[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-953702":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},953702,691,2,"多选题","PMC单位在项目设计阶段，代表或协助建设项目业主主要进行的工作包括( )。",[11,15,18,22,25],{"key":12,"text":13,"correct":14},"A","对设计过程和设计成果进行管理",true,{"key":16,"text":17,"correct":14},"B","完成项目初步设计(需要时)",{"key":19,"text":20,"correct":21},"C","制定工程发包和设备材料采购策略",false,{"key":23,"text":24,"correct":14},"D","完成项目施工图设计(需要时)",{"key":26,"text":27,"correct":14},"E","提出项目统一遵循的标准、规范和规定","ABDE","",{"id":6,"name":31,"category":32,"favorite":33},"投资建设项目组织","建筑工程",0]