[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-953650":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},953650,691,2,"多选题","20世纪50年代，我国从当时的苏联引进了施工组织设计的管理技术，它的主要内容包括( )。",[11,15,19,22,25],{"key":12,"text":13,"correct":14},"A","合同结构",false,{"key":16,"text":17,"correct":18},"B","施工进度计划",true,{"key":20,"text":21,"correct":18},"C","施工平面图",{"key":23,"text":24,"correct":18},"D","施工安全",{"key":26,"text":27,"correct":18},"E","质量保证体系","BCDE","",{"id":6,"name":31,"category":32,"favorite":33},"投资建设项目组织","建筑工程",0]