要就( )方面进行分析和描述。",[330,332,334,336,338],{"key":20,"text":331,"correct":26},"项目管理需要做什么工作",{"key":24,"text":333,"correct":26},"怎样进行项目管理",{"key":28,"text":335,"correct":26},"谁做项目管理哪方面的工作",{"key":31,"text":337,"correct":22},"项目管理的安全目标分析",{"key":181,"text":339,"correct":26},"什么时候做哪些项目管理工作",{"id":341,"libraryId":5,"type":168,"typeLabel":169,"stem":342,"options":343,"answer":228,"analysis":33},953656,"建设项目管理规划内容涉及的范围和深度，在理论上和工程实践中并没有统一的规定，应视项目的特点而定，一般包括的内容有( )。",[344,346,348,350,352],{"key":20,"text":345,"correct":26},"进度控制的方法和手段",{"key":24,"text":347,"correct":26},"项目的目标分析和论证",{"key":28,"text":349,"correct":26},"风险管理的策略",{"key":31,"text":351,"correct":26},"安全、健康与环境管理的策略",{"key":181,"text":353,"correct":22},"技术路线和所有技术的分析",{"id":355,"libraryId":5,"type":168,"typeLabel":169,"stem":356,"options":357,"answer":198,"analysis":33},953657,"业主方在进行项目管理组织结构图设计时，需要考虑的主要因素包括( )。",[358,360,362,364,366],{"key":20,"text":359,"correct":26},"工程的规模和特点",{"key":24,"text":361,"correct":26},"业主方管理人员的人力资源的条件",{"key":28,"text":363,"correct":26},"项目结构、合同结构",{"key":31,"text":365,"correct":22},"工程施工方的运营方式",{"key":181,"text":367,"correct":26},"业主方管理的模式",{"id":369,"libraryId":5,"type":168,"typeLabel":169,"stem":370,"options":371,"answer":380,"analysis":33},953658,"组织论是一门非常重要的基础理论学科，是项目管理学的母学科，它主要研究系统的( )。",[372,374,376,378,379],{"key":20,"text":373,"correct":22},"项目结构图",{"key":24,"text":375,"correct":26},"组织结构模式",{"key":28,"text":377,"correct":26},"组织分工",{"key":31,"text":263,"correct":22},{"key":181,"text":197,"correct":26},"BCE",{"id":382,"libraryId":5,"type":168,"typeLabel":169,"stem":383,"options":384,"answer":395,"analysis":33},953659,"设计与施工的分离也导致了许多问题，主要有( )。",[385,387,389,391,393],{"key":20,"text":386,"correct":26},"建设单位的组织、协调工作量大",{"key":24,"text":388,"correct":22},"若施工图完成以后再进行施工任务的发包，项目建设周期短",{"key":28,"text":390,"correct":26},"建设单位项目目标的控制有困难，主要是不利于投资控制和进度控制",{"key":31,"text":392,"correct":26},"施工单位\"按图施工\"，基本上处于被动地位，在一定程度上影响了其积极性的发挥",{"key":181,"text":394,"correct":26},"设计单位较少了解施工，有时也较少考虑可施工性，会影响施工的有效进行","ACDE",{"id":397,"libraryId":5,"type":168,"typeLabel":169,"stem":398,"options":399,"answer":243,"analysis":33},953660,"招标代理咨询服务的业务范围可包括( )。",[400,402,404,406,408],{"key":20,"text":401,"correct":22},"工程竣工结算与决算",{"key":24,"text":403,"correct":26},"编制招标文件和资格预审文件",{"key":28,"text":405,"correct":26},"拟定招标方案",{"key":31,"text":407,"correct":26},"审查投标人资格、编制标底",{"key":181,"text":409,"correct":26},"组织合同谈判",{"id":411,"libraryId":5,"type":168,"typeLabel":169,"stem":412,"options":413,"answer":228,"analysis":33},953661,"项目管理单位在建设项目设计阶段，负责( )。",[414,416,418,420,422],{"key":20,"text":415,"correct":26},"编制各个设计阶段的设计要求文件",{"key":24,"text":417,"correct":26},"进行风险分析并制定管理策略",{"key":28,"text":419,"correct":26},"协助建设项目业主选择专利技术",{"key":31,"text":421,"correct":26},"审查专利商提供的工艺包设计文件",{"key":181,"text":423,"correct":22},"编制并发布工程施工应统一遵循的标准、规范和规定",{"id":425,"libraryId":5,"type":168,"typeLabel":169,"stem":426,"options":427,"answer":198,"analysis":33},953662,"与工程和货物的采购不同，管理咨询的委托的特点包括( )。",[428,430,432,434,436],{"key":20,"text":429,"correct":26},"管理咨询服务的产品通常是无形的",{"key":24,"text":431,"correct":26},"管理咨询服务的产品往往没有确定的技术规格",{"key":28,"text":433,"correct":26},"管理咨询服务的质量往往由咨询人员的技术和专门知识决定，因此管理咨询的委托需要更加重视投标人的能力和质量",{"key":31,"text":435,"correct":22},"管理咨询服务的价格往往由咨询人员的技术和专门知识决定，因此管理咨询的委托需要更加重视投标人的价格",{"key":181,"text":437,"correct":26},"有的咨询内容涉及某些特定知识或技术，因此，只能在一定范围内通过征求建议书，通过竞争性谈判等方式进行",{"id":439,"libraryId":5,"type":168,"typeLabel":169,"stem":440,"options":441,"answer":198,"analysis":33},953663,"业主方管理部门的信息管理任务包括( )。",[442,444,446,448,450],{"key":20,"text":443,"correct":26},"组织提交竣工资料",{"key":24,"text":445,"correct":26},"督促各施工单位整理工程技术资料",{"key":28,"text":447,"correct":26},"收集、整理、分类归档各种项目管理信息",{"key":31,"text":449,"correct":22},"组织设计竞赛和设计方案的评审",{"key":181,"text":451,"correct":26},"督促设计单位整理工程技术经济资料、档案",{"id":453,"libraryId":5,"type":168,"typeLabel":169,"stem":454,"options":455,"answer":243,"analysis":33},953664,"大型建设项目的EPC总承包商通常都是国际大型工程公司，其特点有( )。",[456,458,460,462,464],{"key":20,"text":457,"correct":22},"有较强的融资能力，经营项目由政府确定",{"key":24,"text":459,"correct":26},"采用国际先进的模式和先进手段对建设项目实行科学的管理",{"key":28,"text":461,"correct":26},"拥有专利技术，或与专利商有密切的合作关系，能反映当代世界先进技术水平",{"key":31,"text":463,"correct":26},"建设项目总承包和项目管理的功能齐全，组织管理机构科学、精干、高效",{"key":181,"text":465,"correct":26},"拥有人力、物力资源和丰富的工程经验，为工程提供全过程服务，能够高质量、高效率、低成本地完成项目的建设",{"id":467,"libraryId":5,"type":168,"typeLabel":169,"stem":468,"options":469,"answer":243,"analysis":33},953665,"PMC单位在项目招标投标阶段，代表或协助建设项目业主主要进行的工作包括( )。",[470,472,474,476,478],{"key":20,"text":471,"correct":22},"配合建设项目业主进行生产准备",{"key":24,"text":473,"correct":26},"对建设项目总承包单位(如有)、施工或供货单位进行资格预审",{"key":28,"text":475,"correct":26},"编制建设项目总承包单位(如有)、施工或供货招标文件",{"key":31,"text":477,"correct":26},"主持或参与招投标和评标组织工作",{"key":181,"text":479,"correct":26},"协助建设项目业主与建设项目总承包单位(如有)、施工或供货中标单位进行合同谈判与签约",{"id":481,"libraryId":5,"type":168,"typeLabel":169,"stem":482,"options":483,"answer":395,"analysis":33},953666,"关于有限责任公司的相关表述中，正确的有( )。",[484,486,488,490,492],{"key":20,"text":485,"correct":26},"1人有限责任公司不设股东会",{"key":24,"text":487,"correct":22},"监事会由全体股东组成，是公司的权力机构",{"key":28,"text":489,"correct":26},"可以设立1人有限责任公司",{"key":31,"text":491,"correct":26},"有限责任公司可以变更为股份有限公司",{"key":181,"text":493,"correct":26},"股东人数较少或者规模较小的有限责任公司，可以设1名执行董事，不设董事会",{"id":495,"libraryId":5,"type":168,"typeLabel":169,"stem":496,"options":497,"answer":299,"analysis":33},953667,"业主方管理部门采用跨度窄、层次多的组织结构的特点主要体现在( )。",[498,500,502,504,506],{"key":20,"text":499,"correct":26},"容易造成管理效率低",{"key":24,"text":501,"correct":26},"管理层次多，往往导致管理费用增多",{"key":28,"text":503,"correct":22},"管理负担重，有失控的危险",{"key":31,"text":505,"correct":26},"监督和控制严密，一般不会出现失控现象，但项目组织层次多，决策慢",{"key":181,"text":507,"correct":26},"高层管理部门与基层管理部门之间的距离过长，信息按照直线传达时容易发生遗漏和曲解",{"id":509,"libraryId":5,"type":168,"typeLabel":169,"stem":510,"options":511,"answer":395,"analysis":33},953668,"工程设计平行委托模式的主要特点包括( )。",[512,514,516,518,520],{"key":20,"text":513,"correct":26},"建设项目业主要负责对多个设计合同的跟踪管理，工作量较大",{"key":24,"text":515,"correct":22},"建设项目业主只需要组织一次设计招标，减轻工作量",{"key":28,"text":517,"correct":26},"不同的设计单位对业主的设计要求、准则和标准的理解和把握程度不同，容易造成设计不协调",{"key":31,"text":519,"correct":26},"建设项目业主要负责所有设计合同的招标、合同谈判、签约，招标及合同管理工作量大",{"key":181,"text":521,"correct":26},"建设项目业主要负责对所有设计单位的管理及各个设计单位之间的组织协调",{"id":523,"libraryId":5,"type":168,"typeLabel":169,"stem":524,"options":525,"answer":299,"analysis":33},953669,"工程造价咨询服务的业务范围可包括( )。",[526,528,530,532,534],{"key":20,"text":527,"correct":26},"工程造价审核",{"key":24,"text":529,"correct":26},"钢筋及预埋件计算",{"key":28,"text":531,"correct":22},"草拟合同",{"key":31,"text":533,"correct":26},"招标控制价编制",{"key":181,"text":535,"correct":26},"施工阶段全过程造价控制",{"id":537,"libraryId":5,"type":168,"typeLabel":169,"stem":538,"options":539,"answer":299,"analysis":33},953670,"业主方管理部门的组织与协调的任务包括( )。",[540,542,544,546,548],{"key":20,"text":541,"correct":26},"组织发放招标文件，组织投标答疑",{"key":24,"text":543,"correct":26},"组织各种评标会议",{"key":28,"text":545,"correct":22},"审核施工组织设计中有关质量控制的措施",{"key":31,"text":547,"correct":26},"向各政府主管部门办理各项审批事项",{"key":181,"text":549,"correct":26},"组织、协调参与工程建设各单位之间的关系",{"id":551,"libraryId":5,"type":168,"typeLabel":169,"stem":552,"options":553,"answer":564,"analysis":33},953671,"权益投资取得对项目(或企业)产权的( )。",[554,556,558,560,562],{"key":20,"text":555,"correct":22},"拍卖权",{"key":24,"text":557,"correct":26},"所有权",{"key":28,"text":559,"correct":22},"转让权",{"key":31,"text":561,"correct":26},"收益权",{"key":181,"text":563,"correct":26},"控制权","BDE",{"id":566,"libraryId":5,"type":168,"typeLabel":169,"stem":567,"options":568,"answer":243,"analysis":33},953672,"合作伙伴关系建立在信任、追求共同目标和理解各组织的期望和价值观的基础上，期望获取的利益包括( )。",[569,571,573,575,577],{"key":20,"text":570,"correct":22},"增加就业人数",{"key":24,"text":572,"correct":26},"降低成本",{"key":28,"text":574,"correct":26},"增加创新机遇",{"key":31,"text":576,"correct":26},"提高工作效率",{"key":181,"text":578,"correct":26},"不断提高产品质量和服务的质量",{"id":580,"libraryId":5,"type":168,"typeLabel":169,"stem":581,"options":582,"answer":198,"analysis":33},953673,"CM\u002F非代理型模式合同结构的特征主要包括( )。",[583,585,587,589,591],{"key":20,"text":584,"correct":26},"由于业主对工程费用不能直接控制，有很大风险",{"key":24,"text":586,"correct":26},"CM单位与设计单位之间没有合同关系",{"key":28,"text":588,"correct":26},"CM合同形式一般采用\"成本+利润\"方式",{"key":31,"text":590,"correct":22},"CM合同需要等施工图完成后才签订",{"key":181,"text":592,"correct":26},"CM单位对各分包商的资格预审、招标、议标以及签约，都必须经过业主的确认才有效",{"id":594,"libraryId":5,"type":168,"typeLabel":169,"stem":595,"options":596,"answer":243,"analysis":33},953674,"近年来建筑业发生了许多深刻的变化，主要体现在( )。",[597,599,601,603,605],{"key":20,"text":598,"correct":22},"大中型建设项目投资和经营的公有化进程的发展",{"key":24,"text":600,"correct":26},"建筑市场的全球化进程和建筑市场竞争的加剧",{"key":28,"text":602,"correct":26},"在设计、施工、建筑材料和建筑设备等技术领域不断创新",{"key":31,"text":604,"correct":26},"设计事务所(设计公司)、建筑公司和咨询公司内部管理的变化",{"key":181,"text":606,"correct":26},"借鉴机械制造业、汽车工业等行业，改变建筑产品生产组织的模式",{"id":608,"libraryId":5,"type":168,"typeLabel":169,"stem":609,"options":610,"answer":198,"analysis":33},953675,"根据建设项目的特点，项目总经理在董事会的授权范围内，具体负责的工作有( )。",[611,613,615,617,619],{"key":20,"text":612,"correct":26},"进行投资建设项目总结评价工作",{"key":24,"text":614,"correct":26},"参与投资机会研究",{"key":28,"text":616,"correct":26},"参与研究并提出投资建设项目融资方案",{"key":31,"text":618,"correct":22},"决定公司内部管理机构的设置",{"key":181,"text":620,"correct":26},"组织生产运营准备工作和制定相关员工培训方案",{"id":622,"libraryId":5,"type":168,"typeLabel":169,"stem":623,"options":624,"answer":183,"analysis":33},953676,"业主方管理部门的合同管理任务主要有( )。",[625,627,629,631,633],{"key":20,"text":626,"correct":26},"起草设计合同，参与设计合同的谈判、签订工作",{"key":24,"text":628,"correct":26},"根据项目的特点和管理目标，分析确定合同结构和发包模式",{"key":28,"text":630,"correct":22},"建立建设项目的信息编码体系及信息管理制度",{"key":31,"text":632,"correct":26},"分析可能发生索赔的原因，制定防范性对策，减少业主索赔事件的发生",{"key":181,"text":634,"correct":22},"编制施工总进度规划，并在招标文件中明确工期总目标",{"id":636,"libraryId":5,"type":168,"typeLabel":169,"stem":637,"options":638,"answer":395,"analysis":33},953677,"项目管理单位在建设项目施工阶段，负责( )。",[639,641,643,645,647],{"key":20,"text":640,"correct":26},"对承包商进行全面管理",{"key":24,"text":642,"correct":22},"对投标商进行资格预审",{"key":28,"text":644,"correct":26},"参加调试，组织装置性能考核、验收",{"key":31,"text":646,"correct":26},"向建设项目业主移交项目全部文件资料",{"key":181,"text":471,"correct":26},{"id":649,"libraryId":5,"type":168,"typeLabel":169,"stem":650,"options":651,"answer":243,"analysis":33},953678,"业主方管理部门采用跨度宽、层次少的组织结构的特点主要体现在( )。",[652,653,655,657,658],{"key":20,"text":499,"correct":22},{"key":24,"text":654,"correct":26},"管理跨度大，协调困难",{"key":28,"text":656,"correct":26},"应该对下级有较多的授权",{"key":31,"text":503,"correct":26},{"key":181,"text":659,"correct":26},"组织结构扁平化，结构层次少，组织灵活",{"id":661,"libraryId":5,"type":168,"typeLabel":169,"stem":662,"options":663,"answer":395,"analysis":33},953679,"业主之所以选择平行发包模式，往往是由于( )原因所决定的。",[664,666,668,670,672],{"key":20,"text":665,"correct":26},"业主有意将项目分解，以便尽可能多地照顾各种关系",{"key":24,"text":667,"correct":22},"建设项目业主只需要与一个设计总负责单位进行协调，有利于业主的组织与协调工作",{"key":28,"text":669,"correct":26},"业主有足够的经验和能力同时实施对多个施工单位的管理",{"key":31,"text":671,"correct":26},"工程进度要求紧迫，业主急于开工，无法等待全部施工图完成，边设计边施工",{"key":181,"text":673,"correct":26},"项目规模太大，选择一个单位进行施工总承包的风险太大，也没有一个单位有能力实行施工总承包",{"id":675,"libraryId":5,"type":168,"typeLabel":169,"stem":676,"options":677,"answer":688,"analysis":33},953680,"业主方委托项目管理与采用项目总控的组织模式是不同的，其相同点包括( )。",[678,680,682,684,686],{"key":20,"text":679,"correct":26},"工作属性相同",{"key":24,"text":681,"correct":26},"控制的目标相同",{"key":28,"text":683,"correct":22},"指令权相同",{"key":31,"text":685,"correct":22},"工作特点相同",{"key":181,"text":687,"correct":26},"控制的原理相同","ABE",{"id":690,"libraryId":5,"type":168,"typeLabel":169,"stem":691,"options":692,"answer":228,"analysis":33},953681,"业主方委托项目管理与采用项目总控的组织模式是不同的，其区别有( )。",[693,695,697,699,701],{"key":20,"text":694,"correct":26},"地位不同",{"key":24,"text":696,"correct":26},"指令权不同",{"key":28,"text":698,"correct":26},"具体工作不同",{"key":31,"text":700,"correct":26},"工作特点不同",{"key":181,"text":702,"correct":22},"工作属性不同",[704,707,710,713,716,719],{"id":15,"name":705,"category":7,"favorite":706},"领导干部任职前廉政法规知识测试题",92,{"id":708,"name":709,"category":7,"favorite":15},595,"建筑结构与设备",{"id":711,"name":712,"category":7,"favorite":15},715,"招标采购专业知识与法律法规",{"id":714,"name":715,"category":7,"favorite":15},848,"市政方向-通用基础",{"id":717,"name":718,"category":7,"favorite":8},534,"BIM工程师",{"id":720,"name":718,"category":7,"favorite":8},535]