[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-691-1":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":566},{"id":5,"name":6,"category":7,"favorite":8},691,"投资建设项目组织","建筑工程",0,1,50,349,[13,33,42,54,66,75,84,96,104,116,124,136,145,157,169,177,189,201,213,225,237,249,261,273,285,294,306,318,330,342,354,366,377,385,397,405,417,427,439,451,463,475,483,491,503,514,525,534,546,554],{"id":14,"libraryId":5,"type":9,"typeLabel":15,"stem":16,"options":17,"answer":26,"analysis":32},953482,"单选题","下列组织结构类型中，来自于十分严谨的军事组织系统的是( )。",[18,22,25,29],{"key":19,"text":20,"correct":21},"A","职能组织结构",false,{"key":23,"text":24,"correct":21},"B","矩阵组织结构",{"key":26,"text":27,"correct":28},"C","线性组织结构",true,{"key":30,"text":31,"correct":21},"D","寡头组织结构","",{"id":34,"libraryId":5,"type":9,"typeLabel":15,"stem":35,"options":36,"answer":30,"analysis":32},953483,"下列不属于项目管理的组织理论中，组织结构模式的是( )。",[37,38,39,40],{"key":19,"text":20,"correct":21},{"key":23,"text":27,"correct":21},{"key":26,"text":24,"correct":21},{"key":30,"text":41,"correct":28},"伞状组织结构",{"id":43,"libraryId":5,"type":9,"typeLabel":15,"stem":44,"options":45,"answer":23,"analysis":32},953484,"反映一个组织系统中各组成部门(组成元素)之间的组织关系(指令关系)的是( )。",[46,48,50,52],{"key":19,"text":47,"correct":21},"项目结构图",{"key":23,"text":49,"correct":28},"组织结构图",{"key":26,"text":51,"correct":21},"合同结构图",{"key":30,"text":53,"correct":21},"管理结构图",{"id":55,"libraryId":5,"type":9,"typeLabel":15,"stem":56,"options":57,"answer":23,"analysis":32},953485,"业主方项目管理最核心的问题是其( )，在进行项目管理组织结构图设计时，需要考虑多方面的因素。",[58,60,62,64],{"key":19,"text":59,"correct":21},"合同结构",{"key":23,"text":61,"correct":28},"组织结构",{"key":26,"text":63,"correct":21},"项目结构",{"key":30,"text":65,"correct":21},"管理结构",{"id":67,"libraryId":5,"type":9,"typeLabel":15,"stem":68,"options":69,"answer":19,"analysis":32},953486,"在( )中，最高指挥者(部门)下设纵向和横向两种不同类型的工作部门。",[70,71,72,73],{"key":19,"text":24,"correct":28},{"key":23,"text":27,"correct":21},{"key":26,"text":20,"correct":21},{"key":30,"text":74,"correct":21},"平行组织结构",{"id":76,"libraryId":5,"type":9,"typeLabel":15,"stem":77,"options":78,"answer":19,"analysis":32},953487,"反映一个建设项目参与单位之间的合同关系的是( )。",[79,80,81,82],{"key":19,"text":51,"correct":28},{"key":23,"text":49,"correct":21},{"key":26,"text":47,"correct":21},{"key":30,"text":83,"correct":21},"职能组织结构图",{"id":85,"libraryId":5,"type":9,"typeLabel":15,"stem":86,"options":87,"answer":26,"analysis":32},953488,"对项目结构编码的相关表述中，不正确的是( )。",[88,90,92,94],{"key":19,"text":89,"correct":21},"编码由一系列符号(如文字)和数字组成",{"key":23,"text":91,"correct":21},"编码工作是信息处理的一项重要的基础工作",{"key":26,"text":93,"correct":28},"项目的结构编码依据合同结构图，对项目结构的每一层的每一个组成部分进行编",{"key":30,"text":95,"correct":21},"一个建设工程项目有不同类型和不同用途的信息，为了有组织地存储信息、方便信息的检索和信息的加工整理，必须对项目的信息进行编码",{"id":97,"libraryId":5,"type":9,"typeLabel":15,"stem":98,"options":99,"answer":19,"analysis":32},953489,"在( )中，每一个工作部门只能对其直接的下属部门下达工作指令，每一个工作部门也只有一个直接的上级部门，因此，每一个工作部门只有唯一个指令源，避免了由于矛盾的指令而影响组织系统的运行。",[100,101,102,103],{"key":19,"text":27,"correct":28},{"key":23,"text":20,"correct":21},{"key":26,"text":74,"correct":21},{"key":30,"text":24,"correct":21},{"id":105,"libraryId":5,"type":9,"typeLabel":15,"stem":106,"options":107,"answer":30,"analysis":32},953490,"关于组织结构模式与工作流程组织的相关叙述中，不正确的是( )。",[108,110,112,114],{"key":19,"text":109,"correct":21},"组织结构模式和组织分工都是一种相对静态的组织关系",{"key":23,"text":111,"correct":21},"工作流程组织则反映一个组织系统中各项工作之间的逻辑关系，是一种动态关系",{"key":26,"text":113,"correct":21},"组织分工反映了一个组织系统中各子系统或各元素的工作任务分工和管理职能分工",{"key":30,"text":115,"correct":28},"组织结构模式反映了一个组织系统中各子系统之间或各元素(各工作部门)之间的平行关系",{"id":117,"libraryId":5,"type":9,"typeLabel":15,"stem":118,"options":119,"answer":26,"analysis":32},953491,"下列结构图中，( )对一个项目的结构进行逐层分解，以反映组成该项目的所有工作任务。",[120,121,122,123],{"key":19,"text":53,"correct":21},{"key":23,"text":51,"correct":21},{"key":26,"text":47,"correct":28},{"key":30,"text":49,"correct":21},{"id":125,"libraryId":5,"type":9,"typeLabel":15,"stem":126,"options":127,"answer":30,"analysis":32},953492,"合同结构图中，矩形框连接用( )表示。",[128,130,132,134],{"key":19,"text":129,"correct":21},"曲线",{"key":23,"text":131,"correct":21},"单项箭线",{"key":26,"text":133,"correct":21},"直线",{"key":30,"text":135,"correct":28},"双向箭线",{"id":137,"libraryId":5,"type":9,"typeLabel":15,"stem":138,"options":139,"answer":23,"analysis":32},953493,"项目结构图中，矩形框连接用( )表示。",[140,142,143,144],{"key":19,"text":141,"correct":21},"虚线",{"key":23,"text":133,"correct":28},{"key":26,"text":131,"correct":21},{"key":30,"text":135,"correct":21},{"id":146,"libraryId":5,"type":9,"typeLabel":15,"stem":147,"options":148,"answer":30,"analysis":32},953494,"组织结构图中，矩形框的含义是( )。",[149,151,153,155],{"key":19,"text":150,"correct":21},"一个合同中的利益双方",{"key":23,"text":152,"correct":21},"一个项目的组成部分",{"key":26,"text":154,"correct":21},"一个建设项目的参与单位",{"key":30,"text":156,"correct":28},"一个组织系统中的组成部分(工作部门)",{"id":158,"libraryId":5,"type":9,"typeLabel":15,"stem":159,"options":160,"answer":30,"analysis":32},953495,"物质流程组织的内容不包括( )。",[161,163,165,167],{"key":19,"text":162,"correct":21},"弱电工程物资采购工作流程",{"key":23,"text":164,"correct":21},"钢结构深化设计工作流程",{"key":26,"text":166,"correct":21},"外立面施工工作流程",{"key":30,"text":168,"correct":28},"与生成月度进度报告有关的数据处理流程",{"id":170,"libraryId":5,"type":9,"typeLabel":15,"stem":171,"options":172,"answer":23,"analysis":32},953496,"在上海地铁和广州地铁一号线建设时都采用了( )模式。",[173,174,175,176],{"key":19,"text":20,"correct":21},{"key":23,"text":24,"correct":28},{"key":26,"text":27,"correct":21},{"key":30,"text":74,"correct":21},{"id":178,"libraryId":5,"type":9,"typeLabel":15,"stem":179,"options":180,"answer":19,"analysis":32},953497,"项目管理的( )是项目管理的目标能否实现的决定性因素。",[181,183,185,187],{"key":19,"text":182,"correct":28},"组织",{"key":23,"text":184,"correct":21},"领导",{"key":26,"text":186,"correct":21},"控制",{"key":30,"text":188,"correct":21},"计划",{"id":190,"libraryId":5,"type":9,"typeLabel":15,"stem":191,"options":192,"answer":19,"analysis":32},953498,"对合作伙伴模式的争议处理系统特点的表述中，不正确的是( )。",[193,195,197,199],{"key":19,"text":194,"correct":28},"采用诉讼纠纷解决程序方法处理争议",{"key":23,"text":196,"correct":21},"每一步的解决措施都有明确的管理层负责",{"key":26,"text":198,"correct":21},"解决方法由简单到复杂逐步升级，并尽可能采用最小的成本解决问题",{"key":30,"text":200,"correct":21},"争议处理过程中的每一步骤都有明确的时间概念，保证争议解决的时效性",{"id":202,"libraryId":5,"type":9,"typeLabel":15,"stem":203,"options":204,"answer":23,"analysis":32},953499,"下列权益投资的方式中，( )是建设项目的投资人为实现共同目标、以合作协议方式结合在一起的。",[205,207,209,211],{"key":19,"text":206,"correct":21},"股权式合资结构",{"key":23,"text":208,"correct":28},"契约式合资结构",{"key":26,"text":210,"correct":21},"集团式合资结构",{"key":30,"text":212,"correct":21},"合伙制结构",{"id":214,"libraryId":5,"type":9,"typeLabel":15,"stem":215,"options":216,"answer":30,"analysis":32},953500,"股份有限公司的权力机构是( )。",[217,219,221,223],{"key":19,"text":218,"correct":21},"监事会",{"key":23,"text":220,"correct":21},"理事会",{"key":26,"text":222,"correct":21},"董事会",{"key":30,"text":224,"correct":28},"股东大会",{"id":226,"libraryId":5,"type":9,"typeLabel":15,"stem":227,"options":228,"answer":23,"analysis":32},953501,"建设项目投资者以资本金的形式投入的资金称为( )。",[229,231,233,235],{"key":19,"text":230,"correct":21},"项目资本金",{"key":23,"text":232,"correct":28},"股份",{"key":26,"text":234,"correct":21},"权益投资",{"key":30,"text":236,"correct":21},"占有投资",{"id":238,"libraryId":5,"type":9,"typeLabel":15,"stem":239,"options":240,"answer":23,"analysis":32},953502,"对权益投资的合伙制结构的相关叙述中，不正确的是( )。",[241,243,245,247],{"key":19,"text":242,"correct":21},"合伙制结构有两种基本形式：一般合伙制和有限合伙制",{"key":23,"text":244,"correct":28},"在有限合伙制下，合伙人中至少有2个一般合伙人和2个有限合伙人",{"key":26,"text":246,"correct":21},"在一般合伙制下，每一个合伙人对于合伙机构的债务及其他经济责任和民事责任均承担无限连带责任",{"key":30,"text":248,"correct":21},"合伙制结构是两个或两个以上合伙人共同从事某项投资活动而建立起来的一种法律关系",{"id":250,"libraryId":5,"type":9,"typeLabel":15,"stem":251,"options":252,"answer":26,"analysis":32},953503,"对施工总承包管理模式特点的叙述中，不正确的是( )。",[253,255,257,259],{"key":19,"text":254,"correct":21},"多数情况下，由业主方与分包人直接签约，加大了业主方的风险",{"key":23,"text":256,"correct":21},"施工总承包管理的招标不依赖于施工图设计，可以提前",{"key":26,"text":258,"correct":28},"对分包人的质量控制由分包管理单位进行",{"key":30,"text":260,"correct":21},"由施工总承包管理单位负责对所有分包人的管理及组织协调，大大减轻了业主的工作",{"id":262,"libraryId":5,"type":9,"typeLabel":15,"stem":263,"options":264,"answer":26,"analysis":32},953504,"针对传统承发包模式的弱点，通过多年的理论研究和实践总结，在建筑市场中出现了一种新的承发包模式是( )。 A:项目管理承包(PM",[265,267,269,271],{"key":19,"text":266,"correct":21},"模式",{"key":23,"text":268,"correct":21},"项目总控模式",{"key":26,"text":270,"correct":28},"CM模式",{"key":30,"text":272,"correct":21},"合作伙伴模式",{"id":274,"libraryId":5,"type":9,"typeLabel":15,"stem":275,"options":276,"answer":26,"analysis":32},953505,"采用施工平行发包模式，通常在该部分工程的施工图完成后才进行发包，有利于采用( )形式。",[277,279,281,283],{"key":19,"text":278,"correct":21},"单价合同",{"key":23,"text":280,"correct":21},"成本加酬金合同",{"key":26,"text":282,"correct":28},"总价合同",{"key":30,"text":284,"correct":21},"成本+利润",{"id":286,"libraryId":5,"type":9,"typeLabel":15,"stem":287,"options":288,"answer":26,"analysis":32},953506,"公司法人治理结构中的经营管理层是执行机构，在( )授权范围内负责建设项目的经营管理。",[289,290,292,293],{"key":19,"text":218,"correct":21},{"key":23,"text":291,"correct":21},"股东会",{"key":26,"text":222,"correct":28},{"key":30,"text":220,"correct":21},{"id":295,"libraryId":5,"type":9,"typeLabel":15,"stem":296,"options":297,"answer":19,"analysis":32},953507,"在国内的工程实践中，由于传统观念和思想的影响，多数建设单位都愿意采取自行项目管理模式。即使根据有关规定和要求，在施工阶段委托工程监理单位进行现场监督管理，但在设计阶段、招标阶段、施工阶段、安装调试和保修阶段的主要项目管理任务都是由( )自己组织完成。",[298,300,302,304],{"key":19,"text":299,"correct":28},"建设单位",{"key":23,"text":301,"correct":21},"设计单位",{"key":26,"text":303,"correct":21},"承包单位",{"key":30,"text":305,"correct":21},"监理单位",{"id":307,"libraryId":5,"type":9,"typeLabel":15,"stem":308,"options":309,"answer":23,"analysis":32},953508,"根据新修订的《中华人民共和国公司法》的规定，可以设立一人有限责任公司，即只有一个自然人股东或者一个法人股东的有限责任公司，其注册资本最低限额为人民币( )万元。",[310,312,314,316],{"key":19,"text":311,"correct":21},"3",{"key":23,"text":313,"correct":28},"10",{"key":26,"text":315,"correct":21},"50",{"key":30,"text":317,"correct":21},"100",{"id":319,"libraryId":5,"type":9,"typeLabel":15,"stem":320,"options":321,"answer":19,"analysis":32},953509,"特许经营项目常用模式中，( )意味着一种很低的民营化程度，因为项目设施的所有权并不转移给项目公司。",[322,324,326,328],{"key":19,"text":323,"correct":28},"BOT",{"key":23,"text":325,"correct":21},"BOOT",{"key":26,"text":327,"correct":21},"BOO",{"key":30,"text":329,"correct":21},"TOT",{"id":331,"libraryId":5,"type":9,"typeLabel":15,"stem":332,"options":333,"answer":26,"analysis":32},953510,"关于特许经营项目常用模式中BOOT与BOT的区别的叙述，不正确的是( )。",[334,336,338,340],{"key":19,"text":335,"correct":21},"BOT方式，项目建成后，项目公司只拥有项目的经营权",{"key":23,"text":337,"correct":21},"BOOT方式，在项目建成后，在规定的期限内，项目公司既有经营权，也有所有权",{"key":26,"text":339,"correct":28},"采取BOT方式，从项目建成到移交给政府这一段时间一般比采取BOOT方式长一些",{"key":30,"text":341,"correct":21},"采取BOT方式，从项目建成到移交给政府这一段时间一般比采取BOOT方式短一些",{"id":343,"libraryId":5,"type":9,"typeLabel":15,"stem":344,"options":345,"answer":23,"analysis":32},953511,"对建设项目法人责任制的表述中，有误的是( )。",[346,348,350,352],{"key":19,"text":347,"correct":21},"建设项目法人的责任涵盖建设项目的全寿命周期",{"key":23,"text":349,"correct":28},"建设项目法人的责任仅包括对建设项目的策划、资金筹措、建设实施三方面",{"key":26,"text":351,"correct":21},"建设项目投资人必须按照一定的法律程序和有关规定组建法人",{"key":30,"text":353,"correct":21},"由建设项目投资人依法组建的法人，对建设项目的策划、资金筹措、建设实施、生产经营、偿还债务和资产的保值增值等实行全过程负责",{"id":355,"libraryId":5,"type":9,"typeLabel":15,"stem":356,"options":357,"answer":23,"analysis":32},953512,"根据法人是否具有( )可以将其分为企业法人和非企业法人。",[358,360,362,364],{"key":19,"text":359,"correct":21},"组织性",{"key":23,"text":361,"correct":28},"营利性",{"key":26,"text":363,"correct":21},"强制性",{"key":30,"text":365,"correct":21},"权威性",{"id":367,"libraryId":5,"type":9,"typeLabel":15,"stem":368,"options":369,"answer":30,"analysis":32},953513,"根据新修订的《中华人民共和国公司法》的规定，股份有限公司的注册资本的最低限额为人民币( )万元。",[370,371,373,375],{"key":19,"text":317,"correct":21},{"key":23,"text":372,"correct":21},"200",{"key":26,"text":374,"correct":21},"300",{"key":30,"text":376,"correct":28},"500",{"id":378,"libraryId":5,"type":9,"typeLabel":15,"stem":379,"options":380,"answer":19,"analysis":32},953514,"根据新修订的《中华人民共和国公司法》的规定，有限责任公司的注册资本的最低限额为人民币( )万元。",[381,382,383,384],{"key":19,"text":311,"correct":28},{"key":23,"text":313,"correct":21},{"key":26,"text":315,"correct":21},{"key":30,"text":317,"correct":21},{"id":386,"libraryId":5,"type":9,"typeLabel":15,"stem":387,"options":388,"answer":26,"analysis":32},953515,"对特许经营项目常用模式中BOT与BOOT、BOO的相关表述，有误的是( )。",[389,391,393,395],{"key":19,"text":390,"correct":21},"BOT既是一种融资方式，也是一种投资方式",{"key":23,"text":392,"correct":21},"BOT是一种基本模式，BOO和BOOT是属于BOT基本模式的变化与发展模式",{"key":26,"text":394,"correct":28},"BOO是一种基本模式，BOT和BOOT是属于BOO基本模式的变化与发展模式",{"key":30,"text":396,"correct":21},"世界银行在《1994年世界发展报告》中指出，BOT有三种具体形式，即BOT、BOOT和BOO",{"id":398,"libraryId":5,"type":9,"typeLabel":15,"stem":399,"options":400,"answer":30,"analysis":32},953516,"特许经营项目常用模式中，( )代表的是一种最彻底的民营化，项目设施没有任何时间限制地被转移给项目公司。",[401,402,403,404],{"key":19,"text":325,"correct":21},{"key":23,"text":323,"correct":21},{"key":26,"text":329,"correct":21},{"key":30,"text":327,"correct":28},{"id":406,"libraryId":5,"type":9,"typeLabel":15,"stem":407,"options":408,"answer":30,"analysis":32},953517,"对施工总承包特点的叙述中，有误的是( )。",[409,411,413,415],{"key":19,"text":410,"correct":21},"建设项目业主只需要进行一次招标",{"key":23,"text":412,"correct":21},"一般要等施工图设计全部结束后，才能进行施工总承包的招标，开工日期较迟",{"key":26,"text":414,"correct":21},"建设项目业主只负责对施工总承包单位的管理及组织协调，对建设项目业主比较有利",{"key":30,"text":416,"correct":28},"一般以施工图设计为投标报价的基础，投标人的投标报价较有依据，有利于实行单价合同",{"id":418,"libraryId":5,"type":9,"typeLabel":15,"stem":419,"options":420,"answer":23,"analysis":32},953518,"下列模式中，( )模式是一种新型的工程建设组织与管理模式。 A:项目总控模式",[421,423,425,426],{"key":19,"text":422,"correct":21},"合作伙伴",{"key":23,"text":424,"correct":28},"项目管理承包(PM",{"key":26,"text":266,"correct":21},{"key":30,"text":270,"correct":21},{"id":428,"libraryId":5,"type":9,"typeLabel":15,"stem":429,"options":430,"answer":23,"analysis":32},953519,"股份有限公司设监事会，监事会应当包括股东代表和适当比例的公司职工代表，其中职工代表的比例不得低于( )，具体比例由公司章程规定。",[431,433,435,437],{"key":19,"text":432,"correct":21},"1\u002F4",{"key":23,"text":434,"correct":28},"1\u002F3",{"key":26,"text":436,"correct":21},"1\u002F2",{"key":30,"text":438,"correct":21},"2\u002F3",{"id":440,"libraryId":5,"type":9,"typeLabel":15,"stem":441,"options":442,"answer":26,"analysis":32},953520,"有限责任公司设立董事会，其成员为( )人。",[443,445,447,449],{"key":19,"text":444,"correct":21},"1～3",{"key":23,"text":446,"correct":21},"2～5",{"key":26,"text":448,"correct":28},"3～13",{"key":30,"text":450,"correct":21},"5～15",{"id":452,"libraryId":5,"type":9,"typeLabel":15,"stem":453,"options":454,"answer":19,"analysis":32},953521,"合作伙伴模式包括( )。",[455,457,459,461],{"key":19,"text":456,"correct":28},"协议系统、评价系统和争议处理系统",{"key":23,"text":458,"correct":21},"协议系统、评价系统和信息交易系统",{"key":26,"text":460,"correct":21},"信息交易系统、评价系统和争议处理系统",{"key":30,"text":462,"correct":21},"协议系统、争议处理系统和信息交易系统",{"id":464,"libraryId":5,"type":9,"typeLabel":15,"stem":465,"options":466,"answer":19,"analysis":32},953522,"投资者在建设项目( )，要根据项目的总目标，对投资产权结构做出谨慎选择。",[467,469,471,473],{"key":19,"text":468,"correct":28},"决策阶段",{"key":23,"text":470,"correct":21},"竣工阶段",{"key":26,"text":472,"correct":21},"实施阶段",{"key":30,"text":474,"correct":21},"施工与安装阶段",{"id":476,"libraryId":5,"type":9,"typeLabel":15,"stem":477,"options":478,"answer":19,"analysis":32},953523,"公司法人治理结构中，( )是权力机构，由出资人即股东组成，是建设项目资产的拥有者。",[479,480,481,482],{"key":19,"text":291,"correct":28},{"key":23,"text":222,"correct":21},{"key":26,"text":220,"correct":21},{"key":30,"text":218,"correct":21},{"id":484,"libraryId":5,"type":9,"typeLabel":15,"stem":485,"options":486,"answer":23,"analysis":32},953524,"公司法人治理结构中，( )是决策机构，代表股东的利益，对建设项目重大事项行使决策权，并负责选择经营管理者。",[487,488,489,490],{"key":19,"text":218,"correct":21},{"key":23,"text":222,"correct":28},{"key":26,"text":291,"correct":21},{"key":30,"text":220,"correct":21},{"id":492,"libraryId":5,"type":9,"typeLabel":15,"stem":493,"options":494,"answer":19,"analysis":32},953525,"对特许经营项目常用模式中，BOO即( )。",[495,497,499,501],{"key":19,"text":496,"correct":28},"建设-拥有-经营",{"key":23,"text":498,"correct":21},"经营-拥有-建设",{"key":26,"text":500,"correct":21},"拥有-建设-经营-转让",{"key":30,"text":502,"correct":21},"建设-经营-转让-拥有",{"id":504,"libraryId":5,"type":9,"typeLabel":15,"stem":505,"options":506,"answer":19,"analysis":32},953526,"有限责任公司设监事会，其成员不得少于( )人。",[507,508,510,512],{"key":19,"text":311,"correct":28},{"key":23,"text":509,"correct":21},"5",{"key":26,"text":511,"correct":21},"7",{"key":30,"text":513,"correct":21},"9",{"id":515,"libraryId":5,"type":9,"typeLabel":15,"stem":516,"options":517,"answer":19,"analysis":32},953527,"针对临时性组织情况，在建设项目总承包内部关系的处理上，国外一般做法是在设计阶段由设计单位负责，在投标和施工阶段由施工单位负责，而整个建设项目的经济风险由( )承担。",[518,520,521,523],{"key":19,"text":519,"correct":28},"施工单位",{"key":23,"text":301,"correct":21},{"key":26,"text":522,"correct":21},"施工单位和监理单位连带",{"key":30,"text":524,"correct":21},"施工单位和设计单位连带",{"id":526,"libraryId":5,"type":9,"typeLabel":15,"stem":527,"options":528,"answer":23,"analysis":32},953528,"多应用于工艺复杂、设备装置较多，且业主对这些专业技术不熟悉的大型工业项目的是( )。",[529,530,532,533],{"key":19,"text":268,"correct":21},{"key":23,"text":531,"correct":28},"PMC模式",{"key":26,"text":272,"correct":21},{"key":30,"text":270,"correct":21},{"id":535,"libraryId":5,"type":9,"typeLabel":15,"stem":536,"options":537,"answer":19,"analysis":32},953529,"下列单位中，( )是业主机构的延伸，全过程(从策划阶段一直到实施阶段)为建设项目业主服务，对项目的实施负责，与建设项目业主的目标和利益保持一致。",[538,540,542,544],{"key":19,"text":539,"correct":28},"PMC单位",{"key":23,"text":541,"correct":21},"CM单位",{"key":26,"text":543,"correct":21},"政府",{"key":30,"text":545,"correct":21},"工程咨询服务机构",{"id":547,"libraryId":5,"type":9,"typeLabel":15,"stem":548,"options":549,"answer":26,"analysis":32},953530,"业主与项目参与各方之间为了取得最大的资源效益，在相互信任、资源共享的基础上达成的一种短期或长期的相互协定属于( )模式。 A:CM",[550,552,553],{"key":19,"text":551,"correct":21},"项目总控",{"key":23,"text":422,"correct":21},{"key":26,"text":424,"correct":28},{"id":555,"libraryId":5,"type":9,"typeLabel":15,"stem":556,"options":557,"answer":26,"analysis":32},953531,"采取设计和施工总承包模式时，如果项目不中标，建设项目业主会给予投标者以经济补偿，其分配原则一般是设计单位得到( )。",[558,560,562,564],{"key":19,"text":559,"correct":21},"20%～30%",{"key":23,"text":561,"correct":21},"50%～60%",{"key":26,"text":563,"correct":28},"70%～80%",{"key":30,"text":565,"correct":21},"80%～90%",[567,570,573,576,579,582],{"id":9,"name":568,"category":7,"favorite":569},"领导干部任职前廉政法规知识测试题",92,{"id":571,"name":572,"category":7,"favorite":9},595,"建筑结构与设备",{"id":574,"name":575,"category":7,"favorite":9},715,"招标采购专业知识与法律法规",{"id":577,"name":578,"category":7,"favorite":9},848,"市政方向-通用基础",{"id":580,"name":581,"category":7,"favorite":8},534,"BIM工程师",{"id":583,"name":581,"category":7,"favorite":8},535]