[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-953694":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},953694,691,2,"多选题","业主方管理部门的质量控制任务有( )。",[11,15,18,22,25],{"key":12,"text":13,"correct":14},"A","编制项目安全管理方案",false,{"key":16,"text":17,"correct":14},"B","组织现场安全综合检查",{"key":19,"text":20,"correct":21},"C","组织施工图图纸审核、确认及组织施工图交底",true,{"key":23,"text":24,"correct":21},"D","对分包单位确认，并审核施工单位的质量保证体系",{"key":26,"text":27,"correct":21},"E","检查施工质量，包括参与分部、分项工程和各隐蔽工程验收","CDE","",{"id":6,"name":31,"category":32,"favorite":33},"投资建设项目组织","建筑工程",0]