[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-953659":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},953659,691,2,"多选题","设计与施工的分离也导致了许多问题，主要有( )。",[11,15,19,22,25],{"key":12,"text":13,"correct":14},"A","建设单位的组织、协调工作量大",true,{"key":16,"text":17,"correct":18},"B","若施工图完成以后再进行施工任务的发包，项目建设周期短",false,{"key":20,"text":21,"correct":14},"C","建设单位项目目标的控制有困难，主要是不利于投资控制和进度控制",{"key":23,"text":24,"correct":14},"D","施工单位\"按图施工\"，基本上处于被动地位，在一定程度上影响了其积极性的发挥",{"key":26,"text":27,"correct":14},"E","设计单位较少了解施工，有时也较少考虑可施工性，会影响施工的有效进行","ACDE","",{"id":6,"name":31,"category":32,"favorite":33},"投资建设项目组织","建筑工程",0]