[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-953722":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},953722,691,2,"多选题","项目中沟通的对象包括( )。",[11,15,18,21,24],{"key":12,"text":13,"correct":14},"A","项目管理团队内部的沟通",true,{"key":16,"text":17,"correct":14},"B","与上级管理层的沟通",{"key":19,"text":20,"correct":14},"C","与项目参与方的沟通",{"key":22,"text":23,"correct":14},"D","与项目外层利益相关人的沟通",{"key":25,"text":26,"correct":27},"E","与其他项目管理团队的沟通",false,"ABCD","",{"id":6,"name":31,"category":32,"favorite":33},"投资建设项目组织","建筑工程",0]