[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-953653":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},953653,691,2,"多选题","影响一个系统目标实现的主要因素除了组织因素以外，还有人的因素，其中人的因素包括( )。",[11,15,19,22,25],{"key":12,"text":13,"correct":14},"A","建设单位和所有参与单位的管理的方法与工具",false,{"key":16,"text":17,"correct":18},"B","该项目所有参与单位(设计、工程监理、施工、供货单位等)的生产人员的数量",true,{"key":20,"text":21,"correct":18},"C","该项目所有参与单位(设计、工程监理、施工、供货单位等)的生产人员的质量",{"key":23,"text":24,"correct":18},"D","建设单位和该项目所有参与单位(设计、工程监理、施工、供货单位等)的管理人员的数量",{"key":26,"text":27,"correct":18},"E","建设单位和该项目所有参与单位(设计、工程监理、施工、供货单位等)的管理人员的质量","BCDE","",{"id":6,"name":31,"category":32,"favorite":33},"投资建设项目组织","建筑工程",0]