[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-691-3":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":568},{"id":5,"name":6,"category":7,"favorite":8},691,"投资建设项目组织","建筑工程",0,3,50,349,[13,34,46,58,70,82,94,106,118,130,142,152,161,173,185,197,209,218,230,242,254,266,278,290,302,311,323,331,342,353,365,377,389,401,411,420,428,440,449,461,470,478,490,502,510,518,528,536,544,556],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":27,"analysis":33},953582,1,"单选题","对BIM应用的叙述中，有误的是( )。",[19,23,26,30],{"key":20,"text":21,"correct":22},"A","根本性提高建设行业的生产效率",false,{"key":24,"text":25,"correct":22},"B","BIM应用可以帮助建筑业的可持续发展",{"key":27,"text":28,"correct":29},"C","BIM的应用将促进工程项目建设向多元化方向发展",true,{"key":31,"text":32,"correct":22},"D","BIM实现的产品信息集成是建设项目集成化建设的基础","",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":24,"analysis":33},953583,"在进行项目信息分类时，按( )，即按项目的分解结构，如子项目1、子项目2等进行信息分类。",[38,40,42,44],{"key":20,"text":39,"correct":22},"按项目管理工作的任务",{"key":24,"text":41,"correct":29},"项目管理工作的对象",{"key":27,"text":43,"correct":22},"按信息的内容属性",{"key":31,"text":45,"correct":22},"按项目管理工作的过程",{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":27,"analysis":33},953584,"有关BIM的技术特征的表述，不正确的是( )。",[50,52,54,56],{"key":20,"text":51,"correct":22},"信息存储结构具有多元化特征",{"key":24,"text":53,"correct":22},"以参数化建模作为创建模型的核心技术",{"key":27,"text":55,"correct":29},"以专用数据交换标准作为系统间信息交换的基础",{"key":31,"text":57,"correct":22},"以联合数据库的分类模型作为模型系统的实现方法",{"id":59,"libraryId":5,"type":15,"typeLabel":16,"stem":60,"options":61,"answer":31,"analysis":33},953585,"建设项目周期长，生产工艺复杂，建筑材料种类多，建筑技术发展迅速，影响建设项目因素多种多样，工程建设阶段性强并且相互穿插，由此导致了建设项目文档资料的( )。",[62,64,66,68],{"key":20,"text":63,"correct":22},"继承性和时效性",{"key":24,"text":65,"correct":22},"随机性",{"key":27,"text":67,"correct":22},"多专业性和综合性",{"key":31,"text":69,"correct":29},"分散性和复杂性",{"id":71,"libraryId":5,"type":15,"typeLabel":16,"stem":72,"options":73,"answer":31,"analysis":33},953586,"关于档案管理各方的通用职责的叙述中，不正确的是( )。",[74,76,78,80],{"key":20,"text":75,"correct":22},"对工程档案进行涂改、伪造、随意抽撤或损毁、丢失等，应按有关规定予以处罚",{"key":24,"text":77,"correct":22},"工程各参建单位填写的工程档案应以工程合同、设计文件、工程质量验收标准、施工及验收规范等为依据",{"key":27,"text":79,"correct":22},"工程档案应随工程进度及时收集、整理，并应按专业归类，认真书写，字迹清楚，项目齐全、准确、真实，无未了事项",{"key":31,"text":81,"correct":29},"工程档案进行分级管理，各单位安全管理负责人负责本单位工程档案的全过程组织工作，工程档案的收集、整理和审核工作由各单位档案管理员负责",{"id":83,"libraryId":5,"type":15,"typeLabel":16,"stem":84,"options":85,"answer":31,"analysis":33},953587,"用来辅助决策和信息资源的利用价值可以因人、因事、因时、因地而异，这就体现出信息的( )。",[86,88,90,92],{"key":20,"text":87,"correct":22},"系统性",{"key":24,"text":89,"correct":22},"时效性",{"key":27,"text":91,"correct":22},"有序性",{"key":31,"text":93,"correct":29},"适用性",{"id":95,"libraryId":5,"type":15,"typeLabel":16,"stem":96,"options":97,"answer":20,"analysis":33},953588,"在项目总承包模式或CM模式条件下，因为( )介入设计或影响设计，其参与项目实施的时间范围不仅仅局限于施工阶段。",[98,100,102,104],{"key":20,"text":99,"correct":29},"承包商",{"key":24,"text":101,"correct":22},"建设单位",{"key":27,"text":103,"correct":22},"监理单位",{"key":31,"text":105,"correct":22},"设计单位",{"id":107,"libraryId":5,"type":15,"typeLabel":16,"stem":108,"options":109,"answer":27,"analysis":33},953589,"在技术设计和施工图设计阶段，建设项目投资的控制目标是( )。",[110,112,114,116],{"key":20,"text":111,"correct":22},"工程承包合同价格",{"key":24,"text":113,"correct":22},"施工图预算",{"key":27,"text":115,"correct":29},"设计概算",{"key":31,"text":117,"correct":22},"建设项目的投资估算",{"id":119,"libraryId":5,"type":15,"typeLabel":16,"stem":120,"options":121,"answer":27,"analysis":33},953590,"下列目标中，( )是项目实施过程中的总体约束目标，即投资目标、进度目标和质量目标。",[122,124,126,128],{"key":20,"text":123,"correct":22},"设计方项目管理目标",{"key":24,"text":125,"correct":22},"施工方项目管理目标",{"key":27,"text":127,"correct":29},"业主方项目管理目标",{"key":31,"text":129,"correct":22},"供货方项目管理目标",{"id":131,"libraryId":5,"type":15,"typeLabel":16,"stem":132,"options":133,"answer":27,"analysis":33},953591,"建设项目界面的类型中，( )是指系统或设备在连接处的设计要求、技术参数是否匹配。",[134,136,138,140],{"key":20,"text":135,"correct":22},"工程界面",{"key":24,"text":137,"correct":22},"动界面",{"key":27,"text":139,"correct":29},"技术界面",{"key":31,"text":141,"correct":22},"人员界面",{"id":143,"libraryId":5,"type":15,"typeLabel":16,"stem":144,"options":145,"answer":20,"analysis":33},953592,"能体现建设项目的实际投资的是( )。",[146,148,149,151],{"key":20,"text":147,"correct":29},"竣工决算",{"key":24,"text":115,"correct":22},{"key":27,"text":150,"correct":22},"投资估算",{"key":31,"text":113,"correct":22},{"id":153,"libraryId":5,"type":15,"typeLabel":16,"stem":154,"options":155,"answer":20,"analysis":33},953593,"建设项目界面的类型中，( )指建设项目在决策和实施过程中之间有相互依存关系的界面，它是由于建设项目发展过程中产生的活动的相互依存模式的作用引起的。",[156,157,159,160],{"key":20,"text":137,"correct":29},{"key":24,"text":158,"correct":22},"静界面",{"key":27,"text":135,"correct":22},{"key":31,"text":139,"correct":22},{"id":162,"libraryId":5,"type":15,"typeLabel":16,"stem":163,"options":164,"answer":20,"analysis":33},953594,"采取调整进度管理的方法和手段，改变施工管理和强化合同管理等措施属于目标控制纠偏措施中的( )。",[165,167,169,171],{"key":20,"text":166,"correct":29},"管理措施",{"key":24,"text":168,"correct":22},"组织措施",{"key":27,"text":170,"correct":22},"技术措施",{"key":31,"text":172,"correct":22},"经济措施",{"id":174,"libraryId":5,"type":15,"typeLabel":16,"stem":175,"options":176,"answer":20,"analysis":33},953595,"界面管理的主要含义就是( )。",[177,179,181,183],{"key":20,"text":178,"correct":29},"联结、整合、一体化",{"key":24,"text":180,"correct":22},"联结、整合、效益",{"key":27,"text":182,"correct":22},"效益、整合、一体化",{"key":31,"text":184,"correct":22},"联结、整合、智能化",{"id":186,"libraryId":5,"type":15,"typeLabel":16,"stem":187,"options":188,"answer":31,"analysis":33},953596,"建设产品的( )的特点，决定了建设项目的价值工程活动具有高效性，节约的潜力大，开展价值工程活动的效益高。",[189,191,193,195],{"key":20,"text":190,"correct":22},"多样性",{"key":24,"text":192,"correct":22},"使用寿命长",{"key":27,"text":194,"correct":22},"建设周期长",{"key":31,"text":196,"correct":29},"投资巨大、价值高昂",{"id":198,"libraryId":5,"type":15,"typeLabel":16,"stem":199,"options":200,"answer":27,"analysis":33},953597,"进行横向界面的管理时，为了最大限度地减少或消除横向联系中的摩擦损耗，应该采取( )的方式进行界面控制。",[201,203,205,207],{"key":20,"text":202,"correct":22},"充分沟通",{"key":24,"text":204,"correct":22},"充实等级",{"key":27,"text":206,"correct":29},"跨职能整合",{"key":31,"text":208,"correct":22},"建立完善的管理协调机制",{"id":210,"libraryId":5,"type":15,"typeLabel":16,"stem":211,"options":212,"answer":24,"analysis":33},953598,"由建设程序反映出的子系统之间的界面，一般都属于( )它的管理极为重要。",[213,214,215,216],{"key":20,"text":139,"correct":22},{"key":24,"text":137,"correct":29},{"key":27,"text":135,"correct":22},{"key":31,"text":217,"correct":22},"组织界面",{"id":219,"libraryId":5,"type":15,"typeLabel":16,"stem":220,"options":221,"answer":24,"analysis":33},953599,"在建设项目实施期的专业管理是( )。",[222,224,226,228],{"key":20,"text":223,"correct":22},"设施管理",{"key":24,"text":225,"correct":29},"项目管理",{"key":27,"text":227,"correct":22},"开发管理",{"key":31,"text":229,"correct":22},"运营管理",{"id":231,"libraryId":5,"type":15,"typeLabel":16,"stem":232,"options":233,"answer":27,"analysis":33},953600,"一般，我们把大型建设项目的静界面又分为( )。",[234,236,238,240],{"key":20,"text":235,"correct":22},"技术界面和动界面",{"key":24,"text":237,"correct":22},"动界面和组织界面",{"key":27,"text":239,"correct":29},"技术界面和工程界面",{"key":31,"text":241,"correct":22},"工程界面和人员界面",{"id":243,"libraryId":5,"type":15,"typeLabel":16,"stem":244,"options":245,"answer":27,"analysis":33},953601,"判断有无投资偏差的基础是( )。",[246,248,250,252],{"key":20,"text":247,"correct":22},"各类投资控制报告和报表的制定",{"key":24,"text":249,"correct":22},"投资目标计划值与实际值的比较",{"key":27,"text":251,"correct":29},"项目投资实际数据的及时、完整和正确",{"key":31,"text":253,"correct":22},"项目投资偏差纠正措施的采取",{"id":255,"libraryId":5,"type":15,"typeLabel":16,"stem":256,"options":257,"answer":27,"analysis":33},953602,"下列各方的项目管理目标中，只有( )项目管理的目标是针对整个项目、针对项目实施全过程的。",[258,260,262,264],{"key":20,"text":259,"correct":22},"供货方",{"key":24,"text":261,"correct":22},"设计方",{"key":27,"text":263,"correct":29},"业主方",{"key":31,"text":265,"correct":22},"施工方",{"id":267,"libraryId":5,"type":15,"typeLabel":16,"stem":268,"options":269,"answer":24,"analysis":33},953603,"主要在项目实施阶段和投产竣工阶段进行的工作是( )。",[270,272,274,276],{"key":20,"text":271,"correct":22},"设计方的项目管理",{"key":24,"text":273,"correct":29},"施工方的项目管理",{"key":27,"text":275,"correct":22},"供货方的项目管理、",{"key":31,"text":277,"correct":22},"业主方的项目管理",{"id":279,"libraryId":5,"type":15,"typeLabel":16,"stem":280,"options":281,"answer":20,"analysis":33},953604,"由于项目的( )特点，项目组织内的人员界面既包括属于原组织的人员界面，又包括原属于不同组织的人员界面。",[282,284,286,288],{"key":20,"text":283,"correct":29},"临时性",{"key":24,"text":285,"correct":22},"固定性",{"key":27,"text":287,"correct":22},"持久性",{"key":31,"text":289,"correct":22},"唯一性",{"id":291,"libraryId":5,"type":15,"typeLabel":16,"stem":292,"options":293,"answer":27,"analysis":33},953605,"系统界面中，子系统界面按照子系统之间的相互关系，又可以划分为( )。",[294,296,298,300],{"key":20,"text":295,"correct":22},"动界面和人员界面",{"key":24,"text":297,"correct":22},"静界面和组织界面",{"key":27,"text":299,"correct":29},"静界面和动界面",{"key":31,"text":301,"correct":22},"人员界面和组织界面",{"id":303,"libraryId":5,"type":15,"typeLabel":16,"stem":304,"options":305,"answer":24,"analysis":33},953606,"建设项目界面的类型中，( )是建设项目中最为复杂的界面类型，因为它们不但涉及人，而且因组织目标和处理矛盾的风格不同。",[306,307,308,310],{"key":20,"text":141,"correct":22},{"key":24,"text":217,"correct":29},{"key":27,"text":309,"correct":22},"系统界面",{"key":31,"text":158,"correct":22},{"id":312,"libraryId":5,"type":15,"typeLabel":16,"stem":313,"options":314,"answer":20,"analysis":33},953607,"在项目决策阶段，项目投资控制的主要任务是( )。",[315,317,319,321],{"key":20,"text":316,"correct":29},"根据拟建项目的功能要求和使用要求，做出项目定义，包括项目投资定义",{"key":24,"text":318,"correct":22},"全面汇集在工程建设过程中实际花费的全部费用，编制竣工决算",{"key":27,"text":320,"correct":22},"应以被批准的设计概算为控制目标，应用限额设计、价值工程等方法，以设计概算控制施工图设计工作的进行",{"key":31,"text":322,"correct":22},"运用设计标准与标准设计、价值工程方法、限额设计方法等，以可行性研究报告中被批准的投资估算为投资控制计划值，对初步设计工作进行控制",{"id":324,"libraryId":5,"type":15,"typeLabel":16,"stem":325,"options":326,"answer":24,"analysis":33},953608,"采取调整设计、改进施工方法和改变施工机具等措施属于目标控制纠偏措施中的( )。",[327,328,329,330],{"key":20,"text":168,"correct":22},{"key":24,"text":170,"correct":29},{"key":27,"text":172,"correct":22},{"key":31,"text":166,"correct":22},{"id":332,"libraryId":5,"type":15,"typeLabel":16,"stem":333,"options":334,"answer":20,"analysis":33},953609,"在建设项目价值工程活动的研究后阶段，主要任务是形成价值工程研究报告，包括所有提案的详细介绍和概括介绍，然后提交( )审核。",[335,337,339,341],{"key":20,"text":336,"correct":29},"业主",{"key":24,"text":338,"correct":22},"监理工程师",{"key":27,"text":340,"correct":22},"承包单位",{"key":31,"text":105,"correct":22},{"id":343,"libraryId":5,"type":15,"typeLabel":16,"stem":344,"options":345,"answer":24,"analysis":33},953610,"在施工总承包模式条件下，施工阶段，通常是由( )组织进行价值工程活动。",[346,348,350,351],{"key":20,"text":347,"correct":22},"发包单位",{"key":24,"text":349,"correct":29},"施工总承包单位",{"key":27,"text":105,"correct":22},{"key":31,"text":352,"correct":22},"业主或项目管理公司",{"id":354,"libraryId":5,"type":15,"typeLabel":16,"stem":355,"options":356,"answer":31,"analysis":33},953611,"在许多建设项目中，建设项目流程中的各种专业化任务本身并不复杂，决定工作质量、项目及其最终产品的关键在于( )。",[357,359,361,363],{"key":20,"text":358,"correct":22},"各种工作的目标差异",{"key":24,"text":360,"correct":22},"文化冲突",{"key":27,"text":362,"correct":22},"信息传输通道受阻",{"key":31,"text":364,"correct":29},"各种专业工作之间的协调与整合",{"id":366,"libraryId":5,"type":15,"typeLabel":16,"stem":367,"options":368,"answer":31,"analysis":33},953612,"在特大型项目或特别复杂的项目中，可能多请一些人参加也是很有好处或很必要的。有时候，价值工程小组的规模不得不超过( )人，在这种情况下，可以采用分组活动的办法。",[369,371,373,375],{"key":20,"text":370,"correct":22},"6",{"key":24,"text":372,"correct":22},"8",{"key":27,"text":374,"correct":22},"10",{"key":31,"text":376,"correct":29},"12",{"id":378,"libraryId":5,"type":15,"typeLabel":16,"stem":379,"options":380,"answer":31,"analysis":33},953613,"建设项目的使用寿命长，通常在( )年以上。",[381,383,385,387],{"key":20,"text":382,"correct":22},"35",{"key":24,"text":384,"correct":22},"40",{"key":27,"text":386,"correct":22},"45",{"key":31,"text":388,"correct":29},"50",{"id":390,"libraryId":5,"type":15,"typeLabel":16,"stem":391,"options":392,"answer":31,"analysis":33},953614,"工程施工阶段投资控制的目标值是( )。",[393,395,397,399],{"key":20,"text":394,"correct":22},"施工图预算或投资估算",{"key":24,"text":396,"correct":22},"设计概算或建设项目的投资估算",{"key":27,"text":398,"correct":22},"施工图预算或设计概算",{"key":31,"text":400,"correct":29},"施工图预算或工程承包合同价格",{"id":402,"libraryId":5,"type":15,"typeLabel":16,"stem":403,"options":404,"answer":24,"analysis":33},953615,"建设产品具有建设周期长的特点，以及项目建设具有( )的特点，决定了建设项目价值工程研究不仅要注重提高产品的质量和功能，降低成本，而且要注重缩短建设周期，降低劳动生产强度，提高劳动生产率，注重提高建设项目的可施工性。",[405,406,408,410],{"key":20,"text":190,"correct":22},{"key":24,"text":407,"correct":29},"劳动密集型",{"key":27,"text":409,"correct":22},"单件性",{"key":31,"text":196,"correct":22},{"id":412,"libraryId":5,"type":15,"typeLabel":16,"stem":413,"options":414,"answer":20,"analysis":33},953616,"建设产品的( )的特点，决定了建设项目应用价值工程具有普遍性的特点。",[415,416,418,419],{"key":20,"text":190,"correct":29},{"key":24,"text":417,"correct":22},"特殊性",{"key":27,"text":409,"correct":22},{"key":31,"text":192,"correct":22},{"id":421,"libraryId":5,"type":15,"typeLabel":16,"stem":422,"options":423,"answer":31,"analysis":33},953617,"建设产品具有的( )的特点，决定了建设项目中开展价值工程应注重测算全寿命周期费用的特点。",[424,425,426,427],{"key":20,"text":194,"correct":22},{"key":24,"text":190,"correct":22},{"key":27,"text":409,"correct":22},{"key":31,"text":192,"correct":29},{"id":429,"libraryId":5,"type":15,"typeLabel":16,"stem":430,"options":431,"answer":20,"analysis":33},953618,"业主方项目管理目标中，( )指的是项目的总投资目标。",[432,434,436,438],{"key":20,"text":433,"correct":29},"投资目标",{"key":24,"text":435,"correct":22},"质量目标",{"key":27,"text":437,"correct":22},"进度目标",{"key":31,"text":439,"correct":22},"安全目标",{"id":441,"libraryId":5,"type":15,"typeLabel":16,"stem":442,"options":443,"answer":24,"analysis":33},953619,"建设产品生产的( )特点，决定了建设项目应用价值工程具有一次性的特点。",[444,445,446,447],{"key":20,"text":190,"correct":22},{"key":24,"text":409,"correct":29},{"key":27,"text":87,"correct":22},{"key":31,"text":448,"correct":22},"独特性",{"id":450,"libraryId":5,"type":15,"typeLabel":16,"stem":451,"options":452,"answer":31,"analysis":33},953620,"在价值工程研究活动中，最重要的阶段是( )。",[453,455,457,459],{"key":20,"text":454,"correct":22},"收集信息与功能分析",{"key":24,"text":456,"correct":22},"研究前的准备",{"key":27,"text":458,"correct":22},"方案创造与评价",{"key":31,"text":460,"correct":29},"方案发展与提案形成",{"id":462,"libraryId":5,"type":15,"typeLabel":16,"stem":463,"options":464,"answer":20,"analysis":33},953621,"可能从项目实施准备阶段开始，一直延伸到项目实施阶段和投产竣工阶段的工作是( )。",[465,467,468,469],{"key":20,"text":466,"correct":29},"供货方的项目管理",{"key":24,"text":271,"correct":22},{"key":27,"text":273,"correct":22},{"key":31,"text":277,"correct":22},{"id":471,"libraryId":5,"type":15,"typeLabel":16,"stem":472,"options":473,"answer":24,"analysis":33},953622,"体现建设项目的总投资控制指标的是( )。",[474,475,476,477],{"key":20,"text":115,"correct":22},{"key":24,"text":150,"correct":29},{"key":27,"text":147,"correct":22},{"key":31,"text":113,"correct":22},{"id":479,"libraryId":5,"type":15,"typeLabel":16,"stem":480,"options":481,"answer":27,"analysis":33},953623,"关于价值工程的相关叙述中，不正确的是( )。",[482,484,486,488],{"key":20,"text":483,"correct":22},"价值工程又称为价值分析",{"key":24,"text":485,"correct":22},"价值的高低可以用价值指数(V)来反映",{"key":27,"text":487,"correct":29},"价值指数(V)的表达公式为V=C\u002FF",{"key":31,"text":489,"correct":22},"价值工程是以最低的寿命周期费用，可靠地实现必要的功能，着重于产品或作业的功能分析的有组织的活动",{"id":491,"libraryId":5,"type":15,"typeLabel":16,"stem":492,"options":493,"answer":31,"analysis":33},953624,"在实际工作中，通常以质量目标为中心，如果投资目标和进度目标与质量目标发生矛盾时，应服从质量目标，特别是对保证项目使用和安全有影响的技术要求，应保证( )满足。",[494,496,498,500],{"key":20,"text":495,"correct":22},"达到90%以上",{"key":24,"text":497,"correct":22},"达到95%以上",{"key":27,"text":499,"correct":22},"达到98%以上",{"key":31,"text":501,"correct":29},"100%",{"id":503,"libraryId":5,"type":15,"typeLabel":16,"stem":504,"options":505,"answer":31,"analysis":33},953625,"整个建设项目的管理核心是( )。",[506,507,508,509],{"key":20,"text":271,"correct":22},{"key":24,"text":466,"correct":22},{"key":27,"text":273,"correct":22},{"key":31,"text":277,"correct":29},{"id":511,"libraryId":5,"type":15,"typeLabel":16,"stem":512,"options":513,"answer":20,"analysis":33},953626,"建设项目界面的类型中，( )是指各承包商或各专业之间，以及设计、土建、安装、调试之间，在空间上是否相容、时间(进度)上是否衔接。",[514,515,516,517],{"key":20,"text":135,"correct":29},{"key":24,"text":139,"correct":22},{"key":27,"text":217,"correct":22},{"key":31,"text":137,"correct":22},{"id":519,"libraryId":5,"type":15,"typeLabel":16,"stem":520,"options":521,"answer":24,"analysis":33},953627,"建设项目价值工程活动中，采用功能成本化评价首先要( )。 A:评价功能 (F)的评价值 B:计算功能 (F)的成本",[522,524,526],{"key":20,"text":523,"correct":22},"计算功能指数",{"key":24,"text":525,"correct":29},"和成本指数",{"key":27,"text":527,"correct":22},"判断或选择价值工程研究的重点方向",{"id":529,"libraryId":5,"type":15,"typeLabel":16,"stem":530,"options":531,"answer":27,"analysis":33},953628,"采取调整项目组织结构、任务分工、管理职能分工、工作流程组织和项目管理班子人员等措施属于目标控制纠偏措施中的( )。",[532,533,534,535],{"key":20,"text":166,"correct":22},{"key":24,"text":170,"correct":22},{"key":27,"text":168,"correct":29},{"key":31,"text":172,"correct":22},{"id":537,"libraryId":5,"type":15,"typeLabel":16,"stem":538,"options":539,"answer":20,"analysis":33},953629,"建设项目投资控制目标的设置应是随着工程项目建设实践的不断深入而分阶段设置，在方案设计和初步设计阶段的投资控制目标是( )。",[540,541,542,543],{"key":20,"text":117,"correct":29},{"key":24,"text":115,"correct":22},{"key":27,"text":113,"correct":22},{"key":31,"text":111,"correct":22},{"id":545,"libraryId":5,"type":15,"typeLabel":16,"stem":546,"options":547,"answer":20,"analysis":33},953630,"在价值工程研究活动中，( )技术方面专家的作用更加重要，对每个建议都应该深入研究，努力转化成推荐方案，应该有计算数据的支持，有方案图，有关于费用估算的说明以及其他方面的解释。",[548,550,552,554],{"key":20,"text":549,"correct":29},"方案发展阶段",{"key":24,"text":551,"correct":22},"方案创造阶段",{"key":27,"text":553,"correct":22},"方案评价阶段",{"key":31,"text":555,"correct":22},"收集信息与功能分析阶段",{"id":557,"libraryId":5,"type":15,"typeLabel":16,"stem":558,"options":559,"answer":24,"analysis":33},953631,"在价值工程研究活动中，( )的目标是将上一阶段筛选出来的建议和设想进一步细化，形成可操作的提案。",[560,562,564,566],{"key":20,"text":561,"correct":22},"功能分析",{"key":24,"text":563,"correct":29},"方案发展",{"key":27,"text":565,"correct":22},"方案创造",{"key":31,"text":567,"correct":22},"信息收集",[569,572,575,578,581,584],{"id":15,"name":570,"category":7,"favorite":571},"领导干部任职前廉政法规知识测试题",92,{"id":573,"name":574,"category":7,"favorite":15},595,"建筑结构与设备",{"id":576,"name":577,"category":7,"favorite":15},715,"招标采购专业知识与法律法规",{"id":579,"name":580,"category":7,"favorite":15},848,"市政方向-通用基础",{"id":582,"name":583,"category":7,"favorite":8},534,"BIM工程师",{"id":585,"name":583,"category":7,"favorite":8},535]