[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-953714":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},953714,691,2,"多选题","业主方管理部门的进度控制任务包括( )。",[11,15,18,22,25],{"key":12,"text":13,"correct":14},"A","编制进度控制最终报告",true,{"key":16,"text":17,"correct":14},"B","参加评标及合同谈判",{"key":19,"text":20,"correct":21},"C","审核及处理施工索赔事宜",false,{"key":23,"text":24,"correct":14},"D","审核设计进度计划并控制其执行",{"key":26,"text":27,"correct":14},"E","审核招标文件和合同文件中有关进度的条款","ABDE","",{"id":6,"name":31,"category":32,"favorite":33},"投资建设项目组织","建筑工程",0]