[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-953706":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},953706,691,2,"多选题","PMC单位在项目实施阶段，代表或协助建设项目业主主要进行的工作包括( )。",[11,15,19,22,25],{"key":12,"text":13,"correct":14},"A","提供项目融资方案，协助建设项目业主完成融资工作",false,{"key":16,"text":17,"correct":18},"B","参加调试、装置性能考核(如有)和竣工验收",true,{"key":20,"text":21,"correct":18},"C","向建设项目业主移交项目全部文件资料",{"key":23,"text":24,"correct":18},"D","编制并发布建设项目统一的管理制度、工作流程、信息流程",{"key":26,"text":27,"correct":18},"E","对建设项目总承包单位(如有)、施工和供货单位进行全面管理","BCDE","",{"id":6,"name":31,"category":32,"favorite":33},"投资建设项目组织","建筑工程",0]