[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-953649":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},953649,691,2,"多选题","每一个建设项目应根据其特点，从多个可能的工作流程方案中确定( )等主要的工作流程组织。",[11,15,18,21,24],{"key":12,"text":13,"correct":14},"A","设计准备工作的流程",true,{"key":16,"text":17,"correct":14},"B","施工招标工作的流程",{"key":19,"text":20,"correct":14},"C","物资采购工作的流程",{"key":22,"text":23,"correct":14},"D","施工作业的流程",{"key":25,"text":26,"correct":27},"E","所有信息处理的流程",false,"ABCD","",{"id":6,"name":31,"category":32,"favorite":33},"投资建设项目组织","建筑工程",0]